    The actual track laying won't take that long, its the ground preparation that will take the bulk of the time, The section to Salehurst, should be fairly straight forward, the track bed is still as it was left after the track was lifted, Of course drainage will have to be made good and largely brought up to modern standards, communication and signalling cables laid in trenches in the cess. beyond Salehurst, the track bed was removed so a new embankment will have to be made ,and allowed to settle, then of course there is the track bed to the A21, So its entirely possible that there could be track reinstated from Junction Road, to Salehurst, and level crossings in at Junction rd, and Northbridge street, with track laid to just before the A21, then that crossed when the land has settled enough to join up the last section. I don't know if the plan will be to bring in ballast trains, once the link is made, or some ballast to be dropped at Wittersham rd, to ballast as far as Salehurst, and then the final bit a ballast train comes in off NR, to do the final drop.
     
    Biermeister и H Cloutt нравится это.
  2. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The section towards Salehurst has been left to go wild - so the environmental investigation will be more time-consuming that the part where the embankment has been removed. You are right about the drainage.

    There is a large tree in the trackbed immediately to the East of North Bridge Street which I noticed when I walked down there a couple of weeks back. There is a bridge just past this which will need assessing and remedial work.
     
    Last edited: 21 сен 2023
    Biermeister нравится это.
  3. Hirn

    Hirn Member

    Дата регистрации:
    11 авг 2015
    Сообщения:
    512
    Симпатии:
    320
    Пол:
    Мужской
    If you can bring ballast in by the trainload it gets much cheaper. I would think there would be a good case for getting everything done to the top of the bottoming - drainage, ditches and culverts, ducts for cabling, bridges, all earth works - and then laying the rails with enough ballst under the sleepers for the tamper not to disturb deeper before tamping the track up through the ballast as it was brought in by railway. In paricular to reckon to cover any unexpected subsidence with extra ballast rather take extreme care any earth works were compacted well enough to put buildings or points on.
     
  4. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am pretty certain that I read that RVR have the ballast which is stored 'somewhere' Certainly the track is stored at Robertsbridge and Nortiam. I assume members will get more information in the next Pheonix which will be distributed shortly.
     
  5. mikehartuk

    mikehartuk New Member

    Дата регистрации:
    29 июн 2007
    Сообщения:
    107
    Симпатии:
    515
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    20230922_134244.jpg 20230922_134433.jpg 20230922_134543.jpg

    Yesterday the filling of the loco shed site was completed. A job well done by our contractor. Next will be hard surfacing the newly in-filled shed site with recycled crushed concrete.
     
    burnham-t, ragl, Musket The Dog и 9 другим нравится это.
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.591
    Симпатии:
    3.934
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Many thanks for that, Mike. That really is an impressively executed piece of work. Whats with the ramp at the far end- is that for future maintenance access?
    I'm going to start the "estimate the tonnage" sweepstake at 30,000t!
     
    Miff нравится это.
  7. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Mike for the pictures and update.
     
  8. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A further update on the RVR Blog today - click here This consists of aerial footage at RVR East - Austen's Bridge to Bodiam.
     
    CH 19 и weltrol нравится это.
  9. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My Copy of 'The Phoenix' arrived this morning. Much of the news is covered by Mike Hart's posts to this thread. There are lots of other items of interest.
     
  10. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Update on the RVR blog yesterday - see here - There is a video about the environmental mapping which seems to have started in September. Good to see some preparity work being carried out 'on the ground'.
     
  11. Wenlock

    Wenlock Well-Known Member Friend

    Дата регистрации:
    26 окт 2008
    Сообщения:
    2.114
    Симпатии:
    1.368
    Пол:
    Мужской
    Род занятий:
    Bus Driver
    Адрес:
    Loughton Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think parts of the line will have had this done earlier. But the railway did not have access to all of the line until the order was confirmed.
     
    H Cloutt нравится это.
  12. mikehartuk

    mikehartuk New Member

    Дата регистрации:
    29 июн 2007
    Сообщения:
    107
    Симпатии:
    515
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     
    Dead Sheep, H Cloutt и Miff нравится это.
  13. paul1609

    paul1609 New Member

    Дата регистрации:
    9 июн 2006
    Сообщения:
    67
    Симпатии:
    111
    Пол:
    Мужской
    Адрес:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Ballast for the reinstatement of the Northiam to Bodiam section came as a shipload from Cornwall to Rye Harbour where it was stored on the quayside by our friends there.
    It was then moved by road to Northiam by local hauliers in their less busy times. I believe this worked out a lot cheaper than any rail option.
     
    hyboy и Dead Sheep нравится это.
  14. Biermeister

    Biermeister Member

    Дата регистрации:
    4 авг 2019
    Сообщения:
    361
    Симпатии:
    669
    Пол:
    Мужской
    Род занятий:
    Brewer
    Адрес:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting. I wonder whether ballast might come by rail for 'the missing link' now that Network Rail access is available? If so, this would mean starting at the Northbridge Street end rather than the easier to work Austen's Bridge end. I say easier because the embankment must be rebuilt at the western (Northbridge Street) end. Of course, all will be revealed in the fullness of time.
     
    H Cloutt нравится это.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.264
    Симпатии:
    12.516
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ideally work will start from the Junction rd. end, with a temporary single road diversion and lights, around the crossing site, to enable the crossing to go in, then once in, track can be laid to join it up, then track laid to Austin's bridge, and on towards Salehurst, as each section is cleared and prepared, ballast for this section could be brought in by road and stored at Northiam then a final drop and tamp done when the line is finally joined up through out. with ballast and tamper coming in off NR.
     
    H Cloutt нравится это.
  16. Fireline

    Fireline Well-Known Member

    Дата регистрации:
    11 фев 2008
    Сообщения:
    1.301
    Симпатии:
    1.348
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Given the KESR fleet of in house Tampers and Regulators, why would we need one from NR?
     
    H Cloutt, Spitfire и Wenlock нравится это.
  17. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You need to clear the formation first, then lay bottom ballast, probably by use of HGV tippers.
    Repair or renew bridges and other structures.
    Only then can you consider relaying of track, ballasting up then tamping.
    If use is to be made of the KESR machines then if they need to be moved by lowloader expect a commercial charge,at a guess £2k per move.
    Unless they start from the KESR end.
     
    Biermeister, H Cloutt и Wenlock нравится это.
  18. Cuckoo Line

    Cuckoo Line Member

    Дата регистрации:
    29 авг 2020
    Сообщения:
    373
    Симпатии:
    382
    Пол:
    Мужской
    Адрес:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking at what has been achieved to date I would hope that the decision makers have enough commercial understanding to choose the most cost effective solutions which aren't always apparent to others and not always the most obvious ones.
     
    Biermeister, H Cloutt, alastair и 9 другим нравится это.
  19. paul1609

    paul1609 New Member

    Дата регистрации:
    9 июн 2006
    Сообщения:
    67
    Симпатии:
    111
    Пол:
    Мужской
    Адрес:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The K&ESR track machines regularly go on holiday to other heritage railways in the south and new machines often come in for calibration and training before going out on the mainline. We regularly hire in locos and coaches from other railways in the big scheme of things, its not an issue.
     
    Hirn, mdewell, H Cloutt и ещё 1-му нравится это.
  20. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The K&ESR / RVR are blessed with some very experienced and sensible railwaymen (and others) in all disciplines in house and as advisors. It is one of the features that makes being a K&ESR Trustee / Director such a joy.
     