If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Steam speed records including City of Truro and Mallard

Тема в разделе 'Steam Traction', создана пользователем Courier, 30 янв 2011.

  1. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.858
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Crockery?
     
    Cartman нравится это.
  2. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The train hit the reverse curves going into the platforms at, I think, 57 mph (limit 20 mph). There was a lot of lemming-like jumps from high shelves by the dining car fittings.
     
    Cartman нравится это.
  3. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    495
    Симпатии:
    289
    It is never necessary to lift a boiler just for boiler tube replacement. A boiler may require lifting for inspection or work for its 10-year overhaul (always so for a boiler that sits between the frames) and the boiler will always require tube replacement at this point. I say always, but some of the NRM locos at Bold Colliery (for Rainhill 150th) had the same boiler tubes that they were withdrawn with in the early sixties! No doubt a few sample tubes had been replaced but.... Of course the NRM don't (didn't?) have to worry about insurance, being government owned. For the same reason, if you see a Hurricane or Spitfire over London, you know it's owned by the RAF. No one else can afford the insurance!
     
  4. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.117
    Симпатии:
    4.821
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seems to be a fair bit of speculation going on, quelle surprise! AIUI the German locomotives were only really being used for testing and experiments at the time, they weren't being used on day to day traffic, so its unsurprising that it would be unused between the high speed run and the exhibition run, and one would positively expect that it would be thoroughly checked and fettled in between, especially as they only had the two of them.
     
    Hirn, MellishR, Chris86 и ещё 1-му нравится это.
  5. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely agree Jim.
     
  6. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    28.729
    Симпатии:
    28.654
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is certainly consistent with the talk given as part of the Mallard 75 event here in Grantham 10 years ago. One of the Berlin railway museum curators* spoke very interestingly on the subject, but I've no recollection from that of the run being mechanically compromised or particularly fettled.

    * - Unfortunately, I can't find the programme for the weekend, and online searches haven't helped. I do recall Robert Gwynne talking about high speed rail more generally, including reference to the relationship between containers, APT and Pacers...
     
  7. Hermod

    Hermod Well-Known Member

    Дата регистрации:
    6 май 2017
    Сообщения:
    1.109
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to Gottwaldt who cite the Betriebsbuch 05002 it was doing 3382km during 7 days in steam and was cold but fit for work 24 days in may 1936.
     
  8. Eightpot

    Eightpot Resident of Nat Pres Friend

    Дата регистрации:
    10 авг 2006
    Сообщения:
    8.340
    Симпатии:
    2.506
    Пол:
    Мужской
    Род занятий:
    Engineer Emeritus
    Адрес:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Don't forget 05 003 which had special boiler with a combustion chamber to run on pulverised coal. The loco chassis was turned round relative to the tender with the cab now at the front. Quite why they bothered I don't know, but in early 1945 it was rebuilt to be very similar to its two sisters but both bogies were of the inside framed type. AFAIK it didn't do any useful work that year.
     
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.439
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Given the condition of Germany, I don't suppose there was much work for a high speed loco in 1945 (and probably rather more pressing issues than sorting out an experimental non-standard loco to boot). Just a suggestion ...

    Tom
     
    Spinner, 35B, johnofwessex и 2 другим нравится это.
  10. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.117
    Симпатии:
    4.821
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But, according to the less than trustworthy Wikipedia, not yet in existence in 1936?
     
  11. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have now had confirmation from the DB Museum that the original dynamometer rolls for the German speed record holder 05 002 do not exist in preservation.

    The closest we have is the interpretative graphs given on page 64 of the book Baureihe 05 - Schnellste Dampflok der Welt.

    This has changed my views now and I think places the 05 locomotive back behind Mallard, particularly when given further context by the article that the DB Museum have offered to me, reporting on the day of the run.

    We're now getting towards a tiering system for high speed record runs I think!
     
    Fred Kerr нравится это.
  12. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    Дата регистрации:
    24 мар 2006
    Сообщения:
    8.383
    Симпатии:
    5.368
    Пол:
    Мужской
    Род занятий:
    Freelance photo - journalist
    Адрес:
    Southport
    IIRC the Class 05 was designed specifically for high speed trials and not for normal service. This compares with Mallard which was designed for, and used on, normal services.
     
  13. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.858
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Certainly The Germans seem to have built a number of different short production run high speed loco's but in terms of numbers nothing approaching the A4's
     
  14. Luke McMahon

    Luke McMahon Member

    Дата регистрации:
    12 мар 2016
    Сообщения:
    278
    Симпатии:
    59
    Пол:
    Мужской
    Адрес:
    Macclesfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    3440 city of truro when it spent a while on the east lancs at bury certainly seemed like it could be rather nippy.

    Although during winter I don't think the crews would want to as it's an open cab. It only had a tarpaulin attached between the cab & the tender for some protection but still the crew were getting rather cosy huddled round the firebox door to keep warm:D:p

    Sadly I'm highly doubtful it's a loco we'll ever get to see work again as did hear it's got a leaking boiler barrel & I can't see the NRM being willing to shell out the cash for the repairs :confused::(:(
     
  15. Jon Lever

    Jon Lever New Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    54
    Симпатии:
    142
    Пол:
    Мужской
    Род занятий:
    Bookseller
    Адрес:
    West Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All things considered I think I doubt that, but if we allow that that might be the case, what is the historiographical justification and purpose?
     
  16. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.585
    Симпатии:
    22.715
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Coming back to Mallard for a moment...Because there are those in my family who understand the 'sadness' of my railway interest I was given a puzzle book over Christmas that is under the NRM banner. Apart from some occasionally demanding teasers such as the station name that is an anagram of 'plant bears' I came across a short description of the 1936 run. The salient section talked about the dynamometer car registering 125 mph for a quarter of a mile that was enough for it to claim the speed record from the German 05 002. The speed of 126 was described as 'momentary' and so it came to pass that this number ended up on the side of the loco.

    That actually accords with what I have always thought was the story over this record attempt and I have to say that after looking back at the overly forensic analysis of the run in this thread, whilst it was interesting, it really did take up quite a lot of time.

    Nothing critical intended at all; just a footnote really.
     
    The Green Howards нравится это.
  17. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The recognition of limits in primary evidence and the issues with secondary sources.
     
    Jon Lever нравится это.
  18. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So to give an example of my current thinking:

    Authenticated Speed Record
    • Vehicle has speedometer and print out exists for analysis
    • Dynamometer car reading is available for analysis
    • Secondary sources have strong basis in primary evidence
    Partially Authenticated Speed Record
    • Original records not available
    • Secondary sources have sufficient data and strong basis in primary evidence to ascertain mathematical possibility of occurrence
    • Timekeeping records where other data points or sufficient corroborating evidence exists
    Unauthenticated Speed Record
    • All timekeeping records without corroborating evidence (e.g. similar runs and findings)
    "Nonsense"
    • 130mph PRR T1
    • 130mph Saint
     
    Miff нравится это.
  19. 30567

    30567 Part of the furniture Friend

    Дата регистрации:
    7 авг 2012
    Сообщения:
    6.124
    Симпатии:
    4.088
    So, in the classification of the various contributors here, I class you as an unrepentant empiricist Simon.

    In all the categories I think there needs to be a theory filter. That is what rules out Rocket doing 80 or a Saint 130. There must be theoretical evidence that the combination of power output, gradient, train weight, drag factor, following wind...... is capable of delivering a speed of x. In other words, you need a model and it needs calibration.

    Then I also think that this thread has taught us much about the measurement limitations, accuracy, error bands etc and the need to use the language of probabilities.

    I think the most powerful results involve a combination of modelling, observation and interpretation.
     
    Last edited: 6 фев 2024
    MellishR, Romsey и S.A.C. Martin нравится это.
  20. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I will take that as a compliment!

    I do like your "theory filter" idea.

    I absolutely agree with you, and it's something I am trying to do in the PhD, albeit at a slow pace currently. The question is how you build the model, what is it based on, and actually I am working on a proposal for the University of Southampton Wind Tunnel team, towards some physical modelling. Watch this space...
     

Поделиться этой страницей