Bridge that Gap: Great Central Railway News

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Gav106, 8 май 2010.

  1. Jamie C. Steel

    Jamie C. Steel Member

    Дата регистрации:
    3 янв 2006
    Сообщения:
    903
    Симпатии:
    103
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A higher standard, I'm not party to the details but it involved ultrasonic axle testing of each vehicle involved that didn't usually run at the higher speed and an increased frequency of examination. Along with various restrictions upon the line, eg Quorn and Swithland signalbox switched out of circuit as it is signalled for 60mph not 75mph, and no member of staff lineside with access to the railway through gates chained and padlocked.
     
    acorb и Matt37401 нравится это.
  2. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.552
    Симпатии:
    11.961
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cheers Jamie.
     
  3. sycamore

    sycamore Member

    Дата регистрации:
    17 авг 2009
    Сообщения:
    597
    Симпатии:
    238
    Пол:
    Мужской
    Род занятий:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    Адрес:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is there any news on the A60 bridge progress does anybody know? Not seen an update since the bridge lift.

    TIA
    Will
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.045
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The new bridge went in on time, but I don't think any ballast or track has been put on it yet. I would think there is a waterproof membrane and some covering though.
     
  5. jasa76

    jasa76 New Member

    Дата регистрации:
    11 май 2016
    Сообщения:
    96
    Симпатии:
    24
    Пол:
    Мужской
    Адрес:
    Nottingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thats what I was told as well at the weekend when having a tour of the shed. On the canal bridge they have put a covering of ballast, but its not up to the level of the surrounding ground as there's a distinct lip. I imagine that they will wait until all the work is done, so that it the track and ballast can be laid all the way through to make sure that its all aligned.
     
  6. Mark_108

    Mark_108 New Member

    Дата регистрации:
    10 мар 2015
    Сообщения:
    42
    Симпатии:
    19
    Пол:
    Мужской
    Род занятий:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is already ballast north and south of the A60 bridge so it would be more of a 'fill in' job, to the heights already in place, for where the running line off the chord and beyond is/was. The non running line had the ballast removed years ago to reduce the load on the bridge structure.

    I suspect its more to do with EMRT not having anyone currently who does anything on that part of the line (as GCR have not taken it on, and they took it off GCRN) so would need contractors and somebody else to organise it.

    It makes sense to put something down as the water proofing may well by sensitive to UV, a layer of ballast is pretty effective at protecting such things
     
    Last edited: 20 июн 2023
    Chris86 и J Rob't Harrison нравится это.
  7. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.045
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is believed that the planning permission has been applied for for the "Factory Fly-over" section and the fund raising has nearly reached the £2M mark....according to talk during the Q W & W weekend on the FoGCRML stand. So hopefully there will be an official update soon.
     
    Hando, Johnme101, CH 19 и 2 другим нравится это.
  8. Mark_108

    Mark_108 New Member

    Дата регистрации:
    10 мар 2015
    Сообщения:
    42
    Симпатии:
    19
    Пол:
    Мужской
    Род занятий:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing showing on the Charnwood planning portal
     
  9. brmp201

    brmp201 Member

    Дата регистрации:
    18 май 2010
    Сообщения:
    618
    Симпатии:
    966
    Пол:
    Мужской
    Род занятий:
    IT Director
    Адрес:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hando, Johnme101 и The Dainton Banker нравится это.
  10. J Rob't Harrison

    J Rob't Harrison Member

    Дата регистрации:
    6 ноя 2016
    Сообщения:
    242
    Симпатии:
    371
    Пол:
    Мужской
    Адрес:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A memorandum of understanding between Loughborough and Ruddington is good news indeed. It makes me a bit more minded to restart my direct debit...
     
    GOEdwards, Flying Phil и brmp201 нравится это.
  11. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.045
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is also a new 12 page leaflet about the project. This can be viewed via the GCR website in the Reunification August update.
     
    Hando, brmp201 и J Rob't Harrison нравится это.
  12. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.045
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was a meeting of a new joint committee (GCR plus GCR(N) plus others) to help the planning and implementation of Reunification according to the latest GCR Video update.
    It also implied that more paperwork/plans need to be finalised before it (Factory Flyover) can to go to the Planning dept.
     
  13. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.045
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The latest GM Update video has the news that the track is to be relayed over the A60 bridge this month. So a little bit more progress.
     
    bristolian, AndyY, The Dainton Banker и 6 другим нравится это.
  14. bristolian

    bristolian Member

    Дата регистрации:
    25 июл 2005
    Сообщения:
    537
    Симпатии:
    302
    Пол:
    Мужской
    Адрес:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do you have a link to the video, please?.
     
    Andrew MI нравится это.
  15. J Rob't Harrison

    J Rob't Harrison Member

    Дата регистрации:
    6 ноя 2016
    Сообщения:
    242
    Симпатии:
    371
    Пол:
    Мужской
    Адрес:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An interesting update in the latest copy of Mainline. I'm very pleased to be reading about the establishment of a dedicated project board (it's beyond me why it's taken so long to recognise that such a body is a Good Thing to Have with a project like this). I'm considering whether the project has been turned around enough to warrant my re-starting my direct debit in support.
    The really interesting bit though is that "it transpires doubling to Leicester North isn't just nice to do but very important when the line is 18 miles long". Now there's something I'd definitely be minded to contribute toward.
     
    Gareth, CoalFiredGeek и acorb нравится это.
  16. WesternRegionHampshireman

    WesternRegionHampshireman Well-Known Member

    Дата регистрации:
    25 сен 2021
    Сообщения:
    1.188
    Симпатии:
    222
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So when both sites are joined together, it's going to be 18 miles long?
     
    Last edited by a moderator: 14 дек 2023
  17. Andrew MI

    Andrew MI New Member

    Дата регистрации:
    5 янв 2022
    Сообщения:
    23
    Симпатии:
    19
    Адрес:
    Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably the reason why doubling to Leicester North is very important is an operational reason? I am very much not familiar with that, but can anyone shed any light on or unpack this please?
     
  18. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    29.199
    Симпатии:
    29.639
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm also curious about this, especially when north of Loughborough is predominantly single track.
     
    MuzTrem нравится это.
  19. Gav106

    Gav106 Well-Known Member

    Дата регистрации:
    29 мар 2010
    Сообщения:
    1.772
    Симпатии:
    2.171
    Адрес:
    Nantwich, Cheshire
    If that museum gets built one day then surely you would want to maximise the traffic able to get to it?
     
  20. Belgarath001

    Belgarath001 New Member

    Дата регистрации:
    2 апр 2012
    Сообщения:
    153
    Симпатии:
    384
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes.

    Elsewhere in Mainline, it mentions "one of the tasks currently being undertaken is understanding future timetables to help inform what infrastructure might be needed to ensure there is the right level of flexibility and avoidance of pinch points. Early work suggests that very quickly the single track between Rothley and Leicester North becomes a considerable timetable constraint." I don't know how this ties in to @35B's point about north of Loughborough, and the presumably even bigger constraint of the 10 mile single track with loops. But I'm confident it's being looked at, and if it's early days still, there may be no point in mentioning anything whilst the study continues.

    Also worth mentioning from Mainline I think, given previous concerns, is the news of the drafting of a Memorandum of Understanding between GCR PLC and GCR(N), setting out how the two organisations work towards aligning processes, systems and ways of working explicitly with the intent of being able to operate as one railway.
     
    Flying Phil, MuzTrem, J Rob't Harrison и 4 другим нравится это.