Bridge that Gap: Great Central Railway News

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Gav106, بتاريخ ‏8 ماي 2010.

  1. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,891
    عدد المعجبين:
    2,113
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I said above
    "A lot of it is down to commercial positions, but I've yet to see the paying party do better..."
    In that circumstance, why would a cost-plus contract be any better for the Employer?
     
  2. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    29,397
    عدد المعجبين:
    29,927
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the choice is fixed price vs. cost plus, then I agree. But other models exist as well - in the IT world, time and materials is common.

    I'm far from convinced that, where information is incomplete, fixed price does get the best value as too much risk needs to be added in - and where it isn't, it comes through as the contractor's inability to deliver.
     
    Gladiator 5076 و Paul42 معجبون بهذا.
  3. mikechant

    mikechant Member

    إنضم إلينا في:
    ‏24 اكتوبر 2012
    المشاركات:
    237
    عدد المعجبين:
    255

    Fortunately for the GCR the fire was on the side of the building furthest away from the railway. I hope no airborne burning debris landed on the rolling stock in the sidings.
     
  4. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,459
    عدد المعجبين:
    1,761
    Sad about the Shepshed Lace factory, a prominent backdrop to the railway from the Great Central Road bridge. There's online speculation someone wants the site for housing... probably best not to discuss beyond that one-liner here. I hope the facade survives at least.

    Going back to the 'gap' and drawing parallels, most of the big projects I've worked on have been on time and on budget. The only slight complication is that the programmes and budgets keep shifting as the projects go along...
     
    أعجب بهذه المشاركة Kempenfelt 82e
  5. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,891
    عدد المعجبين:
    2,113
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm fully aware of different models, and in lots of years of doing this lark, I've come accross precisely one client who was prepared to invest properly in anything other than fixed price. Incomplete information is a sign you shouldn't be building it.
    Anyway, let's hope the GCR get it built.
     
  6. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,891
    عدد المعجبين:
    2,113
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's not automatically a bad thing, any well-organised project should have contingency, it's when it's uncontrolled that it's an issue.
     
  7. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    29,397
    عدد المعجبين:
    29,927
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. Civils seems a lot more mature in this regard than IT...
     
    أعجب بهذه المشاركة Bikermike
  8. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,891
    عدد المعجبين:
    2,113
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We have plenty of our own ways to foul it up, and we share a belief that cheaper is always better and wonder why it doesn't work...
     
    Hirn و 35B معجبون بهذا.
  9. NBDR Lock

    NBDR Lock New Member

    إنضم إلينا في:
    ‏18 جوان 2012
    المشاركات:
    154
    عدد المعجبين:
    128
    Could this provide an opportunity to acquire sufficient land for a new shed?

    Too expensive I would imagine! Plus, providing rail access really problematic.

    Think I've just answered my own question. :(
     