Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    إنضم إلينا في:
    ‏1 اكتوبر 2023
    المشاركات:
    183
    عدد المعجبين:
    153
    الجنس:
    ذكر
    مكان الإقامة:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is only Bunker-James still involved with the Trust (no longer a Trustee) who was involved with the original boiler order with Meiningen and David Elliott was mostly excluded from subsequent boiler orders from Meiningen which were lead by Bunker-James and Davies.
     
  2. agalpin

    agalpin Member

    إنضم إلينا في:
    ‏22 إبريل 2006
    المشاركات:
    306
    عدد المعجبين:
    20
    مكان الإقامة:
    Bleeding 'ell Essex
    Is this one of the reasons why the loco has its fire built up differently to other engines too?
     
  3. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,599
    عدد المعجبين:
    22,731
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I must admit that I had forgotten that about steel instead of copper. So presumably there was some compelling evidence back in the noughties that told the Trust this variation from the original design specification was advantageous. By evidence I mean a longevity time line of locomotives working successfully with that configuration. Riddles went for a copper firebox with the Britannias that were the most recent locomotive design even though I gather he was influenced by LMS design and of course Bulleids that had welded steel fireboxes. But steel on a Bulleid over the WW2 years was more to do with the times and the need to keep weight manageable. (All very complicated!)

    So I'm still a bit bemused as to why there has been so much of an issue with the boiler. I probably need to read back up-thread.
     
  4. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,599
    عدد المعجبين:
    22,731
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So steel instead of copper because of cost. Fair enough. But steel behaves differently from copper and the manufacturer comments accordingly with suggested modifications that were not followed through.

    Tricky one.
     
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,807
    عدد المعجبين:
    64,519
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’ve always been of the view that there is an element of “you pays your money and you takes your choice” here. Steel fireboxes are typically considerably cheaper than copper (especially in materials) but also considerably less long lasting. So you get a cheap steel firebox but you essentially might have to replace it entirely every ten years, or a more expensive (in initial cost) copper box that is more forgiving of renewal via repair. Not to say one is right and one is wrong, just different cost models at work.

    As you say, perhaps the issue is going for the steel box but then looking to repair rather than replace?

    Tom
     
    أعجب بهذه المشاركة Hirn
  6. clinker

    clinker Member

    إنضم إلينا في:
    ‏8 اكتوبر 2016
    المشاركات:
    612
    عدد المعجبين:
    372
    الجنس:
    ذكر
    مكان الإقامة:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I know that I don't often agree with Eightpot, but AIUI this is pretty much what happened, I was told that the A1SLT had to establish their own CE for the design thus relieving Meiningham of the responsibility.

    class8mikado is quite correct as in European practice things like replacing broken stays is regarded as routine maintenance requiring no specialist processes, whereas British practice involves jumping through hoops, paperwork and further (unnecessary) expense. Sadly even pre Brexit Britain had far to many vested interests to fully engage with the E.U.

    Regarding a complete new build British built copper boxed boiler, would this be permitted now? What is the situation regarding New riveted boilers? I know that in My boiler making days We would re-use part of the pressure vessel in order to qualify as a rebuild, thus reducing the expensive paperwork at the expense of heavier but cheaper manual labour. WRT new riveted structures Medway Queen with it's new riveted hull is subjected to so many restrictions as to make it effectively impractical.
     
    Last edited by a moderator: ‏20 جوان 2024
    أعجب بهذه المشاركة Hirn
  7. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    82045's boiler is a traditional British type well on its way to completion at Bridgnorth.
     
    Bluenosejohn, Johnme101, MattA و 3 آخرون معجبون بهذا.
  8. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,308
    عدد المعجبين:
    5,745
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Likewise 105 at Whitehead
     
  9. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,735
    عدد المعجبين:
    11,853
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My understanding is that there was a desire to maintain the grate area of the original. Added to that, there was a difference in how welded stays were done between UK and German practice. In the UK the stays are a close fit in the hole and welded using J prep. In Germany the stays are a loose fit and fillet welded. The latter results in an effectively longer and thus more flexible stay. The former approach was adopted as it complies with BS.2790 and compliance with the latter would make type approval much easier.
    as to why steel and not copper, would guess a combination of cost and the fact that Meininghen had little experience of copper would be factors.
    Happy to be corrected on all the above but that’s my understanding.
     
    Sheff, ragl, LMS2968 و 2 آخرون معجبون بهذا.
  10. agalpin

    agalpin Member

    إنضم إلينا في:
    ‏22 إبريل 2006
    المشاركات:
    306
    عدد المعجبين:
    20
    مكان الإقامة:
    Bleeding 'ell Essex
    Thanks for putting into words my understanding of the method of welding. Too much of a layman to explain it like that.
     
  11. acorb

    acorb Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    2,952
    عدد المعجبين:
    4,388
    مكان الإقامة:
    Powys
    Boston Lodge have turned out several in recent years and are currently designing a new one for the Darjeeling locomotive.
    It may take up a bit of space than usual but I suspect they would be more than happy to have a go at one for an A1 or P2..
     
  12. dan.lank

    dan.lank Member

    إنضم إلينا في:
    ‏30 أوت 2009
    المشاركات:
    412
    عدد المعجبين:
    312
    الجنس:
    ذكر
    مكان الإقامة:
    Haywards Heath
    I know it’s not been used yet, but the Patriot boiler is basically finished isn’t it? Hopefully not facing some of the challenges the chassis did


    Sent from my iPhone using Tapatalk
     
  13. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,062
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably the wrong thread ?
     
  14. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think Tornado has actually run along the GCR yet but I believe it is very close to steaming.
     
  15. dan.lank

    dan.lank Member

    إنضم إلينا في:
    ‏30 أوت 2009
    المشاركات:
    412
    عدد المعجبين:
    312
    الجنس:
    ذكر
    مكان الإقامة:
    Haywards Heath
    Sorry, I was just carrying on the discussion about new boilers built in Britain recently…


    Sent from my iPhone using Tapatalk
     
  16. clinker

    clinker Member

    إنضم إلينا في:
    ‏8 اكتوبر 2016
    المشاركات:
    612
    عدد المعجبين:
    372
    الجنس:
    ذكر
    مكان الإقامة:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are the boilers for 82045, 105, the Patriot and the FFestiniog ones brand new all rivetted boilers? As welded boilers have been in use (in Britain) for well over 70 years can they not be described as 'Traditional'? It is very easy to inform laymen Who may not be actively involved of one thing when their mind tells them that You said something different, thus leading to confusion. I'm not one to take umbrage, But on this occasion I will point out that @Steve 's recent post is saying precisely what I posted lord knows how many pages back, and My post was largely ignored, despite the number of boilers that I have been involved in the rebuilding of.
     
  17. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    إنضم إلينا في:
    ‏1 اكتوبر 2023
    المشاركات:
    183
    عدد المعجبين:
    153
    الجنس:
    ذكر
    مكان الإقامة:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s been very close to steaming for 2 years!
     
  18. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,149
    عدد المعجبين:
    9,777
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    the boilers for 82045 and 5551 appear to be copper firebox rivetted boilers
     
  19. Eightpot

    Eightpot Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏10 أوت 2006
    المشاركات:
    8,340
    عدد المعجبين:
    2,506
    الجنس:
    ذكر
    الوظيفة:
    Engineer Emeritus
    مكان الإقامة:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Been mulling this subject over the last day or two. It seems it was not the best of decisions to disregard Meiningen's advice on increasing the the water spacing between the inner firebox and the outer firebox wrapper, thus permitting longer stays and reducing to risk of stay bolt breakage. By increasing the distance between the two (and making the stays longer) by (say)1-1/2", plus allowing for the thinner (10 mm ?) steel firebox compared with a copper one (3/4"?) this would have reduced the grate are by a little over 4 square feet to around 46 sq. ft., which is still more than a Gresley "Pacific" grate area of 41-1/4 sq. ft.

    That said, when my CME friend and myself went to that special open day at Darlington soon after the boiler was delivered, there were a number of aspects of it that were' to us, a cause for concern.

    1) The welded join between the tapered barrel and the outer firebox wrapper at around the 10 to 11 o'clock position when viewed from the smokebox end, the two surfaces were not lined up properly prior to welding.

    2) The transverse firebox stays above the crown sheet had no more than a glorified washer welded to the outer wrapper with the stay rod emerging at something like a 45 degree angle. This meant the tp permit this the hole in the washer would have to be much oversize to achieve this angle and much weld filler material applied to seal up the gap.

    Meiningen it seems were unaware that during WW2 some Class 52 'Kriegsloks' had boilers that were welded, but instead af flat washers a drop-forged steel tapered stamping was welded onto the outer wrapper so that the stay rod emerged much closer to 90 degrees. I've got a drawing of this but am having difficulty in putting it on here at the moment.

    3) Can't say that we were very keen on the idea of the copper oval sealing rings for the boiler wash-out doors. What happens when given time there is corrosion on the sealing face between the copper and its mating steel face or the external stud nut being over tensioned?

    As my friend said at the time - "I'll give that boiler 10 years." I don't think he was far out.
     
    Last edited: ‏20 جوان 2024
    Sheff و Lezzloco معجبون بهذا.
  20. Eightpot

    Eightpot Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏10 أوت 2006
    المشاركات:
    8,340
    عدد المعجبين:
    2,506
    الجنس:
    ذكر
    الوظيفة:
    Engineer Emeritus
    مكان الإقامة:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Success! This is from the Paper No. 467 - 'A General Survey of the German Locomotive Industry during the War Years 1939-45' that appeared in the Institution of Locomotive Engineers Journal, No.198, July-August 1947.


    Scan 36.jpg
     
    Sheff و Lezzloco معجبون بهذا.