    A higher standard, I'm not party to the details but it involved ultrasonic axle testing of each vehicle involved that didn't usually run at the higher speed and an increased frequency of examination. Along with various restrictions upon the line, eg Quorn and Swithland signalbox switched out of circuit as it is signalled for 60mph not 75mph, and no member of staff lineside with access to the railway through gates chained and padlocked.
     
    acorb und Matt37401 gefällt dies.
  2. Matt37401

    Matt37401 Nat Pres stalwart

    Registriert seit:
    8 Juni 2014
    Beiträge:
    15.551
    Zustimmungen:
    11.955
    Ort:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cheers Jamie.
     
  3. sycamore

    sycamore Member

    Registriert seit:
    17 August 2009
    Beiträge:
    596
    Zustimmungen:
    238
    Geschlecht:
    männlich
    Beruf:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    Ort:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is there any news on the A60 bridge progress does anybody know? Not seen an update since the bridge lift.

    TIA
    Will
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The new bridge went in on time, but I don't think any ballast or track has been put on it yet. I would think there is a waterproof membrane and some covering though.
     
  5. jasa76

    jasa76 New Member

    Registriert seit:
    11 Mai 2016
    Beiträge:
    96
    Zustimmungen:
    24
    Geschlecht:
    männlich
    Ort:
    Nottingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thats what I was told as well at the weekend when having a tour of the shed. On the canal bridge they have put a covering of ballast, but its not up to the level of the surrounding ground as there's a distinct lip. I imagine that they will wait until all the work is done, so that it the track and ballast can be laid all the way through to make sure that its all aligned.
     
  6. Mark_108

    Mark_108 New Member

    Registriert seit:
    10 März 2015
    Beiträge:
    37
    Zustimmungen:
    19
    Geschlecht:
    männlich
    Beruf:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is already ballast north and south of the A60 bridge so it would be more of a 'fill in' job, to the heights already in place, for where the running line off the chord and beyond is/was. The non running line had the ballast removed years ago to reduce the load on the bridge structure.

    I suspect its more to do with EMRT not having anyone currently who does anything on that part of the line (as GCR have not taken it on, and they took it off GCRN) so would need contractors and somebody else to organise it.

    It makes sense to put something down as the water proofing may well by sensitive to UV, a layer of ballast is pretty effective at protecting such things
     
    Last edited: 20 Juni 2023
    Chris86 und J Rob't Harrison gefällt dies.
  7. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is believed that the planning permission has been applied for for the "Factory Fly-over" section and the fund raising has nearly reached the £2M mark....according to talk during the Q W & W weekend on the FoGCRML stand. So hopefully there will be an official update soon.
     
    Hando, Johnme101, CH 19 und 2 anderen gefällt dies.
  8. Mark_108

    Mark_108 New Member

    Registriert seit:
    10 März 2015
    Beiträge:
    37
    Zustimmungen:
    19
    Geschlecht:
    männlich
    Beruf:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing showing on the Charnwood planning portal
     
  9. brmp201

    brmp201 Member

    Registriert seit:
    18 Mai 2010
    Beiträge:
    614
    Zustimmungen:
    964
    Geschlecht:
    männlich
    Beruf:
    IT Director
    Ort:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hando, Johnme101 und The Dainton Banker gefällt dies.
  10. J Rob't Harrison

    J Rob't Harrison Member

    Registriert seit:
    6 November 2016
    Beiträge:
    240
    Zustimmungen:
    360
    Geschlecht:
    männlich
    Ort:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A memorandum of understanding between Loughborough and Ruddington is good news indeed. It makes me a bit more minded to restart my direct debit...
     
    GOEdwards, Flying Phil und brmp201 gefällt dies.
  11. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is also a new 12 page leaflet about the project. This can be viewed via the GCR website in the Reunification August update.
     
    Hando, brmp201 und J Rob't Harrison gefällt dies.
  12. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was a meeting of a new joint committee (GCR plus GCR(N) plus others) to help the planning and implementation of Reunification according to the latest GCR Video update.
    It also implied that more paperwork/plans need to be finalised before it (Factory Flyover) can to go to the Planning dept.
     
  13. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.318
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The latest GM Update video has the news that the track is to be relayed over the A60 bridge this month. So a little bit more progress.
     
  14. bristolian

    bristolian Member

    Registriert seit:
    25 Juli 2005
    Beiträge:
    531
    Zustimmungen:
    297
    Geschlecht:
    männlich
    Ort:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do you have a link to the video, please?.
     
    Andrew MI gefällt dies.
  15. J Rob't Harrison

    J Rob't Harrison Member

    Registriert seit:
    6 November 2016
    Beiträge:
    240
    Zustimmungen:
    360
    Geschlecht:
    männlich
    Ort:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An interesting update in the latest copy of Mainline. I'm very pleased to be reading about the establishment of a dedicated project board (it's beyond me why it's taken so long to recognise that such a body is a Good Thing to Have with a project like this). I'm considering whether the project has been turned around enough to warrant my re-starting my direct debit in support.
    The really interesting bit though is that "it transpires doubling to Leicester North isn't just nice to do but very important when the line is 18 miles long". Now there's something I'd definitely be minded to contribute toward.
     
    Gareth, CoalFiredGeek und acorb gefällt dies.
  16. WesternRegionHampshireman

    WesternRegionHampshireman Well-Known Member

    Registriert seit:
    25 September 2021
    Beiträge:
    1.188
    Zustimmungen:
    222
    Geschlecht:
    männlich
    Ort:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So when both sites are joined together, it's going to be 18 miles long?
     
    Last edited by a moderator: 14 Dezember 2023
  17. Andrew MI

    Andrew MI New Member

    Registriert seit:
    5 Januar 2022
    Beiträge:
    23
    Zustimmungen:
    19
    Ort:
    Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably the reason why doubling to Leicester North is very important is an operational reason? I am very much not familiar with that, but can anyone shed any light on or unpack this please?
     
  18. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    28.729
    Zustimmungen:
    28.654
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm also curious about this, especially when north of Loughborough is predominantly single track.
     
    MuzTrem gefällt dies.
  19. Gav106

    Gav106 Well-Known Member

    Registriert seit:
    29 März 2010
    Beiträge:
    1.772
    Zustimmungen:
    2.170
    Ort:
    Nantwich, Cheshire
    If that museum gets built one day then surely you would want to maximise the traffic able to get to it?
     
  20. Belgarath001

    Belgarath001 New Member

    Registriert seit:
    2 April 2012
    Beiträge:
    149
    Zustimmungen:
    382
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes.

    Elsewhere in Mainline, it mentions "one of the tasks currently being undertaken is understanding future timetables to help inform what infrastructure might be needed to ensure there is the right level of flexibility and avoidance of pinch points. Early work suggests that very quickly the single track between Rothley and Leicester North becomes a considerable timetable constraint." I don't know how this ties in to @35B's point about north of Loughborough, and the presumably even bigger constraint of the 10 mile single track with loops. But I'm confident it's being looked at, and if it's early days still, there may be no point in mentioning anything whilst the study continues.

    Also worth mentioning from Mainline I think, given previous concerns, is the news of the drafting of a Memorandum of Understanding between GCR PLC and GCR(N), setting out how the two organisations work towards aligning processes, systems and ways of working explicitly with the intent of being able to operate as one railway.
     