    Looking at the view from above I think that the bridge is not that close to the road.
     
  2. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That crossing has always had very long lead times, certainly longer than Robertsbridge, and the A2100. Does anyone know why that is?
     
    أعجب بهذه المشاركة H Cloutt
  3. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is not a problem.
    Numerous locations on the Network where this happens. Nearest to me that I have worked on is Connonley near Skipton.
    And that situation is a bridge over a stream at a platform end adjacent to a Level Crossing.
     
  4. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder if the delay in longer for southbound trains. I think the barrier is down before the train enters the station so the time that the train is standing at the platform needs to be added to the time the barrier is down. We recently were held up at Robertsbridge since the London bound service was 12 cars and blocked the crossing.
     
  5. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's certainly the case, although the setup at Robertsbridge is identical, but then I use that road a lot less, so maybe any waits I've had there haven't registered on the impatience scale!
     
  6. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder whether it is because the signal box is at Robertsbridge - not sure how Level Crossings work these days.
     
    أعجب بهذه المشاركة Mark Thompson
  7. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good point. Im unsure, myself.
     
  8. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    clinker, burnham-t, The Dainton Banker و 3 آخرون معجبون بهذا.
  9. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Update on Station ramp HERE - materials appearing for the next phase.
     
    Mark Thompson و clinker معجبون بهذا.
  10. Fireline

    Fireline Well-Known Member

    إنضم إلينا في:
    ‏11 فبراير 2008
    المشاركات:
    1,301
    عدد المعجبين:
    1,348
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nice to see Andrew Wood multitasking again. He really has been a massive asset to the project.
     
  11. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good to see progress, once the concrete pour is done and the material has then had time to do off and settle, at least the track bed clearance can then resume, Would I be correct that its likely to be done from Austins bridge towards Salehurst first, with the first level crossing to go in being the one at Junction Rd? then Northbridge Street leaving the big one the A21 till last?
     
    Hirn و H Cloutt معجبون بهذا.
  12. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    I don't believe the order's been announced. The report makes it clear Austen's bridge is required as soon as possible for access by the construction vehicles needed to recreate the railway formation from there.
    The dates road-closures'd be allowed'll also depend on co-ordination with the two highway-authorities involved (the TWAO means they can't refuse the works, but they could refuse specific road-closure dates if conflicting with other works or activities on any of the affected highways).
     
    hyboy و DavidW معجبون بهذا.
  13. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Too early to say, although I'm sure that everything has already been planned out in military detail. I might hazard a guess that the spans for bridge 25 would be brought in via Junction Road, though, and hence the need to have the deck of Austen's bridge fully set ASAP, but that's only my surmise.
     
    Hirn و Miff معجبون بهذا.
  14. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That was my thought - given that the firm working on Bridge 25 is based in Junction Road that would make sence. With regard to the level crossings we will be told when we need to know.
     
    أعجب بهذه المشاركة Mark Thompson
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Plus, the track bed would need to be cleared and prepared, and in some places rebuilt and a firm surface created, in order to get the bridge sections brought into place, that would need to be done, before the anything else, drainage improved or completely renewed, so that's a lot of work even before the first sleepers can go down,
     
  16. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Miff و Mark Thompson معجبون بهذا.
  17. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,591
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You beat me to it!
    It must be incredibly frustrating, trying to complete a job like this with conditions like they have been these last few weeks. How has the Rother been behaving during "Bert"?
     
    أعجب بهذه المشاركة H Cloutt
  18. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,024
    عدد المعجبين:
    1,498
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Picture have been posted online of flooding to the fields east of the A21 Robertsbridge Bypass - not sure how significant this is.
     
    أعجب بهذه المشاركة Mark Thompson
  19. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    The latest Tenterden Terrier says K&ESR & RVR joint planning is currently on the basis of the public opening of the extension some time in '28. Lots to do before then :)
     
    hyboy, H Cloutt و Mark Thompson معجبون بهذا.
  20. paul1609

    paul1609 New Member

    إنضم إلينا في:
    ‏9 جوان 2006
    المشاركات:
    67
    عدد المعجبين:
    111
    الجنس:
    ذكر
    مكان الإقامة:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Udiam weir is the last on the River Rother before it reaches it's sea lock at Scots Float near Rye.
    The weir is next to the former site of Junction Road Halt and is monitored you can see the water level online here: https://check-for-flooding.service.gov.uk/station/1126
     