If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

本贴由 nine elms fan2012-11-04 发布. 版块名称: Heritage Railways & Centres in the UK

  1. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,024
    支持:
    1,498
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There are more pictures in the blog of the repairs to Austens Bridge. Who ever did the 'damage' made a real mess.
     
    已获得MiffMark Thompson的支持.
  2. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,347
    支持:
    4,078
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It seems to me that given the destruction of the floor and gas axing of the main beams that destruction of the bridge was the intention.
    I wonder when in the time line this was done?
     
  3. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,024
    支持:
    1,498
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The blog says June 2023 which is after the announcement of the TWAO announcement in early May 2023 but before it was 'made' in August 2023.
     
  4. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,347
    支持:
    4,078
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This one was just two 'I' beams on two crumbly concrete abutments. And pushed out of alignment ! :eek:

    img404.jpg
    Sorry about the poor picture quality. It was taken with one of those tiny Kodak 110 cameras that you kept in your back pocket.
     
    已获得burnham-t, Miff, Mark Thompson另外1人的支持.
  5. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,591
    支持:
    3,934
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which bridge is/ was this, Jo?
     
  6. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,347
    支持:
    4,078
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Newmill, Summer 1976.
    The one just past Northbridge St L/C looks similar.
     
    已获得BiermeisterMark Thompson的支持.
  7. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,000
    支持:
    3,023
    Here’s @45669 ’s pic of the same bridge (Newmill) in ‘61 when it still had track over. To the left you can see the propping BR had to install to hold it up a little longer.
    https://www.flickr.com/photos/train-pix/5982038908
     
    已获得The Dainton BankerMark Thompson的支持.
  8. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,591
    支持:
    3,934
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I did wonder if it was bridge 6. The most recent photo of that suggests that too has been displaced, but with the passage of so much time, it's hard to tell. Had Newmill bridge been deliberately damaged, or was it floodwater, do you know? I visited the line for the first time in summer 76, and walked the track from Northiam to just short of Rolvenden, so I must have walked over this! Strewth.
     
    Last edited: 2024-08-18
  9. johnofwessex

    johnofwessex Resident of Nat Pres

    注册日期:
    2015-04-06
    帖子:
    9,748
    支持:
    7,858
    性别:
    职业:
    Thorn in my managers side
    所在地:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer

    The track is in very good condition, did BR relay the line?
     
  10. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,347
    支持:
    4,078
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was floodwater. Remember that this land used to be sea, so the tide is always nearby. The people responsible for the channel took action and raised a dyke along both sides all the way along. Before reinstating the line (tracks down, but unusable) we had to rebuild the bridge and run up and over the new heights. The same had to be done a bit further along, over the Hexden channel. I do recall further flooding at Wittersham later on, when even that raised dyke was breached. So the water certainly went up and down. I think flotsam attaches to the current (raised) Bailey bridge even now.

    Newmill summer 1976b.jpg


    In the picture you can see the old beams taken out, and a start being made for ramps each side to get over the new height. With wheelbarrows.... Later, mine waste was dumped with Dogfish through the track.
    The more recently built Austen bridge was a lot more substantial.
    Once, the Newmill Channel was so low that I was able to wade around in it and fish out a number of two bolt SER chairs, which after a very roundabout trip through my working life abroad, ended up with the Colonel Stephens Museum in Tenterden.
     
    Last edited: 2024-08-19
    已获得Biermeister, burnham-t, Dead Sheep另外7人的支持.
  11. Hirn

    Hirn Member

    注册日期:
    2015-08-11
    帖子:
    512
    支持:
    320
    性别:
    Given that what was done to the bridge was after the decision on the Transport and Works Order was announced but before it formally took effect, that would detract from any value due to the owners if there was any.

    Any effects from what went into the water under it while the recent owners still had it, that would be between them and the Drainage Board or the Environment Agency.
    If that were to exacerbate some future exceptional flood - and the KESR has been affected within the last twenty years by two hundred year floods within ten days...............

    (Effectively the T&WO updated, double checked or better, the future estimates from the experience of those floods)
     
    已获得H Cloutt的支持.
  12. Hirn

    Hirn Member

    注册日期:
    2015-08-11
    帖子:
    512
    支持:
    320
    性别:
    Yes, indeed they did.
     
    已获得DavidWH Cloutt的支持.
  13. burnham-t

    burnham-t New Member

    注册日期:
    2008-02-26
    帖子:
    104
    支持:
    86
    性别:
    所在地:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The "new" bridge over the New Mill Channel (now nearly 50 years old of course) I believe used Callendar-Hamilton bridge components, second hand from a temporary road bridge over the Medway at Aylesford. Rearranged to suit the higher loading of the railway bridge.
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,263
    支持:
    12,514
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That has to be the understatement of the year, I wonder has any of the supporters of the owner of the farm, on who's land the "damage" happened posted in support of these actions, I just hope it was reflected in the value of the land, minus the replacement costs, and I hope the Environment agency levies a heavy fine in regard of the leakage of material into the river rother, on the same owner, as it was on her land at the time, compare this to the behaviour of the RVR, who has paid for numerous measures to protect the riverways, and land it has purchased, and had to agree to when exercising its powers as regards the TWO.
    "
     
    已获得Miff, desperado, Dead Sheep另外3人的支持.
  15. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,024
    支持:
    1,498
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I rather think that the 'supporters' were unaware that this had occurred. In fact RVR have been 'tight lipped' about the extent of the damage until very recently. It is easy to speculate and I am trying not too. The good news is that repairs are well advanced.
     
    已获得burnham-tBiermeisterWenlock的支持.
  16. FearOfManchester

    FearOfManchester Member

    注册日期:
    2016-01-24
    帖子:
    362
    支持:
    418
    性别:
    所在地:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think we can make some deductions here Watson through some simple questions, is this bridge on a tract of land in which the owner was refusing to sell and was against the railways reinstatement? Is the timing of the damage interesting in that it muddies the waters on who is liable for said damage? (I believe that’s been answered upthread), whatever happened, and I hope the vagueness is due to some sort of ongoing legal consequences, it shall come out in the fullness of time, you can hardly damage a bridge that extensively and get away without local people knowing the details, it’s a tremendous act of spite regardless.
     
    已获得stallis1, Mark Thompson, clinker另外3人的支持.
  17. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,024
    支持:
    1,498
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Further pictures of the repairs to Austens Bridge have been posted to the blog - click here. The contractors are doing a very thorough job.
     
    已获得DavidW, Mark Thompson, Dead Sheep另外2人的支持.
  18. 21B

    21B Part of the furniture

    注册日期:
    2009-09-02
    帖子:
    3,889
    支持:
    8,633
    I hope that by the time the railway is completed and opened the perceived wound will have healed sufficiently that there are no future “actions”. The railway and the land owners need to rub along. I’m sure the railway will want to do just that, and let’s hope those that opposed the railway do the same.
     
    Last edited: 2024-09-02
    已获得Hirn, alastair, clinker另外7人的支持.
  19. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,024
    支持:
    1,498
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Three furter posts appear on the blog today - click here. Things are moving forward on a number of fronts,
     
    已获得Johnme101Mark ThompsonMiff的支持.
  20. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,263
    支持:
    12,514
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Has this additional work impacted on the time schedule to re-open this section? replacing and repairing those two bridges must had an impact, certainly on the costs, I dare say there would have been some attention needed on the bridges anyway, they have not seen any attention since the line closed, and at least the work being done will ensure they won't need much in future, compared to this, the level crossings should be quite straight forward as they are pre assembled sections that just need to be craned in , As regards the environmental damage done to the Rother, by the actions of those who did the damage to the bridge, It would be very fitting if the fines and costs of cleaning up the damage were so huge as to leave the former owner of the land in who's ownership it was at the time the damage was done, end up costing more, than they received for the land when the RVR purchased it.
     