If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GCR Black 5 No 45491

الموضوع في 'Steam Traction' بواسطة Flying Phil, بتاريخ ‏16 أوت 2021.

  1. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe the tube plate is a new one - but it could have been made over a year ago and been awaiting machining etc, hence the not "new" appearance....but I am only making reasonable assumptions.
     
    Keith Cake, Johnme101 و misspentyouth62 معجبون بهذا.
  2. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,717
    عدد المعجبين:
    2,221
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Phil - good news either way :)
     
  3. Bill2

    Bill2 New Member

    إنضم إلينا في:
    ‏14 أوت 2020
    المشاركات:
    131
    عدد المعجبين:
    295
    الجنس:
    ذكر
    مكان الإقامة:
    Wilmslow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Rogers' book says the manufacturing fault was that the central portion of the stays had been machined to too small a diameter. Riddles was actually third in command at the time because Stanier was in India and S.J. Synes off sick.
     
  4. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,423
    عدد المعجبين:
    1,707
    I think I read somewhere that the previously fitted one had to be replaced because of a paperwork issue. Which has set the loco back a fair bit, presumably, as I seem to recall it had been tubed as well, before it all came to bits again.
     
  5. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ...See post #24 - where it was expected to be hydraulically tested.
     
  6. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is the new tube plate in position but not yet rivetted.
    DSC03804.JPG DSC03803.JPG

    And the ashpan looking complete.
     
    ax1709cjm, CH 19, Johnme101 و 2 آخرون معجبون بهذا.
  7. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The tube plate has been partially fixed in place with nuts and bolts - so drilling to size and rivetting next? Also note that the various "temporary" sheds have been removed from in front of the loco shed.
    DSC03940.JPG
     
    Chris86, Bluenosejohn, ax1709cjm و 4 آخرون معجبون بهذا.
  8. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are a few more nuts and bolts holding the front tube plate in place and one or two small tubes have been slid into the boiler, so slow and steady progress.
    DSC04189.JPG
     
  9. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please might someone correct me if im wrong, but have we recently moved in to an era of fabricated tube plates, as opposed to pressed ones? This is the second such example iv seen in recent weeks.

    Or have i just missed that its been going on for a while?

    For clarity, a flat sheet that has been laser/waterjet cut for the tube holes, welded up to a rolled ring to form the feature for riveting to the barrell.
     
  10. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know if it's universal but we still have the ability to press out a tubeplate. This is 2968's prior to fitting, taken 3 August 2017 and 6 February 2020.

    [​IMG]

    [​IMG]
     
    3ABescot, Johnme101, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  11. 60044

    60044 Member

    إنضم إلينا في:
    ‏24 فبراير 2016
    المشاركات:
    780
    عدد المعجبين:
    1,207
    الجنس:
    ذكر
    مكان الإقامة:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think fabricated tubeplates have been around for a long time - I think 6619 received one when it was first restored in the 1980s.I believe that 30825 is in the process of having a new one made at Grosmont, and I was surprised to read in"Moors Line" that it was described as Technically challenging". I was also a bit surprised to learn that it is being made by drilling the holes the old-fashioned way, rather than having them laser or water-jet cut because it was too expensive or a suitable contractor couldn't be found. Clearly a traditional pressed example would be best, but then it's a question of finding or making a correct-sized die and block.
     
    أعجب بهذه المشاركة W.Williams
  12. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Expense I can believe. If one has a decent radial drill or similar in house, outsourcing such a large part to a 3rd party will always feel more expensive. The benefit of volunteers, they are nearly impossible to compete with if you have the time to do the work.
     
  13. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m quite surprised that pressed tubeplates are still being made. Good to see this, though.
     
  14. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,717
    عدد المعجبين:
    2,221
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm sure I'm wrong in imagining that steel pressed into a former giving 90 corners is more likely to create stress cracking?? Or would a welded joint be less or more optimal?
     
    أعجب بهذه المشاركة MellishR
  15. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Typically this is done with heat, and the steel is at the correct condition & material specification before its pressed. There are also rules on bend radii for given thicknesses. No stress cracking if done correctly.


    Its horses for courses on the welded / pressed in this instance. Fabrication cost is one of the biggest drivers, and having someone design and then machine up the correct formers and then finding a suitable X hundred potentially X thousand tonne press, v having a plate laser cut and a ring rolled for the barrel then a coded welder marry the two....


    I know what my first preference would be. Machining formers and pressing is intense.


    FWIW I don’t really like the men with hammers and oxy torches method doing it over a small former/dolly. It looks like too much hard work to this engineer. But hey, I’m not a boilersmith...
     
    misspentyouth62, CH 19, ragl و 1 شخص آخر معجبون بهذا.
  16. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IIRC, that's what they did for the Duplex in America.

    Dunno if this will work, but it seems to be men with hammers
    https://prrt1steamlocomotivetrust.org/boiler-gallery/
     
  17. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That’s the way most firebox and tubeplate flangings are done these days. I think only the South Devon have a suitable press for doing the job - a 700 ton vicing press. Israel Newton did have a smaller one but I don’t know it’s current position
     

مشاركة هذه الصفحة