    Yes, I agree money is the root of all evil, so they say, and to be honest, I think Conqueror will fill the gap nicely that has been left by Zillar. I don't think that we have seen the last of the moves from Collection X yet
     
    andrewshimmin se sviđa ovo.
  2. 242A1

    242A1 Well-Known Member

    Pridružen(a):
    3. Prosinac 2006.
    Poruka:
    1,562
    Lajkova:
    1,309
    Love of money is the problem. Money is a useful tool though it is sadly too prone to abuse.
     
    andrewshimmin, huochemi, ragl i 2 ostalih se sviđa ovo.
  3. 60044

    60044 Member

    Pridružen(a):
    24. Veljača 2016.
    Poruka:
    857
    Lajkova:
    1,264
    Spol:
    Muškarac
    Grad:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure where "love of money" comes into this? Perhaps you meant "lack of money"?? On the face of it "Conqueror" looks to be a good acquisition for the W&L - a suitable size if it is ever needed to replace one of the existing fleet, but a nice to have museum exhibit till then. It just needs a museum to house it, along with other current and potential exhibits. Is there an Indian 0-6-2 tender engine in "Collection X" that could join it?
     
  4. tony51

    tony51 New Member

    Pridružen(a):
    17. Rujan 2010.
    Poruka:
    162
    Lajkova:
    366
    Absolutely, and as well as money and workshop capacity, volunteer numbers are the other limiting factor. Anyone wishing to help with any of this would I'm sure be very welcome, and maybe we'll see Countess, 85, Joan and even Conqueror back in action.
     
  5. tony51

    tony51 New Member

    Pridružen(a):
    17. Rujan 2010.
    Poruka:
    162
    Lajkova:
    366
    There seem to be 3 Indian 2'6 locos in the collection, the tender engine is a North British 4-6-0, there are also a Bagnall 2-6-2T and a Kerr Stuart 0-6-4T. As far as I know, none have yet been seen in public.
     
    MuzTrem se sviđa ovo.
  6. I. Cooper

    I. Cooper Member

    Pridružen(a):
    5. Veljača 2011.
    Poruka:
    594
    Lajkova:
    757
    Grad:
    Salop
    Although basic, the storage shed at Welshpool with its display and interpretation panels already seems to be a pretty effective way of displaying out of service equipment - and gives something to do during the short turn-around time.
     
  7. fergusmacg

    fergusmacg Resident of Nat Pres

    Pridružen(a):
    17. Kolovoz 2008.
    Poruka:
    6,784
    Lajkova:
    4,160
    Interesi:
    Design Engineer
    Grad:
    Cumbria
    The tender engine is actually a 4-6-2 No 666 and not a 4-6-0 - it's a CC class loco as shown on the link below of one of is sisters . . .

    https://www.flickr.com/photos/124446949@N06/35890012560
     
    andrewshimmin, 21B i tony51 se sviđa ovo.
  8. lynbarn

    lynbarn Well-Known Member

    Pridružen(a):
    22. Kolovoz 2006.
    Poruka:
    1,676
    Lajkova:
    596
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I feel there is going to be a need for a grant from the National Lottery Heritage Fund, with a maximum of £ 10 million per project
     
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    28,017
    Lajkova:
    65,574
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Do you ever propose narrow gauge projects that come with a less than £10m price tag? :)

    Tom
     
    Last edited: 2. Svibanj 2025.
  10. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,340
    Lajkova:
    5,850
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Most of that will be used up with multiple business plans, strategy plans, professional fundraisers and creating multiple companies to do every sub-task. :Facepalm:
     
    Jamessquared and Steve like this.
  11. 60044

    60044 Member

    Pridružen(a):
    24. Veljača 2016.
    Poruka:
    857
    Lajkova:
    1,264
    Spol:
    Muškarac
    Grad:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely no use whatsoever at the W&L, but would make a lovely museum piece there! Shame there are no Bagnall 0-6-2 tender engines, though - one of those might be an interesting potential runner!
     
    andrewshimmin se sviđa ovo.
  12. lynbarn

    lynbarn Well-Known Member

    Pridružen(a):
    22. Kolovoz 2006.
    Poruka:
    1,676
    Lajkova:
    596
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, not really. I was told by those who know, that you should always apply for more, as it is far harder to make up the balance if you don't have enough in the first place, and you certainly don't want to get halfway through a project only to fine that you have run out of money.
     
  13. 21B

    21B Part of the furniture

    Pridružen(a):
    2. Rujan 2009.
    Poruka:
    4,045
    Lajkova:
    9,144
    Yes, but not 10x of the cost:). The grants have to pass a value for money test, so there is always a balance to strike. Go too big and you might find you get nothing.
     
    35B, Jamessquared i ghost se sviđa ovo.
  14. Tintagel

    Tintagel New Member

    Pridružen(a):
    5. Veljača 2022.
    Poruka:
    37
    Lajkova:
    53
    Spol:
    Muškarac
    Grad:
    UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Kerr Stuart is one of these
    https://www.flickr.com/photos/124446949@N06/41845776820

    I'd hate to think what the condition is like though. Conqueror looks well suited to working up Golfa bank, that Indian Pacific looks completely unsuitable given the long boiler.
     
    andrewshimmin se sviđa ovo.
  15. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,164
    Lajkova:
    29,583
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not to mention that the quality of the estimates will be used as a guide to the quality of the rest of the application.
     
    Jamessquared and ghost like this.
  16. 60044

    60044 Member

    Pridružen(a):
    24. Veljača 2016.
    Poruka:
    857
    Lajkova:
    1,264
    Spol:
    Muškarac
    Grad:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Last time I wrote an HLF application, I think that the unofficial guidance was to allow cac205 contingency figure in the budget. I think any more than that would be regarded as excessive.
     
  17. lynbarn

    lynbarn Well-Known Member

    Pridružen(a):
    22. Kolovoz 2006.
    Poruka:
    1,676
    Lajkova:
    596
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would agree, however, besides the loco restoration costs, others have mentioned a new workshop and everything that goes with that, so as I see it, we are not just talking about the restoration of one loco but the building of an additional workshop and covered accommodation to carry the work out under cover, we should also not forget that may be we should consider the employment of a couple of steam engineers to not only work on Conqueror to get her back in to steam ASAP. Then, once that has been done, overhaul one or two of the other locos. I see this as more of a package of wants and needs to be put together, it is a bit like the old Hole in My Bucket Song, you can't do one thing without something else being in place first of all.
     
  18. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,164
    Lajkova:
    29,583
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suggest going back to basic project and programme planning ideas.

    A list of what needs to happen needs to be pulled together, and the projects required to make those things happen defined. Then, and only then, it will be possible to estimate what that package will cost - and hence what money needs to be raised to pay for it all.

    Depending on the circumstances, it may be better to run them as separate projects, each a bit at a time, or it may be better to try to do them as a single programme of work. The precise order will depend on how the different bits fit together.

    During that planning process, there needs to be rigorous analysis of what are "essential" and what are "nice to have" items; once that plan is set, great care needs to be taken to avoid new stuff added to the scope on a "wouldn't it be nice if..." basis.

    All of the above is completely separate from considering contingency, which is the amount of money that is allowed in a budget for when the things that are in scope come out more expensive than first thought - not as a slush fund for other activities.

    Having reviewed a number of funding submissions in my time, it is really easy to tell the difference between the projects where someone's thought things through, and those which are just a dumping ground for a wishlist. As a grant giver, I will almost always have too little money to go between too many applications; if something is a wishlist, it will be rejected more or less on sight.
     
    lynbarn se sviđa ovo.
  19. tony51

    tony51 New Member

    Pridružen(a):
    17. Rujan 2010.
    Poruka:
    162
    Lajkova:
    366
    This thread seems to be taking place in a parallel universe. Back in reality, there are two working steam locos available for the next two years. Hopefully the fundraising for Countess is successful (contributions welcome!) and she can return as planned for her 125th birthday in 2027. This is estimated at £150,000 and according to the April journal the current total raised is £83,200.

    Last year the railway received the second biggest grant in its history. This was £300,000 and is being used to fix the roof and repair water damage of existing buildings used as museums and storage, not very glamorous but necessary. Suggestions that there might be a handy £10 million available from somewhere to build an imaginary museum to house someone else’s unsuitable locos really doesn’t help anyone.
     
    acorb, andrewshimmin, ragl i 12 ostalih se sviđa ovo.
  20. pmh_74

    pmh_74 Part of the furniture

    Pridružen(a):
    28. Siječanj 2009.
    Poruka:
    2,443
    Lajkova:
    1,749
    It's utterly fanciful. Now, £10M to restore the town section, on the other hand, I could get behind!
     