    Can't help but think if they are keen to see a GW 2-8-0 working again there is a perfectly good, complete example parked in the shed.....and if 2861's boiler is now kicking about spare, maybe resources would be better spent on that, to speed the overhaul of 3822 along.......

    That, I would donate to.


    Chris
     
    已获得Great Western147226D_M的支持.
  2. clinker

    clinker Member

    注册日期:
    2016-10-08
    帖子:
    612
    支持:
    372
    性别:
    所在地:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No matter which way it is looked at both of the boilers in question spent over a decade essentially standing on a beach in salt laden atmosphere and wrapped in hydroscopic asbestos, their condition upon withdrawal is immaterial they will neither be in immediately usable nor indeed good condition, they will require the same number of replacement fittings as a new boiler will require, so that will not be a saving, and in any case neither will be authentic to the admittedly already unauthentic resulting locomotive. Neither boiler will be in any way shape or form a saving.
     
    已获得robinboyle, Chuffington, Matt37401另外1人的支持.
  3. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,914
    支持:
    5,854
    Granted either would consume a lot of cash, but how do you reckon there would be no saving at all over building completely new?
     
  4. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,270
    支持:
    12,520
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But what you forget is this, its not a shiny new toy to play with, 3822, won't get the publicity, the lines in the magazine's or the attention, where as a plan to build an existent class from an otherwise restorable engine, your bound to get article following article, and the chance to glow in the adoration, until it wanes, then you have to dream up the next one,
     
    已获得RomseyGreat WesternMatt37401的支持.
  5. clinker

    clinker Member

    注册日期:
    2016-10-08
    帖子:
    612
    支持:
    372
    性别:
    所在地:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Where would You like Me to start? labour is going to be very expensive, even if You use 'Paid Enthusiast' labour, money will run away with You, No decent owner/group would expect volunteers to carry out major boilerwork, removing rivets isn't quick or simple, you pay for the skill/training that the tradesman who removes them has had, likewise welding, even qualified paid enthusiast welders are going to cost, then theres the odd bits of asbestos that You're likely to find, You can't just throw it in the bin, decontamination costs money, and whilst a reconditioned boiler is appropriate for the loco that it came off of, or one that used a similar type of boiler,But if You claim to have a shiny all whistles and bells new build locomotive, even if it is really an assemblage of reconditioned parts of other loco's of different classes that have ceased to exist for the sole purpose of making something that looks like what it isn't, then I feel that It's not appropriate. So essentially doing the job properly makes far more sense, whichever way You look at it.
     
    已获得S.A.C. MartinMatt37401的支持.
  6. estwdjhn

    estwdjhn Member

    注册日期:
    2013-01-24
    帖子:
    343
    支持:
    696
    职业:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm no fan of cutting up Thornbury to make some halfhearted GWR bitsa, but I think you'd be surprised just how much boiler work some volunteers do. I often encourage heritage railways to have a go at doing some of their own rather than just getting the chequebook out every time. Yes, some of it is skilled work, but it's skills which anyone with a suitable aptitude can learn, and there is also quite a lot of time consuming semi-skilled work which anyone with a bit of ability can do quite easily.

    I'm a Foxfield volunteer outside of work, we did almost all the work on "Marston Thompson and Evershed No3" other than the coded welding in house on a voluntary basis, and probably 80% of the work was done by people who aren't boilersmiths by trade. We had the inner firebox out, replaced half the outer firebox, put a patch in the bottom of the back barrel stage. Granted that particular example was only a small loco boiler, but they are all pretty much the same to work on - it's just there's more of everything on a big one.
     
    已获得Hirn, misspentyouth62, Johnme101另外10人的支持.
  7. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,914
    支持:
    5,854
    Yes of course restoring an old boiler and building a new one are both very expensive projects. But you have not explained why you think restoring an old one would not save any money at all. (N.B. The respective costs are a separate issue from the rights and wrongs of using the Castle boiler.)
     
    已获得D103935B的支持.
  8. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,734
    支持:
    11,853
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Depending on what needs doing there is a crossover point where it becomes cheaper to build new. With overhauling a boiler you have to remove old material and that costs money. If the firebox has to come out removing all those stays and taking out the foundation ring is very labour intensive and, if that labour is being paid for, very expensive. You then have to fettle all the stay holes, measure everything up and custom make every stay. With new, everything will be to a standard size, so much easier. That's just one example, there are others.
     
    已获得S.A.C. MartinMellishR的支持.
  9. Mrcow

    Mrcow Member

    注册日期:
    2019-06-30
    帖子:
    273
    支持:
    635
    性别:
    所在地:
    Sheffield
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    These are all very valid points and everything, but if a used boiler saves no money why doesn't everyone just throw their boilers away every 10 years?

    The same ground is being covered so often it's muddier than the Somme :)
     
    已获得Spinner, MellishR, Spitfire另外6人的支持.
  10. 21B

    21B Part of the furniture

    注册日期:
    2009-09-02
    帖子:
    3,907
    支持:
    8,713
    Another factor can be that whilst the repair to the boiler is viable the repair at the following overhaul is not and so it becomes better to build new now. An example of that was the inner firebox on 35005. Just about repairable, but very very little prospect of a further repair in the future. The repair would have been hugely complex and involved many patches in awkward places with the prospect that some might not work first time. So whilst in theory the repair might be cheaper, the risk was high that it would t be completed and if it had failed then you’d be left with having paid all those costs AND then still needed to find the replacement cost anyway. Risk is not a cash cost, but has to be taken into account in any sensible decision.
     
    已获得Spinner, clinker, Hampshire Unit另外1人的支持.
  11. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,005
    支持:
    3,026
    Clearly, in the preservation era so far, it's been cheaper most of the time (with a growing number of exceptions) to repair original boilers rather than build new ones. As the residual life of original components gets used up (whether that's a result of wear & tear, or poor storage conditions) perhaps that balance'll be changing in future.
     
    已获得MellishRHampshire Unit的支持.
  12. D1039

    D1039 Guest

    I know just about enough to know which end the chimney goes, but know that the SVR too encourages its owning group volunteers to undertake boiler overhaul work, under supervision. 2857 in particular was a volunteer project last time round

    Society volunteers started work on the overhaul of the boiler under the guidance of the SVR boilersmith at that time Graham Beddow. The work undertaken was quite phenomenal for a bunch of inexperienced volunteers and included cutting the side plates for wedling [sic] in of new patches, drilling out of all the boiler stays, manufacture of a new copper tubeplate, building and fitting a new smokebox, fitting a new front tubeplate, removal and subsequent refitting of the foundation ring, fitting over 1200 new stays – in short much of the complex work associated with a full boiler overhaul.
     
  13. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On reading this the expression "dog with a bone....." comes to mind. Do you have any evidence for your assertions?
     
    已获得Spitfire的支持.
  14. Fireline

    Fireline Well-Known Member

    注册日期:
    2008-02-11
    帖子:
    1,305
    支持:
    1,356
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    4253 were going to do exactly that, and got quite some way into it, too. In fact, the deciding factor in contracting the remains of the boiler repairs out was not labour, but that we couldn't get the longitudinal stays in in our Bedouin tent!
     
    已获得S.A.C. MartinChris86Jamessquared的支持.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,806
    支持:
    64,518
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wonder whether, in all the thousands of years of human communication, that phrase has ever been said before!

    Tom
     
    已获得Romsey, Spinner, big.stu另外10人的支持.
  16. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    注册日期:
    2005-09-12
    帖子:
    10,148
    支持:
    9,777
    性别:
    所在地:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    to be fair 1014, 6880, 3840, 5551 , get a fair amount of coverage and even allowing for 1014 being an itsa bitsa frankenstein engine it is lauded on many forums

    Given the travails of 5551 under their ex chair , if it is one and the same who instigated 1014 and seems fairly heavily involved it will be interesting to see what comes out.
     
  17. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To be clear, its not the "frankenengine" comments that disturbed me, it was the accusations laid against the motivations of those involved; rather like the same person's repeated statements that the Chairman of the WSR engineered the departure of 53808 and 44422 because he wanted the line to have a wholly GWR loco fleet. I've never seen anything that would support these contentions and I simply don't think that anyone making them deserves to go unchallenged (I will add that I have no connection with either case).
     
    已获得JBTEvansMiff的支持.
  18. Thompson1706

    Thompson1706 Part of the furniture

    注册日期:
    2007-11-19
    帖子:
    2,524
    支持:
    1,886
    性别:
    职业:
    Retired
    所在地:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can we start a thread concerning the breaking up of 2861 , as i'm fed up with the constant moaning about 7027. Who can tell me the number of the first steam loco broken up at Llangollen ?

    Bob.
     
    已获得MrcowJBTEvans的支持.
  19. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,235
    支持:
    17,567
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do the GWS contract out boiler work, from recollection both 6023 and 4079 boilers were done on site so no reason why the one for 4709 (whichever they choose to use in the end - at the present rate I can see them sniffing around the WC/BOB one at Carnforth eventually) cannot be done in the same way?
     
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,806
    支持:
    64,518
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have a hunch there are probably two reasons. One is an innate conservatism (not necessarily a bad thing) in the movement that always considers first "how do we repair" rather than "how do we replace". Even when that means over two or three overhauls more or less everything has been replaced, but not all at once.

    The other is a tendency not to fully cost either time out of service of a loco, or workshop space, or the cost of capital tied up in a protracted repair before any value is delivered. So a fully commercial business, once it has decided to spend £x on an overhaul, will want to do that as quickly as possible once started, so it can get the loco out of the workshop and back into traffic earning money. Most heritage railways don't consider the cost of funds tied up in the same way, so given a choice between a long project delivered slightly more cheaply in cash terms, or a quicker project that costs more in cash, tend to prefer the long project; a commercial entity may decide the quicker project represents better value for money.

    (In that regard, the A1 Trust are quite anomalous, seemingly prioritising speed over cost, i.e. their business model is predicated on getting an out-of-traffic loco back into traffic and earning money as quickly as possible: it's a more commercial focus than is typically found in many railway organisations).

    Tom
     
    已获得Hirn, Great Western, Hampshire Unit另外1人的支持.