If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Rasprava u 'Steam Traction' pokrenuta od Leander's Shovel, 20. Listopad 2007..

  1. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Pridružen(a):
    31. Kolovoz 2010.
    Poruka:
    5,615
    Lajkova:
    9,418
    Spol:
    Muškarac
    Interesi:
    Asset Engineer (Signalling), MNLPS Treasurer
    Grad:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am the wrong person to be commenting on this, tbh, but I do know it is correct to say that the metal we use today does not have the same makeup as that used in the boilers originally. Our CE can describe this better and I would prefer to defer to him.
     
  2. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,831
    Lajkova:
    22,269
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sounds like you've been having the same conversations regarding boiler plate as we have.
     
    242A1 and S.A.C. Martin like this.
  3. 61624

    61624 Part of the furniture

    Pridružen(a):
    27. Rujan 2006.
    Poruka:
    5,294
    Lajkova:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But what timescales are we talking about, hasn't this been known about for years?
     
  4. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Pridružen(a):
    31. Kolovoz 2010.
    Poruka:
    5,615
    Lajkova:
    9,418
    Spol:
    Muškarac
    Interesi:
    Asset Engineer (Signalling), MNLPS Treasurer
    Grad:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably very similar!

    Yes and no, I think a few changes to the requirements for water treatment in London in particular have caught a few by surprise, ourselves included most likely. As I say, I am not best placed to make comments on it and would prefer to defer.
     
  5. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,589
    Lajkova:
    22,715
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Moderation Comment

    It is no secret that the current overhaul of Tornado has resulted in delays and difficulties. The A1 Steam Trust decides what it wishes to share publicly about that and the official source is at https://www.a1steam.com/tornado/home.

    Unofficial comments or simply rumour without evidence help nobody and there is no place for that kind of comment on a forum that is here to support the heritage movement and share useful information. People who cannot be trusted to do that will find their ability to post freely on NP restricted and action has been taken over the recent clutch of posts.

    On a separate matter, it is known that the chemical treatment of national water supplies has changed over time and that may be impacting on locomotive boiler management. Tornado is not alone in that respect so please start a separate thread if you wish to discuss water treatment and related matters.
     
    Spamcan81, mdewell, 242A1 i 9 ostalih se sviđa ovo.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,911
    Lajkova:
    5,847
    That prompted me to see what they are saying on the news page, which took me to
    https://www.a1steam.com/tornado/news/tornado-details/september-etcs-update
    where I read "The tender electrical systems are now nearly complete. All the locker and gauge lighting is in place and working, and the GPS tracker has been wired up and tested. Only the wiring to the front piston valves, brake strainer and underframe lighting is left to add."

    Tornado, like most steam locos built in the last hundred years, does have piston valves, but not front or back ones, so I am wondering what that sentence refers to.
     
  7. Jimc

    Jimc Part of the furniture

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    4,117
    Lajkova:
    4,821
    Interesi:
    Once computers, now part time writer I suppose.
    Grad:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The sentence appears to be talking about tender systems, so would these pistons be part of the braking arrangements on the tender, and not the piston valves that are part of the valve gear on the locomotive?
     
  8. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,911
    Lajkova:
    5,847
    Presumably yes, but I'd still like to know what they are.
     
  9. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,260
    Lajkova:
    12,514
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Might they be parts of the air braking system, isn't the engine and tender air braked? and operates in air braked mode when not working stock, ?
     
    paullad1984 se sviđa ovo.
  10. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Pridružen(a):
    9. Listopad 2019.
    Poruka:
    1,401
    Lajkova:
    1,772
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could it be poor wording and refer to solenoid valves to operate the brakes from the ETCS kit?
    Pat
     
  11. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,589
    Lajkova:
    22,715
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, I went there as well to see what was being shared to discover nothing of substance for almost a month now. But there is a write up of the Annual Convention on 14th October at:
    https://www.a1steam.com/tornado/news/tornado-details/the-a1-steam-locomotive-trust-annual-convention

    The last line of this talks about the return of Tornado 'to the rails' in the autumn. So at face value all is clear for something to be moving around in the next month unless by 'autumn' they mean winter.
     
  12. huochemi

    huochemi Part of the furniture

    Pridružen(a):
    6. Svibanj 2008.
    Poruka:
    2,995
    Lajkova:
    1,515
    Spol:
    Muškarac
    Grad:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Roger Ford's Third Law? ;)
    Third Law.png
     
    Sheff, Johnb, mdewell i 12 ostalih se sviđa ovo.
  13. 8126

    8126 Member

    Pridružen(a):
    17. Ožujak 2014.
    Poruka:
    830
    Lajkova:
    974
    Spol:
    Muškarac
    I love those. Take out the one instance of the word "railways" and they're broadly applicable across the engineering world.
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,260
    Lajkova:
    12,514
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the most accurate thing that can be said is going to be, " It will be ready, when its ready,
     
    blink bonny se sviđa ovo.
  15. blink bonny

    blink bonny Member

    Pridružen(a):
    26. Srpanj 2012.
    Poruka:
    756
    Lajkova:
    3,603
    Grad:
    northumberland
    I call that the 'Religious Holiday Syndrome'.

    I used to have a regional boss who was a lay preacher, and not at all well versed in engineering.

    He would set deadlines for particular major projects that weren't based on the engineering progress at the time, or what was a reasonable date if we all got our skates on internally, and the people who were totally outside our control, such as local authority planning departments (good luck with that lot) also became unusually productive.

    His deadlines for projects tended to be 'This one had to be ready for the next stage by Easter' or 'That one must be complete by Christmas'. They never were, and rarely could be for a thousand practical reasons, but that was beside the point in his view.
     
  16. clinker

    clinker Member

    Pridružen(a):
    8. Listopad 2016.
    Poruka:
    612
    Lajkova:
    372
    Spol:
    Muškarac
    Grad:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer

    The important point being missed is that there is no mention of which Easter/Christmas, remember that we have one every year.
     
  17. NeilL

    NeilL Well-Known Member

    Pridružen(a):
    30. Ožujak 2012.
    Poruka:
    2,030
    Lajkova:
    1,522
    Interesi:
    Retired & OAPWay & tree feller
    Grad:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Tornado Telegraph, received today, suggests that all is proceeding well and the boiler is back in the frames. A little bit of snagging but apparently to be expected. How does this fit with the rumour mill from a week or so ago
     
    Flying Phil se sviđa ovo.
  18. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    10,492
    Lajkova:
    2,850
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    Indeed...work to be done, still,. ...strange a few days ago on here several were saying otherwise..."boiler doesn't fit"..."Boiler material..welding....measured wrong" et al. Some folk have vivid imaginations. It looks superb BTW.....
     
    242A1, Haighie, Flying Phil i 2 ostalih se sviđa ovo.
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,260
    Lajkova:
    12,514
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can I just say, I'm happy that everything appears to be well, and progressing,
    Someone did suggest to me that there was some internal distortion found, possibly related to cooling and heating cycles, and that may lead to concerns about the material over the longer term, how modern materials differ to the specs they replaced, It seems they may have been mistaken,
     
  20. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    7,914
    Lajkova:
    6,647
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is nothing to do with religion, it is most companies desire to set targets, or often set by people on themselves or bosses just thinking you are taking too long. Religious festivals, just happen to be convenient dates that do not move (Easter accepted never have gotten that one).
    Worst example I experienced, although there were many, was when we were selling off two of our workshops to two different companies along with all the staff. The target became "must have it done by Christmas" (convenient date, most people off for the week after). So in the week before Christmas many late nights & trips to our London lawyers, culminating in a whole day and night for me and two whole days and night for my boss. He was so exhausted at one stage he had to go and sleep on the floor under a table in a conference room (bonkers). I just remember 04:30 in the morning dead beat watching the snow fall and a lamppost outside the window moving in the wind. And also the fact there there were so many others in the legal offices in the small hours doing exactly the same thing.
    Of course we never did "have it signed by Christmas", both were the end of January.
     
    blink bonny se sviđa ovo.

Podijelite ovu stranicu