If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Overhead DC electrification - a potential solution to the conundrum of EMUs?

الموضوع في 'Diesel & Electric Traction' بواسطة eldomtom2, بتاريخ ‏21 أوت 2023.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,081
    عدد المعجبين:
    5,983
    If preserved EMUs are to run on any heritage line, other than being hauled by steam or diesel locos, batteries would seem altogether more practical than OLE. Given the low speeds and shortish distances, the energy requirement for a single run would not be great. A decision would be needed between batteries large enough for a full day's operation, with overnight charging, or small batteries and allowing time for charging between runs.
     
  2. Steve B

    Steve B Well-Known Member

    إنضم إلينا في:
    ‏20 جوان 2008
    المشاركات:
    2,181
    عدد المعجبين:
    1,599
    مكان الإقامة:
    Shropshire
    Like what GWR are doing with some 40 year old District line EMU's on the Greenford line...
     
  3. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,081
    عدد المعجبين:
    5,983
    That is a practical trial on a short lowish-speed line. Its success (subject to possible teething troubles) or failure will certainly help to inform possible application of batteries elsewhere. The trial installation of batteries on a Hitachi 800-series train is a rather different kettle of fish.
     
  4. Steve B

    Steve B Well-Known Member

    إنضم إلينا في:
    ‏20 جوان 2008
    المشاركات:
    2,181
    عدد المعجبين:
    1,599
    مكان الإقامة:
    Shropshire
    The Greenford trial is as much about the fast charging technology as the usefulness of batteries in this sort of application. As such there may be useful lessons and technology that could be applied to heritage line situations. Not cheap, but doable.
     
  5. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,270
    عدد المعجبين:
    8,824
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder how many kilojoules of energy would be needed to run, say, a 4-EPB loaded to 30% over a return trip of twenty miles?
     
  6. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    617
    عدد المعجبين:
    304
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am surprised no mention has been made of the E4 loco at North Tyneside's Stephenson Steam Railway. I understand it is fully operational and powered by a wagon full of batteries close coupled. Not a long line but has a reasonable hill to negotiate.
     
    bingleybong, Chris86 و paullad1984 معجبون بهذا.
  7. Allegheny

    Allegheny Member

    إنضم إلينا في:
    ‏8 ماي 2015
    المشاركات:
    637
    عدد المعجبين:
    311
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You could have 3 or 4 wagons, one in use and the rest on charge and keep swapping them over.
     
    أعجب بهذه المشاركة Hirn

مشاركة هذه الصفحة