P2 Locomotive Company and related matters

الموضوع في 'Steam Traction' بواسطة class8mikado, بتاريخ ‏13 سبتمبر 2013.

  1. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,803
    عدد المعجبين:
    18,903
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is what the brick arch looks like in a Bulleid Pacific

    IMG_0656.jpeg
     
    Sheff و decauville1126 معجبون بهذا.
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,881
    عدد المعجبين:
    12,162
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mechanical engineers work to the nearest thou; civil engineers work to the nearest brick and boiler smiths work to the nearest boiler. ;)
     
    ross, mikehartuk, Leviathan و 9 آخرون معجبون بهذا.
  3. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,881
    عدد المعجبين:
    12,162
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does anyone build arches out of brick these days? I thought refractory concrete was the norm.
     
    أعجب بهذه المشاركة Sheff
  4. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,174
    عدد المعجبين:
    3,280
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m going back a while …. a long while. The bricks were probably ‘acquired’ after the end of steam in the NW. There were drawings showing which pattern brick went where for various LMS and BR locos.
    The arch was supported on a pair of bearer rods, one each side, which located on top of a row of studs screwed into the side of the firebox. There was a corresponding groove in the outer row of bricks.

    Am I showing my age here?
     
    أعجب بهذه المشاركة northernsteam
  5. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,797
    عدد المعجبين:
    3,002
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    No... knowledge and experience... irreplaceable....
     
    weltrol و Sheff معجبون بهذا.
  6. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    617
    عدد المعجبين:
    304
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Absolutely spot on! You can machine steel to any shape you want but if it need it to act structurally it needs to be done in a proper sequence of machining and stress relieving or it will just fall apart in use. A typical example being connecting and driving rods which always used to be forged IIRC. Blue Peter's would have been smashed to smithereens if they had just been lumps of machined steel.
     
  7. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,955
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You make no mention that components have to be made out of the correct grade of steel.
     
  8. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,881
    عدد المعجبين:
    12,162
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Flame cut and machined coupling rods became quite common on later build industrial diesel locomotives built by the likes of Hunslet, Sentinel, Hudswell, etc. and quite often the increased section at the bearings was done by welding plates onto the base rods. I’m unaware of such fabrications causing problems.
     
  9. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    617
    عدد المعجبين:
    304
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well said Std Tank, but then hopefully you would use the specified grade for the component you were making anyway.
     
  10. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    617
    عدد المعجبين:
    304
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But if they were stress relieved after all the welding and machining there probably would not be a problem. I do not know if that was done or not. My experience is heavy mechanical engineering, not specific locomotive engineering. Engineering has moved on in leaps and bounds since those days, wonderfully!
     
    أعجب بهذه المشاركة The Green Howards
  11. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,955
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One would hope so, but.
     