If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Lynton and Barnstaple - Operations and Development

Тема в разделе 'Narrow Gauge Railways', создана пользователем 50044 Exeter, 25 дек 2009.

  1. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.603
    Симпатии:
    559
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My understanding is that tourist sites need to be attracting a certain level of visitors before the local council is permitted to install a brown sign. I am sure that either Toobes or 35B will come up with the answer for you.

    As for general signage, again, that will be down to a planning application, and then I think it will only allow up to a certain size
     
    Jdwitts нравится это.
  2. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    4.038
    Симпатии:
    7.892
    Пол:
    Мужской
    Адрес:
    West Country
    During the Phase 2A signalling design stage there was much discussion about the need - or not - for a passing-loop at PE. A draft 'business case' based on projected traffic levels etc suggested that its only real need would be for Galas and occasional 'high days' - at best about 15% of the time. It would be 'switched out' most of the time, not least 'cos of problems with staffing levels, yet would still require regular maintenance. Personally, I never really saw any convincing need for it.

    The original concept, to be honest, was IMHO just a 'nice to have' idea from a group of people which then took on a life of its own and became a 'private project' without any Board control (meaning no disrespect to those who did a nice job on preparing the equipment). I was told later that subsequent surveys identified the potential need for extensive - and expensive - excavation and buttressing work on the Up side, coupled with other issues about passenger access etc.

    I would suggest therefore that, to all intents and purposes, what you will see at any future PE station will be little more than the running line and a platform, although perhaps with some improved provisions for passenger comfort and shelter. There might be - if space permitted - a short dead-end siding (worked by a small GF) on the up side, provided on the basis of being a 'nice to have' place to (say) shunt an engineering train out of the way or put off a defective wagon etc. But that would be it - at least, in my view...:)

    Others may have different views, of course :)
     
    The Dainton Banker и lynbarn нравится это.
  3. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.603
    Симпатии:
    559
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
     
    MellishR нравится это.
  4. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.611
    Симпатии:
    3.979
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, Andy. Its good to have that exactly located. It does seem strange though, given the large amounts of work undertaken on that stretch, ie rebuilding bridges 54& 55, plus all that clearance undertaken down to 53, that fencing wasn't done at the time, although like you say, I'd be very surprised if the cutting hadn't been fenced at least.
    I saw that Anne Belsey mentioned on Exmoor NG that the fence posts have been at WB for some considerable time, now. (Insert Oliver Hardy exasperated look).
     
    Biermeister нравится это.
  5. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.603
    Симпатии:
    559
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer

    If I have my maths correct, the running time between Blackmoor and Woody Bay will be about 12 minutes at 20 mph, so why install a passing loop? That said, of course, as Railwest has suggested, having somewhere to place a wagon or something could be useful.

    Over in France, there are a couple of heritage lines that have such a spur, and when the line is operating, they shut a van or two into it on the first train of the day to act as the facilities and then on the last train they pick them up and take them back to the depot to be cleaned and made ready for the next time they are needed.
     
  6. DaveE

    DaveE Member

    Дата регистрации:
    23 мар 2023
    Сообщения:
    572
    Симпатии:
    1.206
    Пол:
    Мужской
    Адрес:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An application has to be made to Highways England for tourist signs on A roads managed by them, which I should imagine the A39 and A399 are.

    Cost is on the owner of the attraction/museum/monument ......currently quoted on the govt website as maybe between £8,000 and £20,000 per single A road sign depending on design, location and possible future maintenance which is done by Highways England once the sign is installed, and rising to £17,000 to £40,000 for a motorway sign.

    https://www.gov.uk/guidance/apply-for-brown-tourist-signs-on-roads-the-highways-agency-manage
     
    Paul42, Jdwitts и lynbarn нравится это.
  7. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.432
    Симпатии:
    1.731
    I'm not belittling the locals' concerns about the poor road access at Parracombe, but based on a sample of one family visiting the area (mine), we made a point of driving into Parracombe to look for the station precisely because it is closed. We didn't find it, and gave up, but that's beside the point. Had the station been open, we'd have gone there by train, and that would have been one *less* car in the village that day.
     
    MellishR нравится это.
  8. 62440

    62440 New Member

    Дата регистрации:
    16 июн 2020
    Сообщения:
    158
    Симпатии:
    372
    Адрес:
    4A
    Heritage Railway Volunteer:
    No I do not currently volunteer

    “We hold these truths to be self evident”, errr, to coin a phrase.
     
    Biermeister и The Dainton Banker нравится это.
  9. ikcdab

    ikcdab Member Friend

    Дата регистрации:
    12 дек 2006
    Сообщения:
    701
    Симпатии:
    2.079
    Пол:
    Мужской
    Род занятий:
    WSRHT Trustee, Journal editor
    Адрес:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ok, then we need to demolish OSHI pub and rebuild it eisewhere on the site. We really MUST rebuild the L&B, not just rebuild a new tourist attaraction that happens to follow (in part) the old alignment but deviates at the slightest sign of difficulty....
     
    lynbarn нравится это.
  10. ikcdab

    ikcdab Member Friend

    Дата регистрации:
    12 дек 2006
    Сообщения:
    701
    Симпатии:
    2.079
    Пол:
    Мужской
    Род занятий:
    WSRHT Trustee, Journal editor
    Адрес:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    no, we should not go down that road.....we are rebuiding the heritage line....
     
    Axe +1 нравится это.
  11. ghost

    ghost Part of the furniture

    Дата регистрации:
    29 май 2006
    Сообщения:
    4.323
    Симпатии:
    5.782
    Пол:
    Мужской
    Адрес:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I refer you to the quote in Martyn's post here
    People need to be much more careful about what they say online as it can (and in this case has) been used against the railway.

    Calling someone a nimby is not conducive to good community relations.
     
    Mark Thompson, Paul42, Fish Plate и 3 другим нравится это.
  12. Meatman

    Meatman Member

    Дата регистрации:
    10 апр 2018
    Сообщения:
    714
    Симпатии:
    1.709
    Пол:
    Мужской
    Адрес:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We would also need to demolish a significant part of the newish house that was built by the previous owners as part of that sits on the original alignment too
     
    lynbarn нравится это.
  13. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    4.038
    Симпатии:
    7.892
    Пол:
    Мужской
    Адрес:
    West Country
    There was a suggestion - which, of course, could still be implemented - that exactly that sort of thing could be done at Wistlandpound. A van, designed to incorporate toilets etc - could be taken Up to WD on the first train of the day, left there, and then taken back to WB on the last Down train.

    As an aside...it is quite common on heritage railways that have a very simple, basic 'country' terminus (eg Mendip Vale on the ESR) of little more than a platform and run-round loop, to find the odd siding or two off the loop. Usually used as somewhere to store unwanted/unloved stock (often euphamistically described as 'awaiting restoration') out of the way and sight of more public areas. It also provides a 'cripple siding' facility in the event of a needing to detached a failed coach before the return journey.

    In the case of WD, I understand that the Board did not want any sort of 'extra storage' there precisely to avoid the possibility of it ending up as a home for rake of rusting ruins that would blight the locality. There was also the fear that its relatively remote and unsupervised location could attract vandalism or other unwanted attention. However the need for some sort of cripple facility was recognised so, to avoid the expense of having to provide an extra point simply to serve a siding that might only be accessed once or twice a year, and also avoid the need to widen the trackbed further to accommodate it, I proposed simply to extend the length of the dead-end spur further towards BF. The engine running-round its train would use the first part of the spur, the second (dead-end) part being reserved for any cripple, the two being separated by a simply padlocked wheel-stop.

    Maybe one day I shall be able to get the plans out and dust them off again ? :)
     
    MellishR и lynbarn нравится это.
  14. Isambard!

    Isambard! New Member

    Дата регистрации:
    16 май 2023
    Сообщения:
    110
    Симпатии:
    386
    Пол:
    Мужской
    Адрес:
    Wilds of Hatley
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That depends on whether or not a viable operation is the end game.

    Sent from my SM-T575 using Tapatalk
     
    lynbarn нравится это.
  15. brmp201

    brmp201 Member

    Дата регистрации:
    18 май 2010
    Сообщения:
    616
    Симпатии:
    965
    Пол:
    Мужской
    Род занятий:
    IT Director
    Адрес:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And we already have planning permission for Blackmoor, based on what exists today.

    Let's see what is presented at the AGM.
     
    lynbarn нравится это.
  16. DaveE

    DaveE Member

    Дата регистрации:
    23 мар 2023
    Сообщения:
    572
    Симпатии:
    1.206
    Пол:
    Мужской
    Адрес:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Already been thought on and a design, self contained water storage and waste, based on a V23 underframe which we now have the drawings for. 2 unisex loos, one which should meet the disabled access criteria if level access can be obtained.
    Also, small coffee/tea wagon.
    And a classroom carriage for schools.....
     
    Paul42, Isambard! и gwralatea нравится это.
  17. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.603
    Симпатии:
    559
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, Dave, for bringing me up to date on this.
     
  18. gwralatea

    gwralatea Member

    Дата регистрации:
    31 дек 2014
    Сообщения:
    548
    Симпатии:
    1.093
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well quite - I think what you’ve put forward is *viable*, a complete heritage approach is *viable*.

    So it come down to who supports what rather than ‘that obviously won’t work’.

    Which is, again, part of the difficulty. There’s no obvious only way forward so everyone has been too free for too long to push their own pet preference.

    Time to get a grip. Slowly, and carefully. If that means people walk away because they’ve finally been told what they want isn’t happening so be it (whatever the decision is) but we can’t indulge competing visions anymore in my view.
     
    Biermeister, MellishR, The Dainton Banker и 5 другим нравится это.
  19. Paul42

    Paul42 Part of the furniture

    Дата регистрации:
    17 июл 2006
    Сообщения:
    6.107
    Симпатии:
    4.502
    Пол:
    Мужской
    Адрес:
    East Grinstead
    When the Bluebell extended to East Grinstead they paid for the brown signs that were installed around the town.
     
  20. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.603
    Симпатии:
    559
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer

    I do get your point of view, and maybe it is time for everyone to look at what the objects of the trust have been all along. The other issue is, of course, if you say to people who are doing all the work that their dream is not going to fly, and they walk away from this. Then, who is going to make it happen? A bunch of armchair enthusiasts?

    As I see it, we need to come together, and we should be able to be a broad church in achieving the long-term aims. Those of us who have been here from the very beginning have one view, while others who have only joined in say the last ten years or so will have a different view.

    Everyone must obtain a basic understanding of the history of the railway, but once you understand that, you then need to read this https://www.railwaysarchive.co.uk/documents/MoT_Requirements1950.pdf
    To understand just how a modern-day heritage railway is built and run.

    As I see it, before we even start, there is a major difference between what was and what can be; there is a certain amount of compromise on all sides that needs to be accepted, and that is without any external interference from subsequent government regulations

    I would argue as well that this has only happened due to weak or unfocused leadership
     
    MellishR нравится это.

Поделиться этой страницей