If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Rasprava u 'Steam Traction' pokrenuta od class8mikado, 13. Rujan 2013..

  1. LMS2968

    LMS2968 Part of the furniture

    Pridružen(a):
    1. Rujan 2006.
    Poruka:
    3,072
    Lajkova:
    5,361
    Spol:
    Muškarac
    Interesi:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Grad:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Similar to the GWR system? Having the cylinders in place might make fitting the truck a bit more involved but not, I suspect, impossible. Removal of the pony truck on any engine was common routine repair and maintenance, if only to provide access to the underside of the middle cylinder.
     
    class8mikado se sviđa ovo.
  2. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,280
    Lajkova:
    12,527
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At this rate, will the P2 be completed in time to replace Tornado, when its 7 year ticket expires? A boiler due how many years ago, that was said to be ready soon, is if reports are true, nowhere even looking like a boiler, has not progressed beyond pressing boiler plate, you have to ask, why, the most common fault is money, or lack of it, for when projects stall, On the face of it the trust is showing signs that there are problems, yet the accounts show that there is money availible in the boiler fund, for this boiler but clearly the builder is hampered by sometthing, I actually am questioning where did the money to overhaul tornado's boiler come from, did it in fact come from the P2 boiler fund, and that's why work has stalled on the next boiler for the P2?
     
  3. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,843
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Dont ever recall seeing a picture of Tornado boiler and new boiler no 1 next to each other !‍♂️ However there is a picture of one largely externally complete from last October, and so i wonder how far its actually progressed and whether tubes and firebox fittings wont be done in the UK now after what happened with Tornado
    Also the possibility is that there is a sizeable payment on delivery and until a required delivery date can be given to the supplier for when 'P2 is ready to receive a boiler' the supplier only needs to get so far with the work...
     
    Last edited: 16. Listopad 2024.
    Sir Ralph Wedgwood se sviđa ovo.
  4. guycarr360

    guycarr360 Part of the furniture

    Pridružen(a):
    4. Listopad 2005.
    Poruka:
    4,838
    Lajkova:
    3,167
    Spol:
    Muškarac
    Grad:
    Chester le Street County Durham
    With the protracted overhaul of Tornado, coming to a conclusion (hopefully), why have a big chunk of money sitting in Darlington, in another boiler, when Meineghan could complete in say 2 months.
    It will take longer than that to complete the pony truck, and fit the cylinder casting, before they can even think about the boiler.
    You then pay off the final staged payment, when you need to, as for fittings and tubes, do we know they are ready / acceptable by the insurers, after the last experience.
    Still think the chances of a 2025 unveiling are fading fast, what nobody knows is how much is ready to "bolt on", as assembly could be swift.
    It also seems that many processes are now subbed out, that leaves you at the discretion of their willingness to expedite work.
     
  5. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,280
    Lajkova:
    12,527
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So why not say to the rest of the trust supporters, this is the plan going forward? that the boiler has been brought this far, and will be finished after the cylinders are on, assuming it is only a matter of a few months work, The problem is this vacuum of information from those at the top, no one knows how things are progressing, for all we know this might have been an already agreed stage, that the boiler would be progressed up to a certain point, As regards the tubing, at the very least , I hope that the boiler inspector will be on hand to witness the tubes being fitted and the welding done to the agreed standard, so there is no repetition of what happened with Tornado, , in fact it should be taken further with inspection during the assembly stage to ensure everything is as it has been agreed , that there is no distorted platework, or heating/ stress related problems over welded sub-assemblies.
     
    Sir Ralph Wedgwood se sviđa ovo.
  6. The Green Howards

    The Green Howards Nat Pres stalwart

    Pridružen(a):
    20. Veljača 2016.
    Poruka:
    15,111
    Lajkova:
    8,636
    Interesi:
    Layabout
    Grad:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm reckoning on 2027 at a minimum now; and you're right in saying with that so much being subcontracted out that you are very much at the mercy of the subcontractors.

    The only thing I'm unsure about in your post is the speed at which Meiningen could work.
     
    Sir Ralph Wedgwood se sviđa ovo.
  7. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,843
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do I take it that nothing much was said, and nothing much asked about the boilers at the convention ? , everyone too giddy about the precious things of the shop...
     
    Sir Ralph Wedgwood se sviđa ovo.
  8. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,280
    Lajkova:
    12,527
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    2027, i am betting on it being nearer to 2029, because i can see the funding drying up, or not keeping up with the costs involved with sub contracting out of the assembly of the P2, costs are already well above what they were when the project was launched, and are not going to get any lower, and of course rectifying mistakes made along the way, caused by a lack of oversite of each stage of the assembly,
     
    Sir Ralph Wedgwood se sviđa ovo.
  9. guycarr360

    guycarr360 Part of the furniture

    Pridružen(a):
    4. Listopad 2005.
    Poruka:
    4,838
    Lajkova:
    3,167
    Spol:
    Muškarac
    Grad:
    Chester le Street County Durham
    No idea, why dont you ask them, the email address is
    or you could call them instead 01325 460163

    I might call in for the next open day, they are only 25 miles away.

    If i hear anything i will let you know....
     
  10. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,737
    Lajkova:
    11,856
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So, is all that fact or just your speculation of things?
     
  11. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,308
    Lajkova:
    5,746
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's Martin. Do you need to ask?
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,280
    Lajkova:
    12,527
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm just reacting to the points others have brought up, the trust isn't saying, so no one knows what is fact, but Is what i have asked so bad, ?
    I'm not blaming anyone just asking, why can't the facts be published, then at least it becomes clear, what the plan is and the timescales, because without facts, are we all not left guessing? and so far, a lot of the rumours have been proved right, the boiler problems, the clearances, the need to turn down new tyres, all pose questions about why these mistakes have occurred, and could they have been avoided, and what's being done to prevent further setbacks. you will disagree with me, I know, but I think these are valid questions.
     
  13. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,737
    Lajkova:
    11,856
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They are indeed valid questions but what you are suggesting they should do is based on pure speculation by you regarding the boilers.
     
  14. Eightpot

    Eightpot Resident of Nat Pres Friend

    Pridružen(a):
    10. Kolovoz 2006.
    Poruka:
    8,340
    Lajkova:
    2,506
    Spol:
    Muškarac
    Interesi:
    Engineer Emeritus
    Grad:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's gone very quiet about this loco.......
     
  15. RLinkinS

    RLinkinS Member

    Pridružen(a):
    8. Studeni 2008.
    Poruka:
    982
    Lajkova:
    972
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We visited the Hopetown workshop in late September and one of the volunteers observed that thre was little progress because everyone was at Loughborough sorting out Tornado

    Sent from my SM-A105FN using Tapatalk
     
  16. William Fletcher

    William Fletcher Member

    Pridružen(a):
    25. Studeni 2016.
    Poruka:
    252
    Lajkova:
    272
    Spol:
    Muškarac
    Grad:
    Lincoln
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ceartainly nothing going on when I vsitied last week, even the push button light for the view ing galler wasn't working!
     
  17. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    1,814
    Lajkova:
    2,045
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's a comment on their facebook page (don't think official comment) stating that a further delay will be caused by delay taken up by transforming the workshop into a "world class" resource to support the S&DR celebrations.
    And no public photos of any progress...
     
  18. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,062
    Lajkova:
    3,138
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Still no sign of the new boiler(s) then?
     
  19. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,062
    Lajkova:
    3,138
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Had a look on the P2 page and group, can’t see anything along those lines?
     
  20. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    1,814
    Lajkova:
    2,045
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A couple of screen shots as I couldn't do it.
    all on one
     

    Privici:

Podijelite ovu stranicu