Tornado

本贴由 Leander's Shovel2007-10-20 发布. 版块名称: Steam Traction

  1. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    注册日期:
    2023-10-01
    帖子:
    183
    支持:
    153
    性别:
    所在地:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think their problems come down to poor leadership and governance which has led to over promising, under delivering, lack of transparency & communications and taking their covenantors & volunteers for fools.
     
  2. Hermod

    Hermod Well-Known Member

    注册日期:
    2017-05-06
    帖子:
    1,109
    支持:
    317
    性别:
    所在地:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Even Newton ,the smart guy ,was fooled out of money by something called SouthSea Company.
     
  3. The Green Howards

    The Green Howards Nat Pres stalwart

    注册日期:
    2016-02-20
    帖子:
    15,102
    支持:
    8,632
    职业:
    Layabout
    所在地:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Finish building the P2, then stop. If someone else wants to build the V4, let them.

    And to think that years ago, a colleague of mine said he had no desire to fund Mark Allatt's bid for world domination...
     
  4. Sheff

    Sheff Resident of Nat Pres

    注册日期:
    2006-04-21
    帖子:
    8,057
    支持:
    3,137
    性别:
    职业:
    Retired Engineer & Heritage Volunteer
    所在地:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hopefully I’ll get time later to catch up with all the recent posts above. In the meantime, in the immortal words of Columbo … “err just one more thing ……”


    Two new live steam injectors have been fitted during the overhaul - no explanation or justification has been published, although I did hear vague mutterings about reliability and there being a ‘nice pair of live steam units sitting on someone’s shelf’ (I knew about these new A1 injectors way back in June 2022 whilst the loco was still being dismantled at LMS).


    Now at the very same time the Trust launched a fundraising club for a new Exhaust Steam Injector (ESI) for the P2. So why fit an ESI to the P2 if it’s so unreliable? But if you do still intend to, then why not rebuild the one removed from the A1 with new internals thereby reusing the very expensive cast brass body?


    As an aside, the P2 ESI injector club featured a rather uninspiring photo of a live steam unit, laying on a pallet – not great when you’re trying to get folk to part with large sums of cash. I had to bring this to the Trust’s attention whereupon it was replaced with an pic of an actual ESI.


    And now the latest I’m hearing is that more re-work is required to replace all the recently installed pipework and hoses from the tender to the new injectors, due to the newly fitted items being too small in bore and not flexible enough ….


    Sorry to be the bearer of yet more gloom …..
     
  5. green five

    green five Resident of Nat Pres

    注册日期:
    2006-04-30
    帖子:
    6,780
    支持:
    2,608
    性别:
    职业:
    Design Draughtsman
    所在地:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :Facepalm::Facepalm::Banghead::Banghead:
     
  6. Eightpot

    Eightpot Resident of Nat Pres Friend

    注册日期:
    2006-08-10
    帖子:
    8,340
    支持:
    2,506
    性别:
    职业:
    Engineer Emeritus
    所在地:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As the design stage of this 1st boiler started some 20 or more years ago the responsibility has to fall on the original 'top brass', surely? Can it be that they realised that this boiler was turning out to be a disaster thus resulting in the resignations in recent years? Isn't it more a case of the recent incumbents inheriting the situation.
     
    已获得Steve的支持.
  7. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    28,731
    支持:
    28,657
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That was the point of my question about David Elliott. However, the current leadership have to retain ownership of the situation, and it is that performance that is in question
     
    已获得Sheffosprey的支持.
  8. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,492
    支持:
    2,850
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    But it's done @ 130k miles so surely the snags were sorted...just a comment not a criticism...
     
  9. Sheff

    Sheff Resident of Nat Pres

    注册日期:
    2006-04-21
    帖子:
    8,057
    支持:
    3,137
    性别:
    职业:
    Retired Engineer & Heritage Volunteer
    所在地:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting responses chaps.

    In relation to the two new boilers, the intention was to correct the deficiencies of the original, particularly in relation to increasing the water space dimensions between the inner and outer boxes. This would reduce the grate area slightly but this wasn’t seen as a significant issue as the loco steams more than adequately you might say.

    Once the new boilers were delivered the original was to be returned to Germany to be rebuilt to the new spec. This meant that there would then be three identical boilers with common grate components etc. all eminently sensible in my view.

    Why on earth the Trust chose to deviate from this plan is quite beyond me.

    To me, the root cause of all this lies in a lack of supervision and control over their contractors. For major items such as the boilers, there needs to be an agreed inspection schedule, with the construction held at key stages until signed off by the Trust (or its appointed inspector if no competent in-house person). This couldn’t have been in place otherwise how did the boiler have tubes fitted without the necessary internal inspection being carried out. Also the deformations would have been picked up and action agreed, so it would never have reached these shores uncorrected.

    The same goes for certain other components I’m sure.
     
    已获得pmh_74, ragl, The Green Howards另外2人的支持.
  10. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    注册日期:
    2009-05-30
    帖子:
    22,589
    支持:
    22,715
    所在地:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah, the voice of common sense. Maybe all this did happen but not rigorously enough?
     
    已获得Sheff的支持.
  11. Ben Jenden

    Ben Jenden Well-Known Member

    注册日期:
    2019-05-27
    帖子:
    1,166
    支持:
    911
    性别:
    所在地:
    Croydon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Personally at this rate I can't see Tornado going mainline this year. Let it be used on heritage lines this year (if boiler 1 doesn't give up the ghost again) and replace it with boiler 2 of it passes all the rigorous tests. Get Rileys or Leaky Finders to construct boiler 3 and/or completely overhaul boiler 1.

    Finish the P2 but not to be rushed under any circumstances and completely drop the V4
     
    已获得The Green HowardsSheff的支持.
  12. torgormaig

    torgormaig Part of the furniture Friend

    注册日期:
    2007-07-17
    帖子:
    4,906
    支持:
    7,651
    Meanwhile all this much vaunted and highly expensive ERTMS kit sits unused on the loco and will probably be obsolete by the time there is any chance of testing it. It all seems to have gone 'orribly wrong for what ever reason:(.

    Peter
     
    Last edited: 2025-02-06
    已获得RalphWMellishRSheff的支持.
  13. Sheff

    Sheff Resident of Nat Pres

    注册日期:
    2006-04-21
    帖子:
    8,057
    支持:
    3,137
    性别:
    职业:
    Retired Engineer & Heritage Volunteer
    所在地:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’ve lost count of just how many NR test slots they’ve failed to show up for.

    NR can’t be too impressed I imagine.
     
    已获得Sir Ralph Wedgwood的支持.
  14. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,492
    支持:
    2,850
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    Can I humbly summarise ?.. total and utter DLW's bad management. Change is desperately needed....
     
    已获得Sir Ralph WedgwoodSheff的支持.
  15. The Green Howards

    The Green Howards Nat Pres stalwart

    注册日期:
    2016-02-20
    帖子:
    15,102
    支持:
    8,632
    职业:
    Layabout
    所在地:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ETCS is being installed and commissioned on the East Coast Main Line as we write: there have been full line closures between Peterborough and Kings Cross for a couple of weekends now - it's known as the East Coast Digital Programme.

    As I understand it, ETCS is not the same as ERTMS but we do have signalling experts on this forum to correct me if I'm wrong.
     
  16. The Green Howards

    The Green Howards Nat Pres stalwart

    注册日期:
    2016-02-20
    帖子:
    15,102
    支持:
    8,632
    职业:
    Layabout
    所在地:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed - as I said earlier, let someone else build a V4; it'd be ideally suited to the Harry Potter Specials on the West Highland Line.
     
    Last edited: 2025-02-05
  17. Sheff

    Sheff Resident of Nat Pres

    注册日期:
    2006-04-21
    帖子:
    8,057
    支持:
    3,137
    性别:
    职业:
    Retired Engineer & Heritage Volunteer
    所在地:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To me that’s just semantics - it’s whatever you need to operate on the southern end of the ECML, whatever the nomenclature. The Trust said they’d fit it in the 6 month overhaul following successful trails with a temporary installation at the GCR in winter 2021. Yet again the planning, design and implementation were woeful and completion to a stage where the loco can venture back onto the network has only just been reached. Operating with in-cab signalling is still subject to NR testing and acceptance.
     
    已获得Sir Ralph Wedgwood的支持.
  18. The Green Howards

    The Green Howards Nat Pres stalwart

    注册日期:
    2016-02-20
    帖子:
    15,102
    支持:
    8,632
    职业:
    Layabout
    所在地:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
  19. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,729
    支持:
    11,847
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IMHO there’s nothing wrong with welded stays. However, it isn’t just as simple as that. You can have welded stays in clearance holes or you can have them in tight holes. Then you can have them with J prep welds or you can have them with fillet welds. Each variation has advantages and disadvantages. A clearance hole essentially lengthens the flexible length of the stay. However, the clearance soon fills up with corrosion and that effectively shortens the flexible length. A fillet weld also increases the effective length and has the advantage over the J prep welds of being easily removable when changing but burns away on the fire side so requires more frequent changing. There are advantages and disadvantages to all these variations and you take your choice.
     
    已获得Sheff, clinker, Big Al另外1人的支持.
  20. brennan

    brennan Member

    注册日期:
    2016-09-11
    帖子:
    408
    支持:
    452
    所在地:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "IMHO there’s nothing wrong with welded stays".....leaving aside that the welds are prone to cracking due to cyclic stresses!
     