If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Rumpole, بتاريخ ‏10 اكتوبر 2012.

  1. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,966
    عدد المعجبين:
    6,693
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well 6 coaches runs with two locos now, so today it is an issue of how many you want to put in steam I guess for only two trains a day. I imagine if you needed to run 6 all the time the numbers may stack up differently.
     
  2. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be a clumsy operation and would still require an extra loco crew, but wouldn't a diesel shunter performing a shunt release manoeuvre be a more cost-effective solution?
     
  3. Jupiter

    Jupiter New Member

    إنضم إلينا في:
    ‏8 نوفمبر 2020
    المشاركات:
    127
    عدد المعجبين:
    79
    مكان الإقامة:
    Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, you’re right, I agree, I’m struggling to place the picture exactly.
     
  4. Woof Mk2

    Woof Mk2 Member

    إنضم إلينا في:
    ‏26 اكتوبر 2015
    المشاركات:
    336
    عدد المعجبين:
    244
    الجنس:
    ذكر
    مكان الإقامة:
    Padstow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If it is going to be anywhere it will be Ponderosa - with regard to curvature of track. Am 99% sure its not though.
     
  5. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,966
    عدد المعجبين:
    6,693
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree the trackbed profile fits Ponderosa but with less vegetation (I assume it has grown up since), I would have thought you may see something of the Valley Road and also is the railway not in a shallow cutting between there and Nursery Bridge. Did the railway build up the sides to form a cutting as shown here?
    upload_2023-8-14_14-21-2.png
     
  6. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,739
    عدد المعجبين:
    11,859
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shunt release is both going to be time consuming and tie up people to do so. The passengers have to get off before anything can happen and you can't have people getting on, either. The shunter has to come on, attach and pull the set forward sufficiently to release the train loco. It then has to set back, detach and scarper before the train loco can run round and attach. Whether you allow passengers to remain on the set whilst doing this will depend on the railway's risk assessment and rules but I would suggest not. Such moves may once have been a common happening but not in the 21st century.
    I guess the decision to build the 'box where it is was probably a right decision at the time but has created a bottleneck in doing so. There may have been no alternative, though. I don't know.
     
    Andy Moody و Jamessquared معجبون بهذا.
  7. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,966
    عدد المعجبين:
    6,693
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Shunt release often happens when a railtour visits due to the length of the tour stock. My observations show it is a guaranteed way to ensure your timetable becomes a work of fiction quite quickly.
     
    80104 و Andy Moody معجبون بهذا.
  8. Woof Mk2

    Woof Mk2 Member

    إنضم إلينا في:
    ‏26 اكتوبر 2015
    المشاركات:
    336
    عدد المعجبين:
    244
    الجنس:
    ذكر
    مكان الإقامة:
    Padstow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No the cutting is a per built in 18xx
     
  9. 5914

    5914 New Member

    إنضم إلينا في:
    ‏12 جويلية 2007
    المشاركات:
    185
    عدد المعجبين:
    566
    Sorry if I wasn't clear in the earlier posting, but you are quite correct that it was creating enough space between the two platforms for a platform for the 6th coach (and the dead-space required to cater for stopping short) that created the issue with extending the loop in a useful way. The only option for realigning is the main platform line as the bay line is constrained by the good shed road, which is itself constrained by the goods shed building and the boundary with the bus park on non-railway land.

    When put forward in 2005 the passive provision for 6 coaches, was intended to be a way of incrementally and at little or no cost giving better flexibility for those occasions when six coach trains would already have been considered - mostly for galas or other special occasions, when reversing a loco on to the train in Platform 2 was the normal mode of operation anyway.
     
    أعجب بهذه المشاركة Jamessquared
  10. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,777
    عدد المعجبين:
    28,737
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've not been to Swanage since 1991, so am a little out of date! How does the current layout compare with the pre-closure layout in terms of capacity? Looking at the NLS site, I think I see that the signalbox has been built on a new location, replacing the old (demolished?) one the other side of the line, but can't tell more from that level of detail.
     
  11. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I used the word "clumsy" as a bit of a cover-all to include "time consuming" but timetables can be adjusted if necessary to allow the extra time needed and it might be the only alternative if expensive civil engineering works are to be avoided. The third option of increasing frequencies and staying with the same capacity also brings with it potential timetable issues. It's a real life Gordian knot!
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,291
    عدد المعجبين:
    12,537
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Trouble though is if your loading to 6 bogies, and need a shunt release, and don't timetable in the time needed to shunt release, that means your going to be using two engines to work that service as the only way it can work is to operate on a turn, and turnabout system, so your having two engines doing half the work instead of having 1 engine and loosing the 6th coach, how much difference does it make if you can run the service with 5 bogies all nearly full, compared to 6 with a few empty seats, and save on steaming that extra engine, ort having a diesel crew to work some trips.
     
  13. Andy Moody

    Andy Moody Member

    إنضم إلينا في:
    ‏9 جويلية 2007
    المشاركات:
    549
    عدد المعجبين:
    379
    الوظيفة:
    Retired
    مكان الإقامة:
    71B ex 71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly, Where else would you have placed the signalbox? When the embankment was excavated in 2001 the first thing that occured was an earth slip, the result being that it had to be pile driven before the box could be built, As it happens platform 2 DOES hold 6 coaches but the problem of course is running round the train, Room is at a premium and always has been, hence the need to top and tail.
    WIBN to have two loco's in steam to T&T, but of course coal or the current price of the stuff is a major factor.
    I suspect that the current need, apparently caused by overcrowding of some services, will cease at the end of the month. TBH cannot see what all of the generated fuss on here is about but there you go.
     
  14. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The real trouble is, to put it succinctly, there's no easy answer to the problem.
     
  15. gricerdon

    gricerdon Well-Known Member

    إنضم إلينا في:
    ‏10 مارس 2018
    المشاركات:
    1,802
    عدد المعجبين:
    870
    الجنس:
    ذكر
    الوظيفة:
    Gricer and Grandad
    مكان الإقامة:
    Wallers Ash
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Of course it may not be on the Swanage railway at all. It’s just that when I first saw the photo I immediately thought Harmans Cross
     
  16. Daddsie71b

    Daddsie71b Member Friend

    إنضم إلينا في:
    ‏4 إبريل 2013
    المشاركات:
    945
    عدد المعجبين:
    803
    الجنس:
    ذكر
    مكان الإقامة:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm fairly confident its not the branch. Its the nicely trimmed bush that's throwing me. Cannot think of anywhere on the branch that has those features together, but it does feel like the branch.
     
  17. gricerdon

    gricerdon Well-Known Member

    إنضم إلينا في:
    ‏10 مارس 2018
    المشاركات:
    1,802
    عدد المعجبين:
    870
    الجنس:
    ذكر
    الوظيفة:
    Gricer and Grandad
    مكان الإقامة:
    Wallers Ash
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree they look like the boundary of a domestic location. I think there are some similar bushes on the end of the down platform now. Must go through my images and have a close look
     
  18. Woof Mk2

    Woof Mk2 Member

    إنضم إلينا في:
    ‏26 اكتوبر 2015
    المشاركات:
    336
    عدد المعجبين:
    244
    الجنس:
    ذكر
    مكان الإقامة:
    Padstow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In extending the line we used FBC crane to lay pre ensembled panels of track and not laying sleepers on the ground before laying the rails.
    So I would be very confident in saying this is not a photo of Swanage
     
  19. Alan Kebby

    Alan Kebby Well-Known Member

    إنضم إلينا في:
    ‏18 سبتمبر 2019
    المشاركات:
    1,195
    عدد المعجبين:
    1,252
    الجنس:
    ذكر
    مكان الإقامة:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes most of the line was rebuilt using pre assembled panels. However in the very early years track was laid by putting sleepers on the ground like that. So could it be the outskirts of Swanage somewhere, with the well tended bushes in a garden backing on to the line?
     
  20. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    Not far off I think. The concrete sleepers came from the Northampton end of the branch to Bedford,if I remember rightly about 2000 were purchased. The track panels arrived a bit later from the Alton branch.
     

مشاركة هذه الصفحة