If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

30777 to be overhauled

本贴由 59442020-07-22 发布. 版块名称: Steam Traction

  1. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work on 777 had been paused whilst there was a possible asbestos investigation. Now work has been restarted but the bogie is still not replaced under the tender. I think the boiler work has been done in terms of rivetting, but it still needs all the small and large tubes to be installed.
     
    已获得MattA3ABescotCH 19的支持.
  2. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed, the tender is still awaiting its front bogie to be put in place, there is more work being done on the chassis., there is no motion, valves or pistons in place.
     
    已获得Johnme101Haighie的支持.
  3. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the boiler outside and rest of the locomotive inside the shed.
    IMG20240811102611_BURST000_COVER.jpg IMG20240811102019.jpg
     
    已获得Johnb, banburysaint, decauville1126另外6人的支持.
  4. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more work done on the chassis, between the frames, so steady progress - with the hope that it may be in steam in the latter part of next year.
     
    已获得CH 19, alts1985, clinker另外2人的支持.
  5. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is a view of the other side of the boiler.

    DSC03805.JPG
     
    已获得ax1709cjm, John Petley, Johnme101另外1人的支持.
  6. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more prepping and painting of the frames and the motion has been cleaned but not installed. Work has been done on the piston valves, but no rings fitted yet. The front tender bogie looks complete but is still in front of the tender. Work has been done on the brake brackets.
     
    已获得John Petley, Bluenosejohn, Johnme101另外2人的支持.
  7. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interestingly in the latest issue of MainLine there is to be a "Sir Lamiel" centenary event on June 21st. The frames have been prepped and painted with much of the motion ready to be put back on. The boiler is due to have its tubes fitted soon. Could it be steaming in the Summer?
     
    已获得Johnme101The Gricing Owl的支持.
  8. JR4489

    JR4489 New Member

    注册日期:
    2022-09-02
    帖子:
    29
    支持:
    71
    性别:
    所在地:
    Cambs
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very unlikely, unfortunately. The boiler needs to have 2 rows of roof stays replaced, which requires the removal of 2 sections of boiler plate to access the stays. The tender needs lifting so that the rear bogie can be taken out and overhauled. See latest update here:
    https://www.sirlamiel.org.uk/2024/12/02/october-2024/

    Current estimate for a return to service (according to the latest 5305LA newsletter) is spring 2026.
     
    已获得Bluenosejohn的支持.
  9. The Gricing Owl

    The Gricing Owl Well-Known Member

    注册日期:
    2023-09-29
    帖子:
    1,044
    支持:
    1,975
    性别:
    职业:
    Owl and SR steam gricer
    所在地:
    Near steam Man of Kent and Golden Arrow route
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To emerge as 30777? :):):):):)

    Bryan B
     
  10. The Green Howards

    The Green Howards Nat Pres stalwart

    注册日期:
    2016-02-20
    帖子:
    15,111
    支持:
    8,635
    职业:
    Layabout
    所在地:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not sure it could come out as anything else if it's going to be in BR Green? I mean, if it was in Malachite it could carry either a SR or BR identity...
     
    已获得mike1522The Gricing Owl的支持.
  11. Swan Age

    Swan Age Member

    注册日期:
    2005-09-08
    帖子:
    953
    支持:
    276
    性别:
    所在地:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting that they have to cut open the boiler again, to replace the crown stays. It seems a drastic measure.

    Is the boiler of fundamentally different design to those others remaining in preservation fitted to the S15's both Urie and Maunsell types.

    Im sure that when the Urie group did a comprehensive rebuild of 506's boiler at Ropley they managed to replace the crown stays from inside the boiler barrel using a fabricated tool to get access to them. It wasn't easy mind from what I remember from the report by the guys that did it.
     
  12. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,734
    支持:
    11,853
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I seem to recall the same was done with 825’s boiler when the front sling stays were done. The alternative is to gut the boiler. It’s not a big job to cut a couple of access holes and then replace them.
     
    已获得Swan Age的支持.
  13. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed but has had more work done in preparation for the tubes to be fitted. It now looks smarter with the firebox painted as well.
    DSC04190.JPG
     
  14. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,842
    支持:
    1,644
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Arevthose the 'crinolines' for the cladding ? not much room for insulation is there....
     

分享此页面