If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

East Lancs Railway

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von forty gestartet, 23 Oktober 2016.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    Registriert seit:
    16 April 2009
    Beiträge:
    8.915
    Zustimmungen:
    5.859
    That gives the lie to the excuse that everyone was too busy to inform potential customers that 34072 would not be running.
     
    osprey gefällt dies.
  2. D7076

    D7076 Well-Known Member

    Registriert seit:
    21 Dezember 2007
    Beiträge:
    1.541
    Zustimmungen:
    691
    But if the roster page is updated by office staff using HOPS as the information source then the roster reflected the information they had .
    HOPS still showing 34072 running tomorrow and Thursday ..but it isn’t .
     
  3. Springs Branch

    Springs Branch New Member

    Registriert seit:
    6 März 2016
    Beiträge:
    198
    Zustimmungen:
    260
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    45690 and 48305 announced as guests for the Autumn Steam Gala 13-15 October. 34072 and 34092 also in action.
     
    JBTEvans gefällt dies.
  4. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Registriert seit:
    2 Oktober 2015
    Beiträge:
    7.944
    Zustimmungen:
    6.670
    Geschlecht:
    männlich
    Ort:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is City of Wells not out of ticket and under overhaul or is it finished already?
     
  5. Chris86

    Chris86 Well-Known Member

    Registriert seit:
    31 Oktober 2011
    Beiträge:
    1.577
    Zustimmungen:
    1.786
    Beruf:
    Safety, technical and vehicle trainer
    Ort:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    34092 was supposed to be having a fast- track overhaul, if it’s back in service for October that will have been a very rapid turn around!

    Chris
     
  6. Springs Branch

    Springs Branch New Member

    Registriert seit:
    6 März 2016
    Beiträge:
    198
    Zustimmungen:
    260
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Finished. Just shows of the quality of the previous overhaul and maintenance since. Hydraulic passed last week, needs repaint & its own tender back, which will require another one to be sent north.
     
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    27.809
    Zustimmungen:
    64.523
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hang on - you are saying "hydraulic passed last week" yet also "finished". So a steam test and all the necessary reassembly has taken place in a week?

    Tom
     
  8. osprey

    osprey Resident of Nat Pres

    Registriert seit:
    3 Oktober 2007
    Beiträge:
    10.498
    Zustimmungen:
    2.857
    Beruf:
    semi-retired, currently doing R&D for my patents
    Ort:
    Halifax
    It's...OOOOP North in Lancashire....the land of the "Lancashire Spanner".....
     
  9. black5

    black5 Well-Known Member

    Registriert seit:
    1 April 2006
    Beiträge:
    2.055
    Zustimmungen:
    2.926
    Beruf:
    Theatre
    Ort:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Boiler didn't come out frames, so will be restricted to about 5 years.
     
    Johnme101 und Chris86 gefällt dies.
  10. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.737
    Zustimmungen:
    11.853
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's a new variation on written scheme requirements I've never seen or heard of before.
     
    21B, mgl und Jamessquared gefällt dies.
  11. Chris86

    Chris86 Well-Known Member

    Registriert seit:
    31 Oktober 2011
    Beiträge:
    1.577
    Zustimmungen:
    1.786
    Beruf:
    Safety, technical and vehicle trainer
    Ort:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is the hope that 13065 will be out again to replace her- is there any news on how the boiler is progressing?

    Chris
     
  12. black5

    black5 Well-Known Member

    Registriert seit:
    1 April 2006
    Beiträge:
    2.055
    Zustimmungen:
    2.926
    Beruf:
    Theatre
    Ort:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    27.809
    Zustimmungen:
    64.523
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Even without removing the boiler, a week between hydraulic and "finished" seems impossibly quick: you've got to refit fittings like gauge glasses, safety valves, feed pipework etc, arrange a steam test in that time, then things like reattach all the cladding, fit the cab and so on ... All in a week.

    Tom
     
    green five, Steve, 35B und einer weiteren Person gefällt dies.
  14. Ivatt2MT

    Ivatt2MT New Member

    Registriert seit:
    30 Dezember 2021
    Beiträge:
    16
    Zustimmungen:
    33
    Geschlecht:
    männlich
    Ort:
    Manchester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Last I heard, all work on that has stalled due to lack of resources. Don't know if it'll pick up again once Wells is finished or not. From what I read, it basically needed a whole new boiler, so it'll be a long/expensive job.

    On another note, I wasn't sure where else to ask this, but does anyone know what became of the planned loan move for L&Y tank 1008 from the NRM? It was reported months ago that it was due to join Wren on display in the transport museum, but it doesn't seem like that's happening at the moment given it remains in place around the turntable in the Great Hall even with all the reshuffling of exhibits there at the moment. I had wondered if maybe the situation at the railway re:Joanne had prompted them to cancel that loan or if another factor has come up in regards to it.
     
  15. torgormaig

    torgormaig Part of the furniture Friend

    Registriert seit:
    17 Juli 2007
    Beiträge:
    4.908
    Zustimmungen:
    7.666
    Patience, dear boy, patience.......... AFAIK the loan is still on the cards, just give it time;).

    Peter
     
  16. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    3.909
    Zustimmungen:
    8.717
    I am really struggling to figure out how this is compatible with the pressure systems regulations. The access to the foundation ring is good, but…
     
    green five und Steve gefällt dies.
  17. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.737
    Zustimmungen:
    11.853
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Like you, I find it unusual. However, the Pressure Systems Regulations are silent on the matter. The only requirement is for there to be a Written Scheme of examinations and that scheme is the owners scheme. It must, however, be approved by the Competent Person (Boiler Inspector) and this appears to be the case. There is guidance on the subject originally produced by HMRI/ORR and now incorporated into the HRA Guidance and this is outside that guidance. Having said that, nothing should be written in tablets of stone and this approach may become an accepted norm. The Competent Person will have done his examinations and made an assessment and he will hopefully be far better informed of the situation than us on Nat Pres.
     
    YorkyLad, keith6233 und 26D_M gefällt dies.
  18. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    3.909
    Zustimmungen:
    8.717
    Agreed. I do know of an engine (9F) which got through a similar sort of scheme without the boiler coming out because the access to the foundation ring was so good. I’m not questioning the thing, I’d just like to know more about it, but not from Nat Pres.
     
  19. std tank

    std tank Part of the furniture

    Registriert seit:
    20 September 2005
    Beiträge:
    3.927
    Zustimmungen:
    1.070
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have the coupling rods, connecting rods and motion been taken down and checked for fractures and wear?
    Have all the copper pipes been annealed?
    No matter how well a loco has been put together, you will not stop wear and tear.
     
    Sunnieboy gefällt dies.
  20. acorb

    acorb Part of the furniture

    Registriert seit:
    17 Juli 2007
    Beiträge:
    2.952
    Zustimmungen:
    4.388
    Ort:
    Powys
    Not sure I fully understand the economics of this one, surely it will need another extended period out of traffic in 5 years time for a full boiler lift and strip down? Probably cheaper now, but pushing costs further down the line?
     

Die Seite empfehlen