If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

82045 The way ahead?

Discuție în 'Steam Traction' creată de Kinghambranch, 24 Mai 2008.

  1. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
    Chairman's Chat #12. Boiler Announcement : http://www.82045.org.uk/news/82045_news-feb25-chairmanschat.html
     
    Kinghambranch, John Petley, ragl și alți 15 apreciază asta.
  2. DismalChips

    DismalChips Member

    Înscris:
    11 Apr 2016
    Mesaje:
    690
    Aprecieri primite:
    720
    Locație:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I thought it seemed early in the month for an 82045 update. Well done everyone involved, this has been the model of steady but sure progress.
     
    acorb apreciază asta.
  3. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.871
    Aprecieri primite:
    2.105
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If water is in the boiler, how far is that through the build of the boiler?

    I assume that the main components (ie firebox, barrel, tubeplates and tubes) must be in. Ditto anything making the water part water-tight (so wash-out plugs, and plugs for any fittings not, err, fitted etc)

    Given taking apart boilers uneccessarily is frowned-upon, does this mean the regulator is done? Safety-valves? Fittings on the backhead?

    I assume lagging and cladding is more of a "bodywork job" than a boiler job?

    From a corrosion point of view, once it's been wet, is supposed to stay full of water (to limit oxidisation), or is that not considered a risk?

    Whatever the answers, it's a great step and congratulations to the team.
     
  4. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
    Soo many questions @ Bikermike! I honestly can't answer them all, but for most the answer is a resounding YES.
    The last sentence is received with humble thank's. Many hours of blood, sweat and tears, financial donations from members and supporters and suppport from the SVR, volunteers and the lads in the Boiler Shop. That a Standard Boiler sees the light of day after such a lengthy hiatus is surely something the preservation movement as a whole should be very proud of.
     
    Mick45305, hyboy, Bikermike și alți 3 apreciază asta.
  5. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.089
    Aprecieri primite:
    5.401
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It will be the boiler shell without ancillaries. All pads for such things as safety valves, clacks, superheater header, regulator valve, etc. will need to be blanked off for the hydraulic test. These will all be hydraulically tested separately and individually, as will the superheater elements, main steam pipes and all other steam pipework..
     
    gios apreciază asta.
  6. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.871
    Aprecieri primite:
    2.105
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks,
    It's like a lot of these things, anything short of the final engine is always a line in the sand somewhere, and I am simply curious as to what counts as "boiler".

    "Finished" is of course an entirely other kettle of badgers and one that keeps wig-jockeys gainfully employed...
     
  7. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.048
    Aprecieri primite:
    6.463
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very well done the SVR and 82045 teams.
     
    minty4371, Hawkeye28 și gios apreciază asta.
  8. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
  9. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.871
    Aprecieri primite:
    2.105
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good stuff!
    (I guess this answers the question about whether the boiler will be emptied or not, can't imagine machining it full of water on temporary probs would be less than ideal).
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    28.077
    Aprecieri primite:
    65.775
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You can’t machine the pads while it is full of water. (Though if you temporarily forget that statement, removing the blanking plates to enable machining will quickly rectify the situation for you …)

    Tom
     
    gios, Bikermike, Steve și alți 7 apreciază asta.
  11. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.838
    Aprecieri primite:
    12.050
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Deleted.
     
  12. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
  13. W.Williams

    W.Williams Well-Known Member

    Înscris:
    20 Dec 2015
    Mesaje:
    1.660
    Aprecieri primite:
    1.579
    Ocupație:
    Mechanical Engineer
    Locație:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This farily making progress! Well done to all involved!
     
    gios apreciază asta.
  14. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
  15. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
    Just a heads up to all 82045s. May update will be posted a little later as our hard working Webmaster is on a well deserved holiday. Hang on members and supporters, copy is already submitted;).
     
    Last edited: 30 Mai 2025
    ghost, Martyn Harrison, John Petley și alți 6 apreciază asta.
  16. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
    Last edited: 1 Iun 2025
    Johnme101, Kinghambranch, John Petley și alți 8 apreciază asta.
  17. minty4371

    minty4371 New Member

    Înscris:
    3 Aug 2009
    Mesaje:
    144
    Aprecieri primite:
    40
    Sex:
    Masculin
    Ocupație:
    Unemployed
    Locație:
    Sutton Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well done to all for the news in May.
    Enjoy the Greatest Gathering. I am NOT attending. My brother is attending only on the Saturday.
     
    gios apreciază asta.
  18. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.871
    Aprecieri primite:
    2.105
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Excellent news!
     
    acorb și gios apreciază asta.
  19. gios

    gios Member

    Înscris:
    20 Apr 2012
    Mesaje:
    350
    Aprecieri primite:
    1.317
  20. W.Williams

    W.Williams Well-Known Member

    Înscris:
    20 Dec 2015
    Mesaje:
    1.660
    Aprecieri primite:
    1.579
    Ocupație:
    Mechanical Engineer
    Locație:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A huge milestone that truly marks a crossing of the rubicon for the project. Credit to all involved.
     
    Sheff, minty4371 și gios apreciază asta.

Distribuie pagina asta