Nene Valley Railway

Discuție în 'Heritage Railways & Centres in the UK' creată de Luke McMahon, 19 Apr 2016.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.911
    Aprecieri primite:
    5.847
    “Tornado's overhaul, combined with the fitting of ETCS, is rapidly approaching completion …"

    Don't they mean slowly, at long last?
     
  2. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.303
    Aprecieri primite:
    5.727
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How many mainline locos have you overhauled or project managed?
    Did they include the fitment of a completely new, bespoke electronic system?
    I think we can cut them some slack. 2 years is still a pretty quick overhaul time.
     
    Bluenosejohn, Johnme101 și Spamcan81 apreciază asta.
  3. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.731
    Aprecieri primite:
    28.657
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is. But when compared with the claims at the start, it is significantly slower.


    Sent from my iPad using Tapatalk
     
    MellishR apreciază asta.
  4. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.831
    Aprecieri primite:
    22.269
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Most people who criticise progress on an overhaul have never been involved in one. The old "it will be ready when it's ready" adage still holds true.
     
    ghost apreciază asta.
  5. Johnb

    Johnb Nat Pres stalwart

    Înscris:
    3 Dec 2014
    Mesaje:
    15.537
    Aprecieri primite:
    18.383
    Sex:
    Masculin
    Ocupație:
    Retired, best job I've ever had
    Locație:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Unfortunately the A1 Trust don,t work like that, the loco has been promised on railtours and to heritage lines over a considerable time all of which have had to be postponed, some more than once. I think they need to ge their house in order
     
    Last edited: 4 Mar 2024
    MellishR apreciază asta.
  6. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.831
    Aprecieri primite:
    22.269
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing new there then, as that happens with all sorts of different locos. All booked and promised long before they’re out of the workshop. The A1 trust is no different in that case. How many galas has the Grange been appearing at for its first public workings?
     
  7. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.729
    Aprecieri primite:
    11.847
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Overhauling a steam loco these days is fraught with problems and setbacks. Wasn't Clan Line advertised for tours back in 2022 and back in service in short order after its problems were found yet here we are in 2024 with still no operational loco. Fortunately, most people understand these things.
     
    Johnme101 și Spamcan81 apreciază asta.
  8. Johnb

    Johnb Nat Pres stalwart

    Înscris:
    3 Dec 2014
    Mesaje:
    15.537
    Aprecieri primite:
    18.383
    Sex:
    Masculin
    Ocupație:
    Retired, best job I've ever had
    Locație:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I do understand it, there was a change of with Clan Line when other faults were found and the decision was made to go for a full overhaul rather than just replace the syphons. It just seems to me that the Tornado overhaul has been mismanaged along the way somewhere.
     
    Ben Jenden apreciază asta.
  9. Vulcan Works

    Vulcan Works Member

    Înscris:
    12 Apr 2018
    Mesaje:
    266
    Aprecieri primite:
    745
    Sex:
    Masculin
    Locație:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Tornado project team will probably be delighted with that constructive criticism of their abilities
     
    Bluenosejohn apreciază asta.
  10. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.831
    Aprecieri primite:
    22.269
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are so many factors outwith the loco owner’s control that can affect progress, I’m loathe to criticise any overrun.
     
    Johnme101 și ghost apreciază asta.
  11. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    Înscris:
    14 Sep 2009
    Mesaje:
    1.180
    Aprecieri primite:
    1.812
    Sex:
    Masculin
    Locație:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A well run organisation would look back over the reasons that have led to the overhaul being delayed and drawn out, identify with hindsight what factors were within their control and need to be managed better next time, what factors were outside of their control, and whether in future they could do anything to mitigate to any degree against those factors they don't fully have control of. Realistically only the A1SLT can do that, a load of outsiders who have not been completely privvy to the details of the whole overhaul cannot completely accurately assess the situation. Hopefully the A1SLT will, with hindsight, be able to reflect on the last two years and make any adjustments and changes necessary to reduce the chances of such delays occurring again in the future
     
    green five, Johnme101, desperado și alți 3 apreciază asta.
  12. Johnb

    Johnb Nat Pres stalwart

    Înscris:
    3 Dec 2014
    Mesaje:
    15.537
    Aprecieri primite:
    18.383
    Sex:
    Masculin
    Ocupație:
    Retired, best job I've ever had
    Locație:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m by no means alone among Trust members to think we are not being told everything. I don’t know if the email newsletter Tornado Telegraph is still produced but I’ve not had one or any other communication, apart from asking for funds, for months.
     
  13. acorb

    acorb Part of the furniture

    Înscris:
    17 Iul 2007
    Mesaje:
    2.950
    Aprecieri primite:
    4.379
    Locație:
    Powys
    John, Issue 154 arrived in my inbox on Friday, there was another earlier in the year. Suggest you check your spam or re-register if you are really interested, but then you were advised to do this on Tornado thread back in December when you were complaining about lack of communication! You also stated that you no longer donated to Tornado 'as there were more worthy causes', perhaps you fell off their mailing list then?

    Whilst I accept communication hasn't been to the previous standard, there has been significant changes to personnel as we are all aware and it isn't as bad as you are making out if you are not receiving emails. Whether they are guilty of over optimism is another story, but they are not the first loco group to be charged with that.

    There is great discussion regards this on the Tornado thread, so will not replicate anymore on here.
     
    Last edited: 3 Mar 2024
  14. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.862
    Aprecieri primite:
    9.257
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  15. Johnb

    Johnb Nat Pres stalwart

    Înscris:
    3 Dec 2014
    Mesaje:
    15.537
    Aprecieri primite:
    18.383
    Sex:
    Masculin
    Ocupație:
    Retired, best job I've ever had
    Locație:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I did email them, I got the current copy emailed back but nothing since
     
  16. 21B

    21B Part of the furniture

    Înscris:
    2 Sep 2009
    Mesaje:
    3.889
    Aprecieri primite:
    8.633
    A factor in overhauls getting delayed is that this is a cottage industry. Small numbers of people with key skills. A life event for one person can hold up half a dozen overhauls quicker than you can click your fingers. Finding people materials and parts takes an unpredictable amount of time. Suppliers being typically small (the biggest UK loco workshops employ fewer than 20 people I think ) means very little ability to give firm leadtimes.
     
    Johnme101, 5944, John Petley și alți 3 apreciază asta.
  17. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.729
    Aprecieri primite:
    11.847
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s a point that many don’t realise. A simple example is piston rings. I’m not saying that this is the case but Tornado requires six. If one of these is broken during installation a replacement is required. The A1 trust are unlikely to keep spares on the shelf so a replacement is required. I’ve just been quoted 16 weeks delivery from a supplier and there aren’t many of those. It’s a small item but acts as an example of how things can easily go wrong. You can make your own but even that isn’t a two minute job.
     
    Last edited: 6 Mar 2024
    Bluenosejohn, 35B și Spamcan81 apreciază asta.
  18. 21B

    21B Part of the furniture

    Înscris:
    2 Sep 2009
    Mesaje:
    3.889
    Aprecieri primite:
    8.633
    Indeed. If you’re unlucky and the cast iron pot in the size you want has run out, and the foundry is stacked out (which is likely as there aren’t so many of those) then the wait might be even longer.
     
  19. chrishallam

    chrishallam Well-Known Member

    Înscris:
    25 Mar 2007
    Mesaje:
    1.039
    Aprecieri primite:
    377
    Locație:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Johnme101, ykin01, big.stu și alți 3 apreciază asta.
  20. chrishallam

    chrishallam Well-Known Member

    Înscris:
    25 Mar 2007
    Mesaje:
    1.039
    Aprecieri primite:
    377
    Locație:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The pump trolley experiences have sold well so far, so we've had to add a number of extra dates throughout the first half of the year!

    ITV Anglia News visited yesterday and it should feature on their 6pm bulletin tonight.
     
    big.stu apreciază asta.