If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Rasprava u 'Steam Traction' pokrenuta od class8mikado, 13. Rujan 2013..

  1. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,655
    Lajkova:
    1,566
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Metal fatigue is independent of speed.
     
  2. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,346
    Lajkova:
    17,834
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Entirely agree with no wish to go there again, now if only a moderator would see this they could delete the associated posts.... ;)
     
  3. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,854
    Lajkova:
    1,655
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Definitely no plans to ask if the P2 can be allowed above 75....
     
  4. RAB3L

    RAB3L Member

    Pridružen(a):
    4. Siječanj 2013.
    Poruka:
    501
    Lajkova:
    293
    Don't you mean the conductor rail?
     
    Dunfanaghy Road se sviđa ovo.
  5. RLinkinS

    RLinkinS Member

    Pridružen(a):
    8. Studeni 2008.
    Poruka:
    984
    Lajkova:
    973
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But stress may be dependent on speed and increasing stress will reduce the time to fatigue failure
     
    Hirn and Steve like this.
  6. Kylchap

    Kylchap Member

    Pridružen(a):
    15. Prosinac 2015.
    Poruka:
    493
    Lajkova:
    936
    Spol:
    Muškarac
    Grad:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The P2 (if it eventually runs) is seen as a hauler, not a racehorse like Tornado. If my memory is correct, the late David Elliott once told me that there was no evidence that the P2s had ever run faster than 80mph.
     
    Hirn se sviđa ovo.
  7. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,812
    Lajkova:
    12,008
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    However speed on a loco is linked to rotation of wheels and rotation is linked to cycles and fatigue is linked to cycles
     
    Hirn se sviđa ovo.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    28,017
    Lajkova:
    65,574
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But if you do a journey of a given length, don’t you do the same number of wheel rotations and therefore cycles? So if a loco covers 100 miles in two hours at 50mph or in 1h 20 at 75mph, it has done the same number of cycles …

    Tom
     
    Sheff and Steve like this.
  9. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,164
    Lajkova:
    29,585
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This non-engineer, who understands that the faster something goes the more energy it uses, doesn't quite understand how fatigue in a moving part can't be linked to the amount of energy going through it.
     
  10. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    4,943
    Lajkova:
    7,731
    Come on - think about it. The only way that a steam loco running at 90 mph is going to be of any benefit/compatability with the modern railway is if there is a diesel on the back powering like hell:eek:. A steam loco on its own just does not have the acceleration charastics of modern traction and there is no point in pretending otherwise. If Tornado takes say 10 miles to get up to 90 mph when the following train does it in less than a mile you are not that compatable. Granted it is better if you use a diesel on the back to aid acceleration but..... that is not what people (at least on here) want. Oh, the realities of main line steam in the 2020s:)!

    Peter
     
    Sheff, keith6233, Steve i 1 drugoj osobi se sviđa ovo.
  11. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,164
    Lajkova:
    29,585
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Surely acceleration is only half of the issue? Isn't the other about the ability of a train, once at speed, to stay out of the way of other services?
     
    Hirn and MellishR like this.
  12. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,346
    Lajkova:
    17,834
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My old man was saying, even when we started doing tours in the late 70's, that it would be acceleration (or lack thereof) which would eventually see steam off the mainline... And its hugely worse now electric has replaced diesel on many mainlines.

    Oh and stop calling @torgormaig Shirley.... ;)
     
  13. Enterprise

    Enterprise Part of the furniture

    Pridružen(a):
    9. Rujan 2005.
    Poruka:
    5,486
    Lajkova:
    3,320
    Running faster downhill, as in steam days, would make a difference, but possibly not much.
     
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    28,017
    Lajkova:
    65,574
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just applying a fag packet calculation: Let’s take @torgormaig numbers - a steam hauled train that takes 10 miles to reach 90mph, vs a modern unit that gets there in 1 mile. Let’s also assume the acceleration is linear (unlikely, but fag packet calculation).

    The electric train takes 80 seconds to run the first mile, and 40 seconds for each of the 9 subsequent miles - 440 seconds in total to run 10 miles (or about 7m 20s)

    The steam-hauled train takes 800 seconds to get to 90 mph - or 13 minutes 20 seconds.

    In other words - the steam special could be given a six minute head start and the electric would catch it after ten miles …

    Tom
     
    Sheff se sviđa ovo.
  15. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,812
    Lajkova:
    12,008
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But my post was simply in relation to speed not time or distance. The reality is that they are all interlinked, along with stress variation and even design which, badly done, creates stress raisers.
     
    Sheff, Hirn i Jamessquared se sviđa ovo.
  16. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,346
    Lajkova:
    17,834
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is veering very close to laden vs unladen African or European Swallows.....
     
  17. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,991
    Lajkova:
    5,920
    At the time of the run that was suspected to have been an unintentional consequence of the general restriction of steam to 75 mph. It did seem illogical that both Tornado and Mk Is were allowed to do 90 mph but not together.
     
    Hirn se sviđa ovo.
  18. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    4,943
    Lajkova:
    7,731
    That sounds awfully like a Nat Pres urban myth to me. I have never heard of Mark 1s being limited to 75 mph specifically behind steam. They are normally 100 mph vehicles and the only limiting factor in them not running at that speed behind steam is the limit imposed on the the loco itself and not on the stock. Just like they are limited to 95 mph behind a Class 47 diesel.

    Peter
     
  19. steam_mad

    steam_mad Member

    Pridružen(a):
    18. Travanj 2011.
    Poruka:
    686
    Lajkova:
    1,498
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's specifically included in the regulation 4 exemptions, extract from the current LSL document available online:
    "(d) The operator must ensure that the Rolling Stock shall not be operated:
    (i) at a speed exceeding 75 mph (120 kph) for steam operations: or
    (ii) at a speed exceeding the plated speed of the coach for electric or diesel operations."​
     
    Hirn se sviđa ovo.
  20. 30567

    30567 Resident of Nat Pres Friend

    Pridružen(a):
    7. Kolovoz 2012.
    Poruka:
    6,152
    Lajkova:
    4,110
    I'm surprised you say that Peter. I thought the model was that if you can run at 75mph max with steam, you can have a 60mph path. Whereas if you can run at 90max,you can step up to a 75mph path and probably run for the most part at 80-85 well within the performance rating of an A1. So the model was York in four hours, 100 mins to Grantham, 40mins to water while two LNER flights pass, another 100 mins to York. There are 75mph schedules on the ECML,there must have been discussions about what would be possible say on a Saturday. It wasn't complete cloud cuckoo land either commercially or operationally ten years ago.

    Peter
     
    Hirn se sviđa ovo.

Podijelite ovu stranicu