If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. Sam 60103

    Sam 60103 Member

    إنضم إلينا في:
    ‏9 مارس 2019
    المشاركات:
    980
    عدد المعجبين:
    384
    مكان الإقامة:
    Kirkcaldy
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the Mainline: 13/11/21 Cheshireman from Bristol.
    On Heritage Line: 16/01/22 at the Great Central.
     
  2. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    And don't forget they're fitting this new fangled train control system which is taking longer than anticipated.
     
  3. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,259
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    16th January 2022.
     
  4. John Merry

    John Merry New Member

    إنضم إلينا في:
    ‏5 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    130
    مكان الإقامة:
    On tour
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thought all the bottom end work on loco and tender were finished on that?
    Rest to be done when boiler was fitted?
     
  5. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's not a 5 minute job
     
    أعجب بهذه المشاركة osprey
  6. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,561
    عدد المعجبين:
    1,304
    Electrical systems reported as nearly complete 30/09. The refitting of the boiler might hinder the progress of the completion of fitting this system which in itself is a significant undertaking. It is a first and a complicated one at that.
     
    أعجب بهذه المشاركة osprey
  7. John Merry

    John Merry New Member

    إنضم إلينا في:
    ‏5 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    130
    مكان الإقامة:
    On tour
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What isn't a 5 minute job?
     
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Unsubscribing from Amazon Prime? Getting a truthful answer out of Boris Johnson? Retrieving your car from Luton Airport car park?

    Lots of things I guess …

    Tom
     
    Sheff, Haighie, alastair و 21 آخرون معجبون بهذا.
  9. John Merry

    John Merry New Member

    إنضم إلينا في:
    ‏5 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    130
    مكان الإقامة:
    On tour
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Like your humour
     
  10. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,561
    عدد المعجبين:
    1,304
    Please don't mention Luton Airport.

    The recent fire was the best thing that could happen to it. It was regrettable that it was so small.
     
  11. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You must have flown here from Paradise....
     
  12. Eightpot

    Eightpot Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏10 أوت 2006
    المشاركات:
    8,340
    عدد المعجبين:
    2,506
    الجنس:
    ذكر
    الوظيفة:
    Engineer Emeritus
    مكان الإقامة:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have you worked out how many million £s worth of improvement it did?
     
  13. Scrat

    Scrat New Member

    إنضم إلينا في:
    ‏10 ماي 2015
    المشاركات:
    133
    عدد المعجبين:
    106
    الجنس:
    ذكر
    الوظيفة:
    railway worker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And having cost to date twice as much as the loco cost to build, a very expensive system.
     
  14. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    Well I'm showing my age...the last time I passed through Luton airport was in Freddy Laker's days...it seems it hasn't changed...
     
  15. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,493
    عدد المعجبين:
    2,850
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    I'm perplexed, could you give figures please?
     
  16. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Refitting the boiler, completing the electrical work, testing, not to mention all the remaining mechanical work once the boiler is back on.
    Patience.
     
    أعجب بهذه المشاركة osprey
  17. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,561
    عدد المعجبين:
    1,304
    And they are expecting the cylinder block for 2007 ditto the boiler. They are busy.
     
    أعجب بهذه المشاركة ghost
  18. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,589
    عدد المعجبين:
    22,717
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Too true but it's interesting how it's actually not been missed as much as say, when the Duchess was out of action for a while. Ask someone else and it will be a completely different answer, of course.
     
  19. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,538
    عدد المعجبين:
    18,384
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Don’t knock Luton Airport, apart from the ridiculous car parking charges. It’s only half an hour from me and in my experience is the most efficient of the London airports. Luckily I came back on 30th September and had my son to drive us to and from.
     
  20. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,259
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Quite why they initially expected the overhaul to take around 6 months to complete, I don't know. It's been 21 months now and still it's weeks away from testing. Installing ETCS was never going to be a five minute job, and especially not on a different form to traction to everything else that it's been installed on so far.
     
    Sheff, Paul42 و acorb معجبون بهذا.

مشاركة هذه الصفحة