If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Discuție în 'Steam Traction' creată de class8mikado, 13 Sep 2013.

  1. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Înscris:
    1 Oct 2023
    Mesaje:
    183
    Aprecieri primite:
    153
    Sex:
    Masculin
    Locație:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only over 4 months since the last ‘monthly’ newsletter. Only news is a belated admission of yet more delays to the new boiler (originally due in 2020) and trackwork at DLW.

    Given that there was only a two paragraph update on engineering progress on No. 2007 in the last (very thin) TCC in December this project has now clearly ground to a halt.
     
    Gareth apreciază asta.
  2. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.842
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To be fair they have had their hand full trying to get a square peg into a now trapezoidal hole on Tornado by all accounts... and of course getting DLW ready fcomplete with donations boxes for the hoards about to descend on it later this year ( one hopes)
    Concerned that is there now anyone on the books capable of progressing, or at least managing the development of ,the valve gear ?
     
    green five și Sheff apreciază asta.
  3. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.111
    Aprecieri primite:
    8.635
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would hope that David Elliott's "brain dump" to whomsoever is charged with that will have worked out and that he will have left copious notes to his successor(s). It's not as though the gear is untried, it's a modification thereof.
     
    Sir Ralph Wedgwood apreciază asta.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.915
    Aprecieri primite:
    5.857
    Does that mean that the A1 Trust's in-house engineering team will work full time on the P2 or that the A1 Trust's in-house engineering team has disappeared?
     
    jumper apreciază asta.
  5. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.837
    Aprecieri primite:
    3.164
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    The latter, is my view, all of those who gave up their time look to have become fed up, and it is being left to full timers to look after her.

    That in no way is derogatory to anyone who has helped in construction or general maintenance.

    It seems to be a recurring theme, with many others under the same sort of agreement.
     
    Last edited by a moderator: 15 Mar 2025
    Sheff apreciază asta.
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.273
    Aprecieri primite:
    12.522
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Theres some rather disconcerting parallels here with another LNER pacific, sorting out an engine after the previous people did not have the skills to get it right,
    It might make sense to have him take on the P2, boiler when the kit of parts finally makes it over to these shores. and possibly have the final assembly done at Riley's when the engine reaches the stage where everything is fitted, then it could use the ELR for test running and shakedown, Of course, it would in effect, be the death blow for any independence of the A1trust, but I would argue, that its already at that point,
     
  7. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.837
    Aprecieri primite:
    3.164
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    All nice in theory, overnight you double the price to finish her, and are we sure the engineering expertise exists to complete the inside motion???
    Given the right set of people brought together assembly is relatively straightforward, lots of pieces are ready, the piece that was damaged, the pony truck cannon box, is awaited to start that.
    The sequence, given to me was, Pony Truck in, Cylinder Block in next, after inside motion operation tested and confirmed, boiler (ready in germany), complete pipework, i know that is simplistic.
    Same goes for the Tender, it is all at DLW, what it requires in the trust to swallow some pride, and get a set of competent volunteers back on side, and work could commence, its an easy win.
     
    The Green Howards și acorb apreciază asta.
  8. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.498
    Aprecieri primite:
    2.857
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Nice to read some sensible information instead of fantasy claptrap from armchair "engineers"....
     
    Spitfire, acorb, RalphW și încă o persoană apreciază asta.
  9. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.062
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That’s not a bad proposition, but take a look at the Lents/Franklin/Elliot valve gear design in more detail. There is no inside valve gear as such. There are two camshafts one driven from rotary motion on either side of the loco. One camshaft actuates the valves on the left hand cylinder and one valve on the inside cylinder. The other camshaft actuates the valves on the right hand cylinder and the other valve on the inside cylinder. So there is no inside motion / gear as such.
     
    guycarr360, The Green Howards și Chris86 apreciază asta.
  10. Eightpot

    Eightpot Resident of Nat Pres Friend

    Înscris:
    10 Aug 2006
    Mesaje:
    8.340
    Aprecieri primite:
    2.506
    Sex:
    Masculin
    Ocupație:
    Engineer Emeritus
    Locație:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sounds like there is plenty of scope for development work (modifications, and with little or no 'in-service' experience) before 2007 is let loose on Network Rail's tracks.....
     
    Sheff apreciază asta.
  11. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.837
    Aprecieri primite:
    3.164
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    Maybe i should have said Inside Cylinder Valve operation????
    That was what they talked about, getting a cam based operation to sync the cylinder operation, using a lever based operation.
    Its only 10 weeks since i was at DLW, memory loss inbound!!!
     
    Sheff apreciază asta.
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.273
    Aprecieri primite:
    12.522
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are there known principles behind this type of set up,?
    I ask because its not a system that is widely used in the UK, and more to the point, is there anyone living, who understands it, how does it vary from Capriotti valve gear as this uses cams to operate the mechanical parts of the valve layout.
     
  13. twr12

    twr12 Well-Known Member

    Înscris:
    2 Sep 2007
    Mesaje:
    1.659
    Aprecieri primite:
    821
    Blimey.
    And some people think Bulleid valve gear is complicated!
     
  14. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.498
    Aprecieri primite:
    2.857
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Are drawings available? I'd be very interested to peruse if so...
     
  15. unslet

    unslet New Member

    Înscris:
    6 Iul 2008
    Mesaje:
    62
    Aprecieri primite:
    107
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Normanton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could we place the above in the P2 thread please folks?
     
    MellishR și osprey apreciază asta.
  16. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.837
    Aprecieri primite:
    3.164
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    Cylinders and valve gear



    The idea to model No. 2007 on Cock o’ the North meant that rotary valve gear was inevitable. Some changes have been made to the proportions of the cylinders to compensate for the increased boiler pressure available from the 250lb/sq in diagram 118A fitted to Tornado. However, the Lentz gear used on the original offered only limited cut-off settings and may have contributed, in part, to No. 2001’s high coal consumption. The Trust looked at British Caprotti valve gear using a derived drive for the centre cylinder; this valve gear was perfected in its application to No. 71000 Duke of Gloucester and offers infinitely variable cut-offs, although the 71000 SLT is still developing and refining the gear. In the end the availability of drawings and technical specification for the Franklin derivative of the Lentz meant it was decided to follow this route, incorporating the improvements made in the U.S.A. into the valve gear.

    Cylinder
     
  17. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.498
    Aprecieri primite:
    2.857
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Thanks but was aware of that. I presume patents have now elapsed, but the Eliot design, which I assume is novel ? ...does that require patent protection ?
     
  18. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.062
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m just this minute back off holiday. I thought the valve gear was well documented on the website? I’ll see what I can find and link it. The nub of the Elliott mods, iirc, were mainly to the steam and exhaust passages to even up the pressure drops and, importantly, to keep the steam and exhaust channels apart to avoid heat transfer from one to the other.
     
    Sir Ralph Wedgwood și The Green Howards apreciază asta.
  19. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.062
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I suggest this page from the P2 website is a good place to start for those not familiar with the new P2’s cylinders and valve gear. Embedded within is an excellent (and now poignant) video by David Elliott where he takes the viewer through the key design changes from the original.

    https://www.a1steam.com/p2monobloc#/

    There’s much more detail here, in the document issued to launch the Valve Gear Club, which I can’t find in the website now, apart from in a very simplified form. Yes I know it’s on Facebook, but hopefully the privacy level is set to Public.

    https://www.a1steam.com/Portals/0/adam/Content/8OEufULbq0uiqvHvsSmkXA/Link/VGC MAR 2024 REV 8pp_WEB.pdf?fbclid=IwZXh0bgNhZW0CMTEAAR3KNnCbxeL7QI1b5eitPhgXRdFDx6imsX1DNEicX2Ar0rAeUFjkPHVYY3g_aem_JEoqhwQEFxX2Ues5MtCTMQ
     
    Last edited by a moderator: 17 Mar 2025
  20. William Fletcher

    William Fletcher Member

    Înscris:
    25 Noi 2016
    Mesaje:
    252
    Aprecieri primite:
    272
    Sex:
    Masculin
    Locație:
    Lincoln
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are several live steam model engineered versions of the P2 with fully working gear, the technology is understoofd by sevral
     

Distribuie pagina asta