GWR 28XX MHR

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة 73129, بتاريخ ‏4 ماي 2009.

  1. John Petley

    John Petley Part of the furniture

    إنضم إلينا في:
    ‏8 اكتوبر 2007
    المشاركات:
    2,958
    عدد المعجبين:
    2,548
    الجنس:
    ذكر
    الوظيفة:
    Researcher/writer and composer of classical music
    مكان الإقامة:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting - there will be plenty of Southern Steam at Eastleigh over the Bank Holiday weekend, but on the Southern preserved lines, it looks like a bumper crop of GWR engines will be in action - 6695 will be presumably holding the fort with 80078 at Swanage, 9017 is rostered at the Bluebell, 7715 should be in action at the Spa Valley and now we have 5224 on the Mid Hants. Perhaps the K&ESR will join the party by rostering pannier 1638!
     
  2. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please don't break it, it is needed on the NYMR this summer!
     
  3. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,821
    عدد المعجبين:
    12,020
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's already been proof tested on the NYMR so you shouldn't be able to do it too much damage. A good strong loco but it does drink the water. Not recommended for wine 'n' dine trains, either, if you have a soup course!
     
  4. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,752
    عدد المعجبين:
    1,129
    مكان الإقامة:
    Oxford
    Not a gentle starter then? Five coach trains on our 1-in-60 grades will seem like a holiday compared to the NYMR.

    I wonder how long she'll stay? A month? IIRC, several of the regular locos have inspections, wash-outs, maintenance, etc. planned for the next few weeks, and 73096 has left a gap in the roster. Having come all that way, she might as well get some mileage in.
     
  5. locker

    locker New Member

    إنضم إلينا في:
    ‏12 ماي 2009
    المشاركات:
    16
    عدد المعجبين:
    0
    yes it is 5224 and it will be at the mhr mon 18th may
     
  6. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,821
    عدد المعجبين:
    12,020
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing to do with the starting, more to do with the fore and aft motion imparted into the coaches when it's working.
     
  7. richards

    richards Part of the furniture

    إنضم إلينا في:
    ‏1 اكتوبر 2008
    المشاركات:
    4,714
    عدد المعجبين:
    2,099
    الجنس:
    ذكر
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "Fore and aft" from a Great Western engine - surely not.

    Sounds just like a big industrial to me. You can't call yourself a proper railway waiter or buffet steward until you can serve soup or coffee with an 0-4-0 Barclay on the front. :smt048

    Richard
     
  8. 73096

    73096 Member

    إنضم إلينا في:
    ‏19 سبتمبر 2007
    المشاركات:
    504
    عدد المعجبين:
    0
    مكان الإقامة:
    Salisbury
    RUMOURS are till 92212 is ready
     
  9. 34007

    34007 Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2007
    المشاركات:
    3,166
    عدد المعجبين:
    2
    الجنس:
    ذكر
    مكان الإقامة:
    Hampshire
    Surely 92212 can't be that far off? Everything seems to be going back together now?
     
  10. ady

    ady Well-Known Member

    إنضم إلينا في:
    ‏4 جويلية 2006
    المشاركات:
    2,375
    عدد المعجبين:
    285
    الجنس:
    ذكر
    الوظيفة:
    Post office
    مكان الإقامة:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't think the 9F will be ready until September.
     
  11. locker

    locker New Member

    إنضم إلينا في:
    ‏12 ماي 2009
    المشاركات:
    16
    عدد المعجبين:
    0
    its due to stay 4 about 3 months !!1 \:D/
     
  12. 73096

    73096 Member

    إنضم إلينا في:
    ‏19 سبتمبر 2007
    المشاركات:
    504
    عدد المعجبين:
    0
    مكان الإقامة:
    Salisbury
    It'll be ready when its ready END OF
     
  13. cct man

    cct man Part of the furniture

    إنضم إلينا في:
    ‏15 يناير 2007
    المشاركات:
    3,220
    عدد المعجبين:
    49
    الوظيفة:
    CONSTRUCTION
    مكان الإقامة:
    LONDON
    Calm down Darren please, he was only giving an opinion of which we are all entitled.

    He was not being nasty in any way so what gives you the right to come back with a remark like that?.

    Just asking.

    Regards
    Chris
     
  14. SpudUk

    SpudUk Well-Known Member

    إنضم إلينا في:
    ‏5 فبراير 2009
    المشاركات:
    1,736
    عدد المعجبين:
    597
    الجنس:
    ذكر
    الوظيفة:
    Project Manager
    مكان الإقامة:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  15. 34007

    34007 Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2007
    المشاركات:
    3,166
    عدد المعجبين:
    2
    الجنس:
    ذكر
    مكان الإقامة:
    Hampshire
    The 9F which has been due to return to traffic; which has been said is the latter part of this year - But with other locos and priorities this isnt always the case. I'm down there in June (12th I think) in the shed and I will have a close look then. But does she need need new cladding or is some of what she had going to be fitted/salvaged?
     
  16. 73096

    73096 Member

    إنضم إلينا في:
    ‏19 سبتمبر 2007
    المشاركات:
    504
    عدد المعجبين:
    0
    مكان الإقامة:
    Salisbury
    Bittern is the reason why!
    Everyone saying it'll be ready this month, no this month etc... Targets arent met and the railway looks bad, therefore the 9F will be ready when its ready.
    Locos are very complicated pieces of kit and a minor snag can set a project back a long time. I'm not needing to calm down as my post wasn't in that nature. If you're going to pick up on any points I make, at least make sure they're valid in future. People thinking are exactly that!
     
  17. cct man

    cct man Part of the furniture

    إنضم إلينا في:
    ‏15 يناير 2007
    المشاركات:
    3,220
    عدد المعجبين:
    49
    الوظيفة:
    CONSTRUCTION
    مكان الإقامة:
    LONDON
    Bittern is the reason why!
    Everyone saying it'll be ready this month, no this month etc... Targets arent met and the railway looks bad, therefore the 9F will be ready when its ready.
    Locos are very complicated pieces of kit and a minor snag can set a project back a long time. I'm not needing to calm down as my post wasn't in that nature. If you're going to pick up on any points I make, at least make sure they're valid in future. People thinking are exactly that![/quot


    But thats their opinion Darren, everyone is entitled to one. Just because it is different from yours you cone over all agressive to others. You would not like and neither do other people.

    You are a good lad but please try and think before you post.

    Regards
    Chris
     
  18. 34007

    34007 Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2007
    المشاركات:
    3,166
    عدد المعجبين:
    2
    الجنس:
    ذكر
    مكان الإقامة:
    Hampshire
    Bittern is the reason why!
    Everyone saying it'll be ready this month, no this month etc... Targets arent met and the railway looks bad, therefore the 9F will be ready when its ready.
    Locos are very complicated pieces of kit and a minor snag can set a project back a long time. I'm not needing to calm down as my post wasn't in that nature. If you're going to pick up on any points I make, at least make sure they're valid in future. People thinking are exactly that![/quot


    But thats their opinion Darren, everyone is entitled to one. Just because it is different from yours you cone over all agressive to others. You would not like and neither do other people.

    You are a good lad but please try and think before you post.

    Regards
    Chris[/quote:3tedy6lh]

    I can see Darren's point and it is a valid point - 92212 will be ready when she is ready. I don't see any aggresiveness about - Just fact. But she is due to be finished the latter part of this year. The boiler work etc has certainly been extensive... But the MHR team always turn out a first class loco!!

    Cheers

    Andy
     
  19. domeyhead

    domeyhead Member

    إنضم إلينا في:
    ‏16 ماي 2007
    المشاركات:
    404
    عدد المعجبين:
    175
    I agree with Chris. Every complex or long running project needs a plan and a plan has an estimated completion date. If a plan subsequently slips the reasons and the impact will certainly be clear to those involved. Yes it is true that it is nobody's business outside the MHR loco and boiler department what the reasons are behind but it is definitely in the MHR's interests to be open and informative when it happens, and it should be the duty of all the departments to be informative and provide good PR to those who are in truth their friends. Defensive statements just create an impression of evasiveness and all that goes with it.
    If there was any tetchiness around previous plans such as Bittern's restoration then perhaps part of the problem was not keeping interested parties fully informed, leading to false expectations of completion dates. "It's ready when it's ready" suggests a lack of project planning - which I know for a fact to be untrue and unfair on MHR's project managers.
     
  20. LN850

    LN850 Member

    إنضم إلينا في:
    ‏25 يناير 2009
    المشاركات:
    559
    عدد المعجبين:
    1
    does anyone know on any progress on the boiler of 31806 at chatham?

    the locos frames are done and i dont expect sitting around is doing them any good. If the boiler isn't back by now then the chances of it returning to service this year are very slim.

    The boiler overhaul seems to be taking a very long time seeing as it was expected to be back around christmas 2007. (check MHN 133 or 132 cant remeber which). If they ar hoping to get 5 years out of it before JB takes it away then they dont look as though they are going to get it.

    It looks like the loco shortage at MHR is likely to continue. Why was 34007 hired in in 2007 when they already had nearly 5 locos in service whereas in 2008 and now in 2009 there are barely enough locos to cover service requirements.

    Swanage keep more locos in service and their loco requirements are much much less.....
     