If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

35028 Clan Line

Rasprava u 'Steam Traction' pokrenuta od Big Al, 2. Ožujak 2016..

  1. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A bit of publicity in the Telegraph

    IMG_0417.jpeg
     
  2. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,734
    Lajkova:
    11,852
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is that building siphons in situ?
     
  3. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, it’s the first time it’s been done with the boiler in the frames but I think 92 Squadron has had something similar done. You can see all the stages of what’s happened to date on the Clan Line website under the news section.

    https://www.clan-line.org.uk/category/news/
     
  4. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,836
    Lajkova:
    22,279
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, we’ve had new sections welded into the syphons along with associated plate work and stays without removing 34081’s boiler. It was a tight squeeze in places and involved a fair bit of head scratching but we did it.
     
  5. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I find it heartening that despite being a bit of a pain they are replaced rather than sealed over, as its been stated they 'dont contribute much to steaming' They are to my mind a useful feature in many ways...
     
  6. Cuckoo Line

    Cuckoo Line Member

    Pridružen(a):
    29. Kolovoz 2020.
    Poruka:
    373
    Lajkova:
    382
    Spol:
    Muškarac
    Grad:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Also worth looking at Leaky Finders Facebook pages for pictures and infp

    Sent from my SM-A526B using Tapatalk
     
  7. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don’t think you can bodge a repair like this, I wouldn’t want to be on the footplate if a syphons failed.
     
    green five se sviđa ovo.
  8. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bodging ? at some point a decision to repair the firebox and the siphons was made and a method of doing it agreed.
    Its possible and indeed simpler to repair/replace the parts of the firebox with the syphons closed off and/or removed entirely depending on the state of the those parts.... it maybe that such an alteration would however need additional scrutiny and approvals whereas just repair/ replace as is does not.
     
  9. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m not an engineer but it’s the syphons that hold up the brick arch. If you knew the engineers and those who make the decisions in MNLPS you would know that everything is done properly. Anything done on a boiler needs scrutiny and approval by the boiler inspector.
    Having said that one MN boiler was produced without syphons but I don't know how the firebox differed from the standard boiler
     
    Last edited: 20. Veljača 2024.
    Hampshire Unit se sviđa ovo.
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,804
    Lajkova:
    64,501
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Their primary purpose wasn't to contribute to steaming; it was to improve water circulation (with the spin-off benefit of keeping a flow of water over the crown if water level got low).

    I don't see how you can "close off" or remove the syphons without a fairly fundamental redesign of the firebox. If you remove them, that changes the structural integrity of the firebox and in particular the crown, which therefore needs redesigning. And if you close them off (by which I assume you mean isolate them at both ends from the water space) then how do you stop them melting in the heat of the fire with no water flowing through them? By contrast, the moment you have water flowing through them, they are subject to full boiler pressure so are part of the pressure vessel.

    The replacement firebox for Sir Archibald Sinclair (which was one of a batch for six different Light Pacifics) has brand new thermic syphons in place, and I assume that all the subsequent ones in the batch either have or will have them.

    Tom
     
    Hampshire Unit, Steve i Johnb se sviđa ovo.
  11. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Tom.
    By closing off i meant just patch the holes where they used to be, but i doubt this would be acceptable . Really a new firebox crown and throatplate would be needed ( throatplates tend not to last too long anyway) as would additional stays. Find it hard to believe that a satisfactory solution without big holes in it could n't be found on the grounds of structural integrity. As stated i am glad the effort is being put in to keep them, and whilst its still only a pipe dream at the moment omission of one from the new V4 boiler was to my mind disappointing.
     
  12. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it's a matter of not taking away from the original design.
     
  13. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,734
    Lajkova:
    11,852
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's a steel box so it would be a fairly easy job to remove the syphons and let in new pieces of plate where required. However, they would have to be stayed and that might be a problem, especially with the crown plate. The stay spacing of the rest of the box may not allow this. I don't know as I'd need a detail drawing to come to any sort of conclusion.
    Personally, I wouldn't do away with them.
     
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,804
    Lajkova:
    64,501
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, that was my thought - not impossible, but you are adding new design and probably certification issues.

    Ultimately, the syphons are a steel fabrication welded in place and braced with stays, like the rest of the firebox. There's no particular constructional challenge I can see that is fundamentally more difficult or different than those already involved in overhauling the firebox of a Bulleid pacific - just more of it. So even contemplating removing them seems to introduce more, and different, difficulties than it removes.

    Tom
     
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,594
    Lajkova:
    22,727
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
  16. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,266
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Its good to see 28 with a fire in her again
     
  17. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,542
    Lajkova:
    18,404
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is, still a hell of a lot of work to do when it gets back to the Lane. The lads at Leaky’s have really worked hard to get it to this stage
     
  18. brennan

    brennan Member

    Pridružen(a):
    11. Rujan 2016.
    Poruka:
    410
    Lajkova:
    455
    Grad:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The buzz is that it's leaving Leaky's next week and heading back to the Lane.
     
  19. Swan Age

    Swan Age Member

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    953
    Lajkova:
    275
    Spol:
    Muškarac
    Grad:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'll have to keep a lookout for SA Smith Low loader passing through Pinhoe next week then. Thanks for the heads up.
     
  20. YoungRailwayMan

    YoungRailwayMan Member

    Pridružen(a):
    28. Rujan 2011.
    Poruka:
    327
    Lajkova:
    15
    Spol:
    Muškarac
    Interesi:
    Unemployed
    Grad:
    Devon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi does anyone have any more info on when 35028 leaves leaky finders, i went pass today and when i was there a medium sized white flatbed lorry with a grabber / crane on the back which arrived,
    I tried to take a couple of photos but nearly got confronted by the driver so i drove away.
    Then after a hour or two later i passed by again without stopping and the lorry had a jcb digger machine on the back of it.
     

Podijelite ovu stranicu