    That gives the lie to the excuse that everyone was too busy to inform potential customers that 34072 would not be running.
     
    已获得osprey的支持.
  2. D7076

    D7076 Well-Known Member

    注册日期:
    2007-12-21
    帖子:
    1,546
    支持:
    709
    But if the roster page is updated by office staff using HOPS as the information source then the roster reflected the information they had .
    HOPS still showing 34072 running tomorrow and Thursday ..but it isn’t .
     
  3. Springs Branch

    Springs Branch New Member

    注册日期:
    2016-03-06
    帖子:
    198
    支持:
    260
    性别:
    职业:
    Retired
    所在地:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    45690 and 48305 announced as guests for the Autumn Steam Gala 13-15 October. 34072 and 34092 also in action.
     
    已获得JBTEvans的支持.
  4. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    注册日期:
    2015-10-02
    帖子:
    7,963
    支持:
    6,692
    性别:
    所在地:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is City of Wells not out of ticket and under overhaul or is it finished already?
     
  5. Chris86

    Chris86 Well-Known Member

    注册日期:
    2011-10-31
    帖子:
    1,577
    支持:
    1,786
    职业:
    Safety, technical and vehicle trainer
    所在地:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    34092 was supposed to be having a fast- track overhaul, if it’s back in service for October that will have been a very rapid turn around!

    Chris
     
  6. Springs Branch

    Springs Branch New Member

    注册日期:
    2016-03-06
    帖子:
    198
    支持:
    260
    性别:
    职业:
    Retired
    所在地:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Finished. Just shows of the quality of the previous overhaul and maintenance since. Hydraulic passed last week, needs repaint & its own tender back, which will require another one to be sent north.
     
    已获得John Rawnsley, MattA, Johnme101另外1人的支持.
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,820
    支持:
    64,614
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hang on - you are saying "hydraulic passed last week" yet also "finished". So a steam test and all the necessary reassembly has taken place in a week?

    Tom
     
  8. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,502
    支持:
    2,859
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    It's...OOOOP North in Lancashire....the land of the "Lancashire Spanner".....
     
  9. black5

    black5 Well-Known Member

    注册日期:
    2006-04-01
    帖子:
    2,055
    支持:
    2,926
    职业:
    Theatre
    所在地:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Boiler didn't come out frames, so will be restricted to about 5 years.
     
    已获得Johnme101Chris86的支持.
  10. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,739
    支持:
    11,859
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's a new variation on written scheme requirements I've never seen or heard of before.
     
    已获得21BmglJamessquared的支持.
  11. Chris86

    Chris86 Well-Known Member

    注册日期:
    2011-10-31
    帖子:
    1,577
    支持:
    1,786
    职业:
    Safety, technical and vehicle trainer
    所在地:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is the hope that 13065 will be out again to replace her- is there any news on how the boiler is progressing?

    Chris
     
  12. black5

    black5 Well-Known Member

    注册日期:
    2006-04-01
    帖子:
    2,055
    支持:
    2,926
    职业:
    Theatre
    所在地:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,820
    支持:
    64,614
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Even without removing the boiler, a week between hydraulic and "finished" seems impossibly quick: you've got to refit fittings like gauge glasses, safety valves, feed pipework etc, arrange a steam test in that time, then things like reattach all the cladding, fit the cab and so on ... All in a week.

    Tom
     
    已获得green five, Steve, 35B另外1人的支持.
  14. Ivatt2MT

    Ivatt2MT New Member

    注册日期:
    2021-12-30
    帖子:
    16
    支持:
    33
    性别:
    所在地:
    Manchester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Last I heard, all work on that has stalled due to lack of resources. Don't know if it'll pick up again once Wells is finished or not. From what I read, it basically needed a whole new boiler, so it'll be a long/expensive job.

    On another note, I wasn't sure where else to ask this, but does anyone know what became of the planned loan move for L&Y tank 1008 from the NRM? It was reported months ago that it was due to join Wren on display in the transport museum, but it doesn't seem like that's happening at the moment given it remains in place around the turntable in the Great Hall even with all the reshuffling of exhibits there at the moment. I had wondered if maybe the situation at the railway re:Joanne had prompted them to cancel that loan or if another factor has come up in regards to it.
     
  15. torgormaig

    torgormaig Part of the furniture Friend

    注册日期:
    2007-07-17
    帖子:
    4,908
    支持:
    7,668
    Patience, dear boy, patience.......... AFAIK the loan is still on the cards, just give it time;).

    Peter
     
  16. 21B

    21B Part of the furniture

    注册日期:
    2009-09-02
    帖子:
    3,931
    支持:
    8,756
    I am really struggling to figure out how this is compatible with the pressure systems regulations. The access to the foundation ring is good, but…
     
    已获得green fiveSteve的支持.
  17. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,739
    支持:
    11,859
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Like you, I find it unusual. However, the Pressure Systems Regulations are silent on the matter. The only requirement is for there to be a Written Scheme of examinations and that scheme is the owners scheme. It must, however, be approved by the Competent Person (Boiler Inspector) and this appears to be the case. There is guidance on the subject originally produced by HMRI/ORR and now incorporated into the HRA Guidance and this is outside that guidance. Having said that, nothing should be written in tablets of stone and this approach may become an accepted norm. The Competent Person will have done his examinations and made an assessment and he will hopefully be far better informed of the situation than us on Nat Pres.
     
    已获得YorkyLadkeith623326D_M的支持.
  18. 21B

    21B Part of the furniture

    注册日期:
    2009-09-02
    帖子:
    3,931
    支持:
    8,756
    Agreed. I do know of an engine (9F) which got through a similar sort of scheme without the boiler coming out because the access to the foundation ring was so good. I’m not questioning the thing, I’d just like to know more about it, but not from Nat Pres.
     
  19. std tank

    std tank Part of the furniture

    注册日期:
    2005-09-20
    帖子:
    3,932
    支持:
    1,072
    性别:
    职业:
    Retired
    所在地:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have the coupling rods, connecting rods and motion been taken down and checked for fractures and wear?
    Have all the copper pipes been annealed?
    No matter how well a loco has been put together, you will not stop wear and tear.
     
    已获得Sunnieboy的支持.
  20. acorb

    acorb Part of the furniture

    注册日期:
    2007-07-17
    帖子:
    2,956
    支持:
    4,394
    所在地:
    Powys
    Not sure I fully understand the economics of this one, surely it will need another extended period out of traffic in 5 years time for a full boiler lift and strip down? Probably cheaper now, but pushing costs further down the line?
     