    Work on 777 had been paused whilst there was a possible asbestos investigation. Now work has been restarted but the bogie is still not replaced under the tender. I think the boiler work has been done in terms of rivetting, but it still needs all the small and large tubes to be installed.
     
    MattA, 3ABescot und CH 19 gefällt dies.
  2. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed, the tender is still awaiting its front bogie to be put in place, there is more work being done on the chassis., there is no motion, valves or pistons in place.
     
    Johnme101 und Haighie gefällt dies.
  3. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the boiler outside and rest of the locomotive inside the shed.
    IMG20240811102611_BURST000_COVER.jpg IMG20240811102019.jpg
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more work done on the chassis, between the frames, so steady progress - with the hope that it may be in steam in the latter part of next year.
     
    CH 19, alts1985, clinker und 2 anderen gefällt dies.
  5. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is a view of the other side of the boiler.

    DSC03805.JPG
     
  6. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more prepping and painting of the frames and the motion has been cleaned but not installed. Work has been done on the piston valves, but no rings fitted yet. The front tender bogie looks complete but is still in front of the tender. Work has been done on the brake brackets.
     
  7. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interestingly in the latest issue of MainLine there is to be a "Sir Lamiel" centenary event on June 21st. The frames have been prepped and painted with much of the motion ready to be put back on. The boiler is due to have its tubes fitted soon. Could it be steaming in the Summer?
     
    Johnme101 und The Gricing Owl gefällt dies.
  8. JR4489

    JR4489 New Member

    Registriert seit:
    2 September 2022
    Beiträge:
    29
    Zustimmungen:
    71
    Geschlecht:
    männlich
    Ort:
    Cambs
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very unlikely, unfortunately. The boiler needs to have 2 rows of roof stays replaced, which requires the removal of 2 sections of boiler plate to access the stays. The tender needs lifting so that the rear bogie can be taken out and overhauled. See latest update here:
    https://www.sirlamiel.org.uk/2024/12/02/october-2024/

    Current estimate for a return to service (according to the latest 5305LA newsletter) is spring 2026.
     
    Bluenosejohn gefällt dies.
  9. The Gricing Owl

    The Gricing Owl Well-Known Member

    Registriert seit:
    29 September 2023
    Beiträge:
    1.036
    Zustimmungen:
    1.964
    Geschlecht:
    männlich
    Beruf:
    Owl and SR steam gricer
    Ort:
    Near steam Man of Kent and Golden Arrow route
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To emerge as 30777? :):):):):)

    Bryan B
     
  10. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.107
    Zustimmungen:
    8.634
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not sure it could come out as anything else if it's going to be in BR Green? I mean, if it was in Malachite it could carry either a SR or BR identity...
     
    mike1522 und The Gricing Owl gefällt dies.
  11. Swan Age

    Swan Age Member

    Registriert seit:
    8 September 2005
    Beiträge:
    952
    Zustimmungen:
    271
    Geschlecht:
    männlich
    Ort:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting that they have to cut open the boiler again, to replace the crown stays. It seems a drastic measure.

    Is the boiler of fundamentally different design to those others remaining in preservation fitted to the S15's both Urie and Maunsell types.

    Im sure that when the Urie group did a comprehensive rebuild of 506's boiler at Ropley they managed to replace the crown stays from inside the boiler barrel using a fabricated tool to get access to them. It wasn't easy mind from what I remember from the report by the guys that did it.
     
  12. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.732
    Zustimmungen:
    11.848
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I seem to recall the same was done with 825’s boiler when the front sling stays were done. The alternative is to gut the boiler. It’s not a big job to cut a couple of access holes and then replace them.
     
    Swan Age gefällt dies.
  13. Flying Phil

    Flying Phil Part of the furniture

    Registriert seit:
    10 Dezember 2018
    Beiträge:
    3.018
    Zustimmungen:
    6.319
    Geschlecht:
    männlich
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed but has had more work done in preparation for the tubes to be fitted. It now looks smarter with the firebox painted as well.
    DSC04190.JPG
     
  14. class8mikado

    class8mikado Part of the furniture

    Registriert seit:
    1 Juni 2009
    Beiträge:
    3.840
    Zustimmungen:
    1.644
    Beruf:
    Print Estimator/ Repository of Useless Informatio.
    Ort:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Arevthose the 'crinolines' for the cladding ? not much room for insulation is there....
     