If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

The Gwili Railway thread

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od Matt78, 28. Siječanj 2012..

  1. acorb

    acorb Part of the furniture

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    2,950
    Lajkova:
    4,380
    Grad:
    Powys
    Managed to squeeze in a visit on the 30th, as per @Matt78 post it was very damp indeed...however, the train was warm and the lights sparkled! Hope the wet weather hasn't left any lasting damage, seemed to be a bit of concern with water crossing the track just outside of Abergwili and the river was er... Wild!
    Huge, positive changes in just 12 months, the facilities at Abergwili are already a game changer in terms of accessibility and the shed will make life so much easier for those who maintain the stock in this Aquatic climate. Best wishes for 2024!
    IMG_20231230_143415.jpg IMG_20231230_152641.jpg IMG_20231230_163918.jpg
     
  2. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    The platform wall continues to progress at Abergwili. The Dan Do shed is having electrical fit-out at the moment.

    meanwhile the CK carriage has now moved into the shed at Cranmore for work to the ends and roof. At Bronwydd the BSK is also undergoing refurbishment with new seats for Easter.

    On the loco front the class 03 is nearing the end of a refurbishment and should leave the shed shortly with final painting to follow.

    on the steam front we have “Moorbarrow” available and will have a further announcement about a visiting loco for 2024 shortly. Haulwen is also in the works although no firm date for return to steam yet.

    regards

    Matt
     

    Privici:

  3. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    D2178’s overhaul is now mechanically complete.
    Still a fair bit of cosmetic attention required but getting there!

    the focus will now switch to reassembly of Haulwen.

    regards

    Matt
     

    Privici:

  4. thb17

    thb17 Member

    Pridružen(a):
    7. Veljača 2012.
    Poruka:
    289
    Lajkova:
    267
    Spol:
    Muškarac
    Interesi:
    National Key account manager
    Grad:
    Ely
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking good! Now Nellie, olwyn and Welsh guardsman gone, I think the 03 is the flag bearer of the home fleet! It's been a fantastic engine, and will be good to have haulwen back to join it... hopefully this year?. How is the new platform progressing Matt?

    Cheers Tom
     
  5. alexl102

    alexl102 Member Friend

    Pridružen(a):
    1. Ožujak 2019.
    Poruka:
    630
    Lajkova:
    471
    Spol:
    Muškarac
    Grad:
    Leeds
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What about Moorbarrow - does that not count? Or does it not have the same history?
     
  6. 87J

    87J New Member

    Pridružen(a):
    4. Srpanj 2008.
    Poruka:
    11
    Lajkova:
    39
     
  7. 87J

    87J New Member

    Pridružen(a):
    4. Srpanj 2008.
    Poruka:
    11
    Lajkova:
    39
    The new platform, platform 1, the UP platform, is progressing well. AJ_infrastructure_2024.01.26_03_up platform construction_JJ_305_6338.jpg
     
    Stinch, Bluenosejohn, ghost i 6 ostalih se sviđa ovo.
  8. thb17

    thb17 Member

    Pridružen(a):
    7. Veljača 2012.
    Poruka:
    289
    Lajkova:
    267
    Spol:
    Muškarac
    Interesi:
    National Key account manager
    Grad:
    Ely
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Although a lovely loco... the 03 has seen 2 extensions and for a long time was the only working diesel on the line. So much great service. Moorbarrow is relatively recent and I believe on a hire agreement.

    Cheers,
    Tom
     
    pevans945@btinternet.com se sviđa ovo.
  9. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,912
    Lajkova:
    5,848
    Does the ORR not frown on new platforms on curves?
     
  10. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    yes the platform is on a curve, but it will have a number of enhanced safety features including tactile paving, appropriate height and length for the trains, a proper surface, better lighting and closer proximity of staff and better crowd control/CCTV. Yes the gap risk has to be managed as it does on every platform .

    regards

    Matt
     
  11. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Non-preferred but it would depend on practicality. They don’t like level crossings, either but it hasn’t stopped the RVR. . All subject to the inevitable risk assessment.
     
    Last edited: 30. Siječanj 2024.
  12. thb17

    thb17 Member

    Pridružen(a):
    7. Veljača 2012.
    Poruka:
    289
    Lajkova:
    267
    Spol:
    Muškarac
    Interesi:
    National Key account manager
    Grad:
    Ely
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Also I don't think the picture gives a really accurate depiction. In reality the curve is subtle as can be seen on Google maps satellite images.

    Cheers,
    Tom
     
  13. gwilialan

    gwilialan Well-Known Member

    Pridružen(a):
    8. Prosinac 2012.
    Poruka:
    1,706
    Lajkova:
    3,988
    Spol:
    Muškarac
    Grad:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is the best example of the platform curve that I can find in my records. It's taken from what is now the track bed, looking south from the north end of the existing platform which ends just past the pipe bridge that can be seen in the distance. So yes, visibility is going to be an issue, even for 3 coach trains. I would think that whenever the platform is busy a dispatcher would be needed halfway between the guard and loco for safety's sake.

    Is that really 10 years ago? I can still remember the freezing rain and gales blowing snow horizontally while we were tracklaying with a gang of only 3 plus the road-railer! Lovely Welsh weather :).
     

    Privici:

    Bluenosejohn se sviđa ovo.
  14. 87J

    87J New Member

    Pridružen(a):
    4. Srpanj 2008.
    Poruka:
    11
    Lajkova:
    39
    Yes, the telephoto lens does distort the image somewhat. The curve is more subtle, to quote Tom, than it looks in the photo.
     
    thb17 and Matt78 like this.
  15. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    The platform progresses.
     

    Privici:

  16. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    An overall view of the site. Note that the bank is being removed so our passengers will enjoy an unhindered view of the new platform (up side) when they arrive.

    the cafe (in the two taff vale carriages) will also open this year and in the distance the Dan Do shed nears completion.
     

    Privici:

  17. thb17

    thb17 Member

    Pridružen(a):
    7. Veljača 2012.
    Poruka:
    289
    Lajkova:
    267
    Spol:
    Muškarac
    Interesi:
    National Key account manager
    Grad:
    Ely
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It looks great!
     
    pevans945@btinternet.com se sviđa ovo.
  18. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
  19. gwilialan

    gwilialan Well-Known Member

    Pridružen(a):
    8. Prosinac 2012.
    Poruka:
    1,706
    Lajkova:
    3,988
    Spol:
    Muškarac
    Grad:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  20. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    Latest on the platform, the wall and concrete base now complete. Next stage is to build the base for the copers.

    Also two panels of track have been renewed at Bronwydd Arms with a further three panels now dug out ready for concretes. There are pretty much the last wood panels in the main line apart from the river bridge and turnouts.
     

    Privici:

    brmp201, Johnme101, echap i 3 ostalih se sviđa ovo.

Podijelite ovu stranicu