    With this in mind starting at the Junction Rd end makes sence, there is enough space by the crossing site, to enable road access, even once the crossing is in, I would imagine a temporary road surface could be put on it, to divert traffic around the crossing site whilst the road is dug up and crossing laid, then once the work is finished, that could be used by lorries to lay a ballast bed , up to Austin's bridge, once the clearance gang have cleared the track bed, accessed and repaired the bridge, then work can continue until the next point where there is access to the track bed,
     
    已获得H ClouttBiermeister的支持.
  2. Fireline

    Fireline Well-Known Member

    注册日期:
    2008-02-11
    帖子:
    1,301
    支持:
    1,348
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is no way that Highways would accept a temporary road surface on private land being used to replace the road, even temporarily. The location is such, with the width restrictions, that to divert the road would make it dangerous. Given that the A28 itself was closed for a weekend to renew the crossings at both Rolvenden and Northiam, I see no problem with getting a closure for Junction Road itself. I suspect that the crossing will be done using the same, tram based, system. I believe, though I wouldn't swear to it, that there is a discussion as to whether Austen's bridge can be repaired in situ, or may have to be lifted. I guess we will have to wait and see....
     
    已获得H Cloutt的支持.
  3. Biermeister

    Biermeister Member

    注册日期:
    2019-08-04
    帖子:
    361
    支持:
    669
    性别:
    职业:
    Brewer
    所在地:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder whether the embankment rebuild from Northbridge Street through Parsonage Farm land might be one of the first things to get started as this is probably the biggest civil engineering task of the re-instatement? The excellent work of the contractors in building-up and re-profiling land at the engine shed site would be good practice for this work.

    Any further preparatory work between Junction Road and Austen's Bridge could occur simultaneously as could the level crossing installations at both Junction Road and Northbridge Street. It looks as if the excellent work at the new-ish Northiam level crossing undertaken by K&ESR in conjunction with London Underground and Bakerail engineers will form the basis of the design and installation for these. See: https://www.railengineer.co.uk/revolutionary-level-crossing-on-kent-heritage-railway/

    It's already looking possible to me that the final piece in the jigsaw will be the A21 level crossing.

    I also wonder whether any ballast might be brought in by rail when it becomes possible to do so?

    It is deliciously exciting to imagine how it will all play out, isn't it? Of course, in the real world, Mike Hart will doubtless post to the RVR website as and when there is anything about to happen...
     
    已获得alastair的支持.
  4. Dead Sheep

    Dead Sheep Member

    注册日期:
    2021-03-01
    帖子:
    266
    支持:
    561
    性别:
    所在地:
    Ambridge
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My understanding that engineering principles are going to maintain the Colonel's traditions. The embankment will use fly ash from Drax via Mountfield, loaded onto vintage lorries and transferred along the Battle Road to Robertsbridge. After which, an ancient Manning Wardle, using temporary track panels, will haul dumb-buffered wagons across the fields to the construction site. Timber sleepers will be produced from sawn trees felled along the route. Rails will be of the 30lb variety and secured to the sleepers by spikes. The operation will be supervised by somebody wearing a Derby style bowler hat.
     
    Last edited: 2023-10-25
    已获得hyboy, Bertie Lissie, burnham-t另外15人的支持.
  5. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,000
    支持:
    3,023
    :) :)
     
  6. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The original inspection of the K&ESR noted how cheaply built it was, to a 'just' acceptable standard and noted that it would require constant maintance. Original locomotives aways carried screw jacks to put the loco back on the track when it fell off as it ambled along.

    We try to do a little better these days.
     
    已获得burnham-t, H Cloutt, Hampshire Unit另外5人的支持.
  7. johnofwessex

    johnofwessex Resident of Nat Pres

    注册日期:
    2015-04-06
    帖子:
    9,748
    支持:
    7,858
    性别:
    职业:
    Thorn in my managers side
    所在地:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How much work has had to be done on the K&ESR Infrastructure since preservation?
     
    已获得H Cloutt的支持.
  8. ianh

    ianh Member

    注册日期:
    2006-05-10
    帖子:
    335
    支持:
    194
    职业:
    Farmer -
    所在地:
    Brecon In Wettest Wales
    Could the Manning Wardle not just shuttle a few PFA wagons between Mountfield GBRF and Robertsbridge engineers siding...
     
    已获得H Cloutt的支持.
  9. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,000
    支持:
    3,023
    Loads, including complete replacement of several bridges & embankments and strengthening or stabilising others. And lots of track replacement. That’s one reason why after the railway reopened to Rolvenden in ‘74 restoration had to be in several stages with Bodiam not reached until 2000.

    Col. Stephens no-doubt did the best he could with the available budgets but did not build things to last. I imagine the original business-model aimed to carry out upgrades funded by profits. The original company certainly did some of that in the early years but profitability did not last.
     
    已获得BiermeisterH Cloutt的支持.
  10. Penrhynfan

    Penrhynfan New Member

    注册日期:
    2013-10-03
    帖子:
    116
    支持:
    96
    性别:
    In the early days i.e. 50 (?) years ago, I remember a volunteer of the time, Alec Flett, telling me about the many bridges which had to be replaced to get further than Rolvenden.
     
    已获得BiermeisterH Cloutt的支持.
  11. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,729
    支持:
    11,847
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Locos carrying a pair of traversing jacks was pretty common in Victorian times, both on the big railway and in industry so the KESR was not unique. Contractors locos were usually provided with them although I think they were an option.
     
    已获得H Cloutt的支持.
  12. RLinkinS

    RLinkinS Member

    注册日期:
    2008-11-08
    帖子:
    982
    支持:
    972
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hydraulic jacks?
     
    已获得Copper-capped, H Cloutt, ghost另外1人的支持.
  13. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure they HAD hydraulic jacks in 1900.
     
    已获得H Cloutt的支持.
  14. RLinkinS

    RLinkinS Member

    注册日期:
    2008-11-08
    帖子:
    982
    支持:
    972
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I meant that the "doing a little better" meant providing hydraulic jacks nowadays
     
  15. marshall5

    marshall5 Part of the furniture

    注册日期:
    2010-10-26
    帖子:
    2,521
    支持:
    4,359
    所在地:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apparently they go back to at least 1851.
    Ray.
     
    已获得H ClouttRLinkinSRobin Moira White的支持.
  16. burnham-t

    burnham-t New Member

    注册日期:
    2008-02-26
    帖子:
    104
    支持:
    86
    性别:
    所在地:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The original Rother Valley Railway track, with light FB rail spiked to half-round sleepers, had to be replaced with second-hand SECR bullhead track in about 1904-5 by William Rigby, the contractor for the Headcorn extension.
     
    已获得MuzTrem, Wenlock, Miff另外2人的支持.
  17. weltrol

    weltrol Part of the furniture Friend

    注册日期:
    2008-12-29
    帖子:
    2,842
    支持:
    687
    Mr Stephenson utilised them when building the Britannia bridge at Menai... 1846
     
    已获得RLinkinS的支持.
  18. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,347
    支持:
    4,078
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When I was on the KESR PWay way back I was on Newmill bridge one day, and the water level in the channel was particularly low. I fished out several ancient two bolt chairs, and I guess they were part of that first relay. I eventually gave them to the museum at Tenterden.
     
    已获得Biermeister, Miff, Mark Thompson另外1人的支持.
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,788
    支持:
    64,444
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    (Deleted - can’t get YouTube to work!)
     
    已获得Mark Thompson的支持.
  20. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,591
    支持:
    3,934
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Worked fine for me, but hopefully, a trailer is what it is. Mike has quite a story to tell, and there are chapters still to be written, yet.
     