If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Discuție în 'Steam Traction' creată de class8mikado, 13 Sep 2013.

  1. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.894
    Aprecieri primite:
    1.673
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, but the fact that they have been successful at doing just that is actually something to celebrate ?
    Without that we would'nt have an A1 and most of a P2 for us to bitch about the (mis?) handling of now would we.
     
    MellishR apreciază asta.
  2. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.174
    Aprecieri primite:
    3.278
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just read this, where does it say it’s the ‘2nd boiler’? My source stated that the 2nd boiler is irreparably distorted, and that the 3rd boiler had faults that had to be addressed before it could be shipped to the UK for finishing …… these included the foundation ring corners - which corresponds with the MM article.

    Out of interest, they make a point of stating that the corners going in were ‘forged’. This was a change made to Tornado’s firebox many years ago to address the cracking problem with the machined originals. So was the new ‘box somehow constructed with the old style corners? If so, why wasn’t this picked up by the Trust’s QA process?
     
    John Merry, Sir Ralph Wedgwood și Johnb apreciază asta.
  3. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.894
    Aprecieri primite:
    1.673
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wondering if the water spaces have actually been increased as per the originally proposed Meiningen version of the
    design and they have been working to that design ( with its continental foibles) rather than a Tornado boiler redesign ( with its UK Peculiarities)?
     
  4. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    But I thought that reading posts on this forum that the third boiler was a kit of parts ? Apologies if I've misread things.
     
    Sir Ralph Wedgwood apreciază asta.
  5. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.174
    Aprecieri primite:
    3.278
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It seems it has progressed from that state now, but as someone said above, the proof of the pudding will be two complete and compliant boilers sat in Darlington. I'm afraid as far as I'm concerned the Trust have lost all credibility until proven otherwise.
     
    Last edited by a moderator: 2 Aug 2025
    MellishR, John Merry, Johnb și încă o persoană apreciază asta.
  6. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Thanks...as you rightly point out.. until "sat at Darlington" is the word. I'm still open minded.... I just want to see a P2 in the flesh before I go to landfill...a dream come true...
     
    Sheff, John Merry și Sir Ralph Wedgwood apreciază asta.
  7. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    I hasten to add ...not a dream going to landfill....just to see a P2...
     
    MellishR, Sheff, John Merry și încă o persoană apreciază asta.
  8. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.688
    Aprecieri primite:
    12.783
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the concern is the foundation ring, surely why not have a conventional cast foundation ring Rivetted to the firebox sides, or will the side sheets of the firebox need to be changed to do this, ?
     
  9. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Înscris:
    11 Sep 2005
    Mesaje:
    36.681
    Aprecieri primite:
    10.060
    Sex:
    Masculin
    Ocupație:
    Retired-ish, Part time rail tour steward.
    Locație:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just to see a P2 going to landfill, was that what you were trying to say? ponder.gif :rolleyes: :)
     
  10. 60044

    60044 Member

    Înscris:
    24 Feb 2016
    Mesaje:
    926
    Aprecieri primite:
    1.337
    Sex:
    Masculin
    Locație:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I always thought foundation rings were forged, rather than cast.
     
    std tank și osprey apreciază asta.
  11. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Might be according to some posters on here...
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.688
    Aprecieri primite:
    12.783
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    sorry yes, your right, must engage brain first next time, but the question remains, if using a forged ring eliminates the cracking issue, is it a viable alternative?
     
  13. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.174
    Aprecieri primite:
    3.278
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IIRC the design was to be based on the current Tornado stay configuration and foundation ring forged corners, but with increased water space width. Now that the old boiler has been refurb'ed, instead of being set aside for later modification to the new spec, this will result in having two boilers with incompatible grate dimensions, so no commonality of spare grate sections. In fact the brick arch will also differ to some extent too.
     
    Last edited: 2 Aug 2025
  14. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Înscris:
    9 Oct 2019
    Mesaje:
    1.450
    Aprecieri primite:
    1.888
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Southern had a procedure for welding them.
    Pat
     
    osprey apreciază asta.
  15. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.955
    Aprecieri primite:
    1.091
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, some forged complete and machined, others forged as four pieces, then welded and machined.
     
  16. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.924
    Aprecieri primite:
    3.224
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    In January at the infamous visit, that was what was told, as @Sheff says, it may have gone into construction in the meantime???
     
    Sheff apreciază asta.
  17. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Out of curiosity are the basic components of a boiler/firebox stress relieved before welding ? For instance rolled steel is already stressed even before being machined/welded...just curious.... My years in engineering saw that machining (milling) one side of a rolled bar of flat steel released stresses...round bar and turning was not such a problem as you were dealing with a slightly different grain structure....
     
    northernsteam și Sheff apreciază asta.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    28.180
    Aprecieri primite:
    66.217
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Different grate area doesn’t automatically mean no commonality in grate sections. I don’t know what a Peppercorn grate looks like in detail, but the key thing is what is disposable, ie the firebars (in a conventional grate) or the cast elements in a rocking grate. They may well be interchsngeable, just perhaps having one element fewer in width, for example.

    As for brick arches - they are disposable and cast in situ just using a simple wooden former. So not much odds if two fireboxes differ in width by a couple of inches or so; you cast to fit the space.

    Ultimately, steam locos are in some facets precision machines built to close tolerances, and in others very definitely not!

    Tom
     
    MellishR apreciază asta.
  19. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.789
    Aprecieri primite:
    3.000
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    I've often wondered about your last paragraph. Having been in the machine tool industry all my life chasing half "thous" ( .0005 inches) and then microns made me smile...
     
    northernsteam, RalphW, Steve și încă o persoană apreciază asta.
  20. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.174
    Aprecieri primite:
    3.278
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I take your point Tom. I’ve only built arches in narrow box locos using precast firebricks. I can imagine in a wide box this may not be practical and so a former and fire cement is preferable, in which case my point is redundant.

    What happens with Bulleids with their syphons and S160s with arch tubes I wonder?

    As for the grate, it would be fairly straightforward to enlarge the area slightly by widening the side bearers, but not so easy to go smaller as in this case ?
     

Distribuie pagina asta