If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

本贴由 class8mikado2013-09-13 发布. 版块名称: Steam Traction

  1. W.Williams

    W.Williams Well-Known Member

    注册日期:
    2015-12-20
    帖子:
    1,655
    支持:
    1,566
    职业:
    Mechanical Engineer
    所在地:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Metal fatigue is independent of speed.
     
  2. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Entirely agree with no wish to go there again, now if only a moderator would see this they could delete the associated posts.... ;)
     
  3. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,854
    支持:
    1,655
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Definitely no plans to ask if the P2 can be allowed above 75....
     
  4. RAB3L

    RAB3L Member

    注册日期:
    2013-01-04
    帖子:
    501
    支持:
    293
    Don't you mean the conductor rail?
     
    已获得Dunfanaghy Road的支持.
  5. RLinkinS

    RLinkinS Member

    注册日期:
    2008-11-08
    帖子:
    984
    支持:
    973
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But stress may be dependent on speed and increasing stress will reduce the time to fatigue failure
     
    已获得HirnSteve的支持.
  6. Kylchap

    Kylchap Member

    注册日期:
    2015-12-15
    帖子:
    493
    支持:
    936
    性别:
    所在地:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The P2 (if it eventually runs) is seen as a hauler, not a racehorse like Tornado. If my memory is correct, the late David Elliott once told me that there was no evidence that the P2s had ever run faster than 80mph.
     
    已获得Hirn的支持.
  7. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,812
    支持:
    12,008
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    However speed on a loco is linked to rotation of wheels and rotation is linked to cycles and fatigue is linked to cycles
     
    已获得Hirn的支持.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,017
    支持:
    65,574
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But if you do a journey of a given length, don’t you do the same number of wheel rotations and therefore cycles? So if a loco covers 100 miles in two hours at 50mph or in 1h 20 at 75mph, it has done the same number of cycles …

    Tom
     
    已获得SheffSteve的支持.
  9. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    29,164
    支持:
    29,583
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This non-engineer, who understands that the faster something goes the more energy it uses, doesn't quite understand how fatigue in a moving part can't be linked to the amount of energy going through it.
     
  10. torgormaig

    torgormaig Part of the furniture Friend

    注册日期:
    2007-07-17
    帖子:
    4,942
    支持:
    7,730
    Come on - think about it. The only way that a steam loco running at 90 mph is going to be of any benefit/compatability with the modern railway is if there is a diesel on the back powering like hell:eek:. A steam loco on its own just does not have the acceleration charastics of modern traction and there is no point in pretending otherwise. If Tornado takes say 10 miles to get up to 90 mph when the following train does it in less than a mile you are not that compatable. Granted it is better if you use a diesel on the back to aid acceleration but..... that is not what people (at least on here) want. Oh, the realities of main line steam in the 2020s:)!

    Peter
     
    已获得Sheff, keith6233, Steve另外1人的支持.
  11. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    29,164
    支持:
    29,583
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Surely acceleration is only half of the issue? Isn't the other about the ability of a train, once at speed, to stay out of the way of other services?
     
    已获得HirnMellishR的支持.
  12. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My old man was saying, even when we started doing tours in the late 70's, that it would be acceleration (or lack thereof) which would eventually see steam off the mainline... And its hugely worse now electric has replaced diesel on many mainlines.

    Oh and stop calling @torgormaig Shirley.... ;)
     
    已获得Sir Ralph Wedgwood, Paul42, 5944另外2人的支持.
  13. Enterprise

    Enterprise Part of the furniture

    注册日期:
    2005-09-09
    帖子:
    5,486
    支持:
    3,320
    Running faster downhill, as in steam days, would make a difference, but possibly not much.
     
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,017
    支持:
    65,574
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just applying a fag packet calculation: Let’s take @torgormaig numbers - a steam hauled train that takes 10 miles to reach 90mph, vs a modern unit that gets there in 1 mile. Let’s also assume the acceleration is linear (unlikely, but fag packet calculation).

    The electric train takes 80 seconds to run the first mile, and 40 seconds for each of the 9 subsequent miles - 440 seconds in total to run 10 miles (or about 7m 20s)

    The steam-hauled train takes 800 seconds to get to 90 mph - or 13 minutes 20 seconds.

    In other words - the steam special could be given a six minute head start and the electric would catch it after ten miles …

    Tom
     
    已获得Sheff的支持.
  15. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,812
    支持:
    12,008
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But my post was simply in relation to speed not time or distance. The reality is that they are all interlinked, along with stress variation and even design which, badly done, creates stress raisers.
     
    已获得SheffHirnJamessquared的支持.
  16. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is veering very close to laden vs unladen African or European Swallows.....
     
    已获得Sheff, ghost, The Green Howards另外1人的支持.
  17. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,991
    支持:
    5,920
    At the time of the run that was suspected to have been an unintentional consequence of the general restriction of steam to 75 mph. It did seem illogical that both Tornado and Mk Is were allowed to do 90 mph but not together.
     
    已获得Hirn的支持.
  18. torgormaig

    torgormaig Part of the furniture Friend

    注册日期:
    2007-07-17
    帖子:
    4,942
    支持:
    7,730
    That sounds awfully like a Nat Pres urban myth to me. I have never heard of Mark 1s being limited to 75 mph specifically behind steam. They are normally 100 mph vehicles and the only limiting factor in them not running at that speed behind steam is the limit imposed on the the loco itself and not on the stock. Just like they are limited to 95 mph behind a Class 47 diesel.

    Peter
     
  19. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    686
    支持:
    1,498
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's specifically included in the regulation 4 exemptions, extract from the current LSL document available online:
    "(d) The operator must ensure that the Rolling Stock shall not be operated:
    (i) at a speed exceeding 75 mph (120 kph) for steam operations: or
    (ii) at a speed exceeding the plated speed of the coach for electric or diesel operations."​
     
    已获得Hirn的支持.
  20. 30567

    30567 Resident of Nat Pres Friend

    注册日期:
    2012-08-07
    帖子:
    6,152
    支持:
    4,110
    I'm surprised you say that Peter. I thought the model was that if you can run at 75mph max with steam, you can have a 60mph path. Whereas if you can run at 90max,you can step up to a 75mph path and probably run for the most part at 80-85 well within the performance rating of an A1. So the model was York in four hours, 100 mins to Grantham, 40mins to water while two LNER flights pass, another 100 mins to York. There are 75mph schedules on the ECML,there must have been discussions about what would be possible say on a Saturday. It wasn't complete cloud cuckoo land either commercially or operationally ten years ago.

    Peter
     
    已获得Hirn的支持.

分享此页面