If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

East Lancs Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة forty, بتاريخ ‏23 اكتوبر 2016.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,992
    عدد المعجبين:
    5,920
    That gives the lie to the excuse that everyone was too busy to inform potential customers that 34072 would not be running.
     
    أعجب بهذه المشاركة osprey
  2. D7076

    D7076 Well-Known Member

    إنضم إلينا في:
    ‏21 ديسمبر 2007
    المشاركات:
    1,560
    عدد المعجبين:
    720
    But if the roster page is updated by office staff using HOPS as the information source then the roster reflected the information they had .
    HOPS still showing 34072 running tomorrow and Thursday ..but it isn’t .
     
  3. Springs Branch

    Springs Branch New Member

    إنضم إلينا في:
    ‏6 مارس 2016
    المشاركات:
    198
    عدد المعجبين:
    260
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    45690 and 48305 announced as guests for the Autumn Steam Gala 13-15 October. 34072 and 34092 also in action.
     
    أعجب بهذه المشاركة JBTEvans
  4. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    8,176
    عدد المعجبين:
    6,852
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is City of Wells not out of ticket and under overhaul or is it finished already?
     
  5. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,613
    عدد المعجبين:
    1,845
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    34092 was supposed to be having a fast- track overhaul, if it’s back in service for October that will have been a very rapid turn around!

    Chris
     
  6. Springs Branch

    Springs Branch New Member

    إنضم إلينا في:
    ‏6 مارس 2016
    المشاركات:
    198
    عدد المعجبين:
    260
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Finished. Just shows of the quality of the previous overhaul and maintenance since. Hydraulic passed last week, needs repaint & its own tender back, which will require another one to be sent north.
     
    John Rawnsley, MattA, Johnme101 و 1 شخص آخر معجبون بهذا.
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,020
    عدد المعجبين:
    65,585
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hang on - you are saying "hydraulic passed last week" yet also "finished". So a steam test and all the necessary reassembly has taken place in a week?

    Tom
     
  8. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,628
    عدد المعجبين:
    2,900
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    It's...OOOOP North in Lancashire....the land of the "Lancashire Spanner".....
     
  9. black5

    black5 Well-Known Member

    إنضم إلينا في:
    ‏1 إبريل 2006
    المشاركات:
    2,066
    عدد المعجبين:
    2,948
    الوظيفة:
    Theatre
    مكان الإقامة:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Boiler didn't come out frames, so will be restricted to about 5 years.
     
    Johnme101 و Chris86 معجبون بهذا.
  10. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's a new variation on written scheme requirements I've never seen or heard of before.
     
    21B, mgl و Jamessquared معجبون بهذا.
  11. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,613
    عدد المعجبين:
    1,845
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is the hope that 13065 will be out again to replace her- is there any news on how the boiler is progressing?

    Chris
     
  12. black5

    black5 Well-Known Member

    إنضم إلينا في:
    ‏1 إبريل 2006
    المشاركات:
    2,066
    عدد المعجبين:
    2,948
    الوظيفة:
    Theatre
    مكان الإقامة:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,020
    عدد المعجبين:
    65,585
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Even without removing the boiler, a week between hydraulic and "finished" seems impossibly quick: you've got to refit fittings like gauge glasses, safety valves, feed pipework etc, arrange a steam test in that time, then things like reattach all the cladding, fit the cab and so on ... All in a week.

    Tom
     
    green five, Steve, 35B و 1 شخص آخر معجبون بهذا.
  14. Ivatt2MT

    Ivatt2MT New Member

    إنضم إلينا في:
    ‏30 ديسمبر 2021
    المشاركات:
    16
    عدد المعجبين:
    33
    الجنس:
    ذكر
    مكان الإقامة:
    Manchester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Last I heard, all work on that has stalled due to lack of resources. Don't know if it'll pick up again once Wells is finished or not. From what I read, it basically needed a whole new boiler, so it'll be a long/expensive job.

    On another note, I wasn't sure where else to ask this, but does anyone know what became of the planned loan move for L&Y tank 1008 from the NRM? It was reported months ago that it was due to join Wren on display in the transport museum, but it doesn't seem like that's happening at the moment given it remains in place around the turntable in the Great Hall even with all the reshuffling of exhibits there at the moment. I had wondered if maybe the situation at the railway re:Joanne had prompted them to cancel that loan or if another factor has come up in regards to it.
     
  15. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,951
    عدد المعجبين:
    7,737
    Patience, dear boy, patience.......... AFAIK the loan is still on the cards, just give it time;).

    Peter
     
  16. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,048
    عدد المعجبين:
    9,148
    I am really struggling to figure out how this is compatible with the pressure systems regulations. The access to the foundation ring is good, but…
     
    green five و Steve معجبون بهذا.
  17. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Like you, I find it unusual. However, the Pressure Systems Regulations are silent on the matter. The only requirement is for there to be a Written Scheme of examinations and that scheme is the owners scheme. It must, however, be approved by the Competent Person (Boiler Inspector) and this appears to be the case. There is guidance on the subject originally produced by HMRI/ORR and now incorporated into the HRA Guidance and this is outside that guidance. Having said that, nothing should be written in tablets of stone and this approach may become an accepted norm. The Competent Person will have done his examinations and made an assessment and he will hopefully be far better informed of the situation than us on Nat Pres.
     
    YorkyLad, keith6233 و 26D_M معجبون بهذا.
  18. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,048
    عدد المعجبين:
    9,148
    Agreed. I do know of an engine (9F) which got through a similar sort of scheme without the boiler coming out because the access to the foundation ring was so good. I’m not questioning the thing, I’d just like to know more about it, but not from Nat Pres.
     
  19. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,941
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have the coupling rods, connecting rods and motion been taken down and checked for fractures and wear?
    Have all the copper pipes been annealed?
    No matter how well a loco has been put together, you will not stop wear and tear.
     
    أعجب بهذه المشاركة Sunnieboy
  20. acorb

    acorb Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    2,999
    عدد المعجبين:
    4,483
    مكان الإقامة:
    Powys
    Not sure I fully understand the economics of this one, surely it will need another extended period out of traffic in 5 years time for a full boiler lift and strip down? Probably cheaper now, but pushing costs further down the line?
     

مشاركة هذه الصفحة