    There is the project to recreate a LNWR George V 4-4-0, which appears to be proceeding but very slowly.
    There was also a project to recreate a D16 Claud Hamilton 4-4-0, but that looks as if it may have died (web-site disappeared, facebook page last update 2019).
     
    aron33 și andrewshimmin apreciază asta.
  2. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    344
    Aprecieri primite:
    1.272
    Some personal observations on New Builds. It's reassuring to see so many of the current projects heading successfully to completion.
    We may have seen the peak in New Build projects for the foreseeable future for several reasons.
    1. The industrial decline of the Nation has resulted in a large decline in our manufacturing base, with several major suppliers to New Build projects no longer in business.
    2. Our unfortunate industrial decline also means that the number of skilled people has also declined dramatically, resulting in a declining number of volunteer workers available to New Build projects.
    3. The number of us who remember the days of steam is unfortunately declining daily. The result of this is that financial support has increasingly to be found from new sources.
    4. The current political climate against the use of 'fossil fuels' simply makes steam New Builds even more challenging and difficult.
    5. Correct material specifications are becoming increasingly difficult to obtain.
    Everything changes, but in the short term efficient New Builds must be the way to go. Lets all hope that the climate eventually changes so that future generations can enjoy the sight, sound and smell of another generation of New Builds.
     
    Last edited: 12 Iul 2024
  3. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.303
    Aprecieri primite:
    5.727
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    NCC mogul
     
    andrewshimmin, hyboy, Bluenosejohn și alți 2 apreciază asta.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.911
    Aprecieri primite:
    5.847
    I would adjust your last sentence slightly: Neither approach is right or wrong. Tornado is a new member of the A1 class for good and sufficient reason. Beachy Head is a recreation, also for good and sufficient reason.
     
    Hirn și The Green Howards apreciază asta.
  5. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do we know how that is going by the way?
     
    hyboy apreciază asta.
  6. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.303
    Aprecieri primite:
    5.727
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very well.
    Frames erected, cylinders cast, wheels refurbished, motion brackets cast machined and fitted, most motion parts refurbished or manufactured, lots of smaller parts made/cast, boiler well advanced, GNRI tender being considered for rebuilding to NCC design. still a lot to do, but well on the way.
     
  7. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The US lot building a Pennsylvania Duplex are motoring on - their website says they are 43% complete. Which is an awful lot of engine
     
    ragl apreciază asta.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    43% in weight (which is what they claim) is not necessarily the same as 43% by cost, time or complexity of course!

    Tom
     
    Sheff, The Green Howards și Gav106 apreciază asta.
  9. Hirn

    Hirn Member

    Înscris:
    11 Aug 2015
    Mesaje:
    512
    Aprecieri primite:
    320
    Sex:
    Masculin
    Could I ask?

    The original Ivatt GNR Atlantics had balanced slide valves with a very direct exhaust: essentially straight through the middle of the slide valve from the steam passages to a carefully curved pipe through 90 degrees up to the bottom of the blast pipe.
    Did the first batch of the Atlantics for the LBSCR have them too?
    The second batch , H2 with superheaters did not apparently have them. (The drawing is in the NRM library & they seem to have been a good design, doing no harm to the performance of the two Marsh 4-6-2 tank locomotives which had them as well as the superheated Atlantics.)

    Balanced slide valves were fitted in quite number of the larger American locomotives in the USA I suppose from about 1890 to when superheating swept in but were barely known here. So I wonder wether Kitsons had reservations about making them or if they were never never asked for when they tendered.
     
    Last edited: 13 Sep 2024
  10. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    a fair bit of that weight is probably the tender, which is an original PRR (though not from a T1) ‘Coast to Coast’ one.
     
  11. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.862
    Aprecieri primite:
    9.257
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's also the boiler (though I think it's a shell at present), driving wheels and parts of the frames. Lots of big, heavy components, but it's all the little ones that cost time and money to produce.
     
  12. D1002

    D1002 Resident of Nat Pres

    Înscris:
    25 Apr 2011
    Mesaje:
    9.847
    Aprecieri primite:
    7.547
    Sex:
    Masculin
    Locație:
    Enfield
    Further progress on the cladding:

    IMG_1516.jpeg
     
  13. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Good to see the progress on 1014.
     
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More Beachy Head action - doing the shunting to assemble a heavier test train. Not my video.



    @TheModster has some video (on the Bluebell thread) of the assembled train out on the line.

    Tom
     
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  16. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.318
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So 14 significant projects with three recent completions - Saint, Atlantic and Grange.
     
    Bikermike apreciază asta.
  17. Hicks19862

    Hicks19862 Member

    Înscris:
    6 Oct 2015
    Mesaje:
    828
    Aprecieri primite:
    749
    Sex:
    Masculin
    Locație:
    Manchester
    Is the V4 still going ahead? I thought it had been shelved (along with the V3 and K3)
     
  18. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.102
    Aprecieri primite:
    8.632
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, they own a set of driving wheels for it along with other parts that came from someone else's attempt to re-create a V4. That's probably slightly more than the Doncaster P2 team have (the other, seemingly forgotten New Build project).
     
    Hicks19862 apreciază asta.
  19. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are either "in build"? Clearly they have cut new metal for both, but is it doing other than gathering dust?
     
  20. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.303
    Aprecieri primite:
    5.727
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They only have the tyres - not the wheel centres.
     