If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von The Black Hat gestartet, 13 Februar 2011.

  1. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The NYMR has had to contend with high fire risk periods ever since the first in 1976. It is nothing new so should be a well-seasoned event allowed for in timetabling and should certainly have been incorporated into Levisham signalling by now. For very many years the norm with Firecon 2* status was for diesel assistance between Levisham and Goathland. Why it has not been adopted is beyond me. It obviously adds time but not significant amounts if those involved are up to the job and the section times between the two don't require 25 mph running with a normal T/T. Granted there is a relatively long PWS at the moment which makes it harder.

    * The NYMR has different levels of firecon working with different requirements from Firecon 1 with Maximum care by locomotive crews and no attempt to be made to make up lost time between Goathland – Levisham through to an all diesel T/T which used to be Firecon 4 but it has recently changed and I'm not sure of the current levels.
     
    47216 und Sheff gefällt dies.
  2. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Don't blame the BBC for what's happened.;)
     
    The Green Howards gefällt dies.
  3. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Those on the ground, both in passenger facing roles and operational roles do deserve everyone's thanks and appreciation. I'm only too well aware of what is needed when things go wrong in a big way as happened yesterday, not forgetting the knock on effects into today. I'm not envious of Matt and his team in what they have had to do but I am full of admiration of them.
     
    bluetrain gefällt dies.
  4. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    3.887
    Zustimmungen:
    8.626
    As Tom said, why paid, but also why double manned? If the DSD is operable…?
     
  5. brennan

    brennan Member

    Registriert seit:
    11 September 2016
    Beiträge:
    408
    Zustimmungen:
    448
    Ort:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah well. Least said, soonest mended. I expect the moorland will have recovered in five years time and hopefully the wildlife will have scuttled away before being destroyed. The important thing is that the service ran with a steam engine and passengers didn't have to write harsh things on TripAdvisor.
     
  6. Sidmouth4me

    Sidmouth4me Member

    Registriert seit:
    26 Mai 2011
    Beiträge:
    297
    Zustimmungen:
    369
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Who said they were paid?
     
  7. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    3.887
    Zustimmungen:
    8.626
    Read above.
     
  8. Sidmouth4me

    Sidmouth4me Member

    Registriert seit:
    26 Mai 2011
    Beiträge:
    297
    Zustimmungen:
    369
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Malton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I did, but “who” said they were paid, or was it another assumption?
     
  9. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Registriert seit:
    12 September 2005
    Beiträge:
    10.146
    Zustimmungen:
    9.775
    Geschlecht:
    männlich
    Ort:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thinking back to the the Great Yorkshire Steam Railway , whilst I appreciate made for TV there is a level of manufactured near crisis to be saved at the last minute, those involved at times came across almost as Perry/croft comedy characters . Hearts in the right place but came across to this viewer as a bumbling along if that makes sense

    reading the above decision making process about weather to run steam I can mentally picture the narrator saying (and just for absolute clarity what follows is total fiction) .... " with diesels running advanced bookings are lower and the railway faces a big financial loss which could break the railway. The pressure is on to bring back steam but the few drops of rain that have fallen haven't dampened the fire risk" . The affable GM turns to camera and with a smile "I'm told the spark arresting gear has been checked and is fully functioning so we are going to give the public what they want and run steam . I mean what could go wrong?"

    With a full train of happy passengers and the railways top driver - Full regulator and large cut off jimbo , at controls our engine blasts out of Pickering . meanwhile the soon to be melted smokebox cam shows a spark arresting screen is lose . "will this mean disaster - tune in next week to find out"
     
    Jamessquared, YorkyLad, echap und 7 anderen gefällt dies.
  10. Enterprise

    Enterprise Part of the furniture

    Registriert seit:
    9 September 2005
    Beiträge:
    5.472
    Zustimmungen:
    3.302
    It depends on the severity of the fire but unfortunately your first expectation is likely to remain unfulfilled. It will probably take decades. Secondly, I suspect that you were thinking of larger mammalian wildlife when you wrote "scuttling away". Those such as deer, hares etc might well escape, smaller such as mice or shrews probably will not. However, far more important in ecological terms are smaller creatures such as arthropods, for example ants, spiders and woodlice etc.. They will, of course, mostly die. The plants and fungi are also wildlife and essential components of a mature ecosystem; they cannot move!
     
    ChuffChuff und The Green Howards gefällt dies.
  11. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This area of Newtondale has been on fire several times over the years and I'm always amazed how quickly the black disappears and is replaced with greenery and, even by the year end, the casual visitor would not realise there had been a fire.. That's not to say the wildlife will have survived, I admit.
     
  12. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    3.887
    Zustimmungen:
    8.626
    I actually quoted the post to start with????!!!??? It was D7076. Whether they are right or not I don’t know, that was my question.
     
  13. brennan

    brennan Member

    Registriert seit:
    11 September 2016
    Beiträge:
    408
    Zustimmungen:
    448
    Ort:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well they could have firecon 23.5 but clearly the system has failed.
     
    Sheff gefällt dies.
  14. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You jest but I suspect you are probably near the truth with your scenario. The railway needs a huge daily income just to stand still. Based on last years published accounts, every day they are running they need to take £14,000+ just to pay the wages bill, never mind anything else. That has got to colour judgement.
     
    Last edited: 21 April 2025 um 13:53
  15. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    5.969
    Zustimmungen:
    2.761
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think I am right in saying Chris Price used to say he needed 20p a second income to cover all operating costs.
     
  16. Enterprise

    Enterprise Part of the furniture

    Registriert seit:
    9 September 2005
    Beiträge:
    5.472
    Zustimmungen:
    3.302
    I know, but the ecosystem has not recovered. A new, but less complex system, has replaced it. It takes many years for a long-established heathland to be restored after a fire.
     
    Kje7812, Greenway und Sheff gefällt dies.
  17. twr12

    twr12 Well-Known Member

    Registriert seit:
    2 September 2007
    Beiträge:
    1.658
    Zustimmungen:
    820
    So £2.8M salary costs. Based on £14,000 x 202 days of operation.

    In isolation, willy waving a number around does not show how much of a proportion of turnover, the salary costs are.

    Is there a rule of thumb for maximum proportion of turnover used for salary costs, that heritage railways use? E.g. less than 40% good, more than 40% bad.
     
  18. 60044

    60044 Member

    Registriert seit:
    24 Februar 2016
    Beiträge:
    780
    Zustimmungen:
    1.207
    Geschlecht:
    männlich
    Ort:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can I ask what your scientific credentials are for making this statement? Have you been involved with a ecological survey of this area? Or are you making a broad-brush statement? This is not an area, for example, rich in sand lizard species , for example, which seem to be the hardest hit in heathland fires in the south of England. Typically, I think (could be wrong!) heathland species are accustomed to periodic outbreaks of fire and have developed survival mechanisms for such; the worst types of fire are those where the heath contains areas of peat bog where fauna that have burrowed in the the ground to survive are exposed to deeper pockets of fire - I do not think that the area in question is likely to contain such peat deposits.
     
  19. Enterprise

    Enterprise Part of the furniture

    Registriert seit:
    9 September 2005
    Beiträge:
    5.472
    Zustimmungen:
    3.302
    30 years teaching science. I know that Newton Dale is a very varied habitat from walking in the area over the years and reading about it. There are areas of bog, but I don't know the perimeter of the fire damaged area and whether they were affected. My comment about recovery time is a broad brush statement insofar as that most people greatly underestimate the time for a long-established ecosystem to recover from fire. I doubt the dale caught alight very often before the railway and comparatively recent climate changes. AFAIK the only detailed scientific paper on fire damage on the NY Moors relates to Rosedale Moor in 1976. This is a somewhat different habitat.
     
  20. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.729
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Actually, I got the figures wrong when I looked them up. The actual staff costs were £3,945,664 inc. pensions, etc. and based on 187 days of operation, as per the WTT, that works out at about £21,000/day or, with 6 trains each way/day, £3,500/return train. In terms of proportion of turnover its 41%. Ten years ago it was suggested by Paul Lewin that a benchmark for staff costs of heritage railways should be about 25% of turnover but I think this is probably a bit low today. The FfR's figure excluding donations was 29% for the last reported year.
     
    60044 und Sheff gefällt dies.