If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة nine elms fan, بتاريخ ‏4 نوفمبر 2012.

  1. burnham-t

    burnham-t New Member

    إنضم إلينا في:
    ‏26 فبراير 2008
    المشاركات:
    126
    عدد المعجبين:
    98
    الجنس:
    ذكر
    مكان الإقامة:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand it, there was a limited amount of upgrading done during the early part of WW2 with a view to enabling the K&ESR to be used as a diversionary route. I've not seen details of any such use (not so say it didn't take place under the stress of war). Steam operations on the original Rother Valley section relied on Terriers and the equivalent until closure in 1961, so there was no general increase in permitted axle load. The Army had rail mounted guns and Dean Goods 060s based at Rolvenden and Wittersham Road in the early part of the war and may have wanted track improvements to support that operation
    In later years, some of the line had steel sleepered track (salvaged from the Elham Valley) but I don't know whether that was laid during WW2 or later.
     
    jnc, H Cloutt و DavidW معجبون بهذا.
  2. Breva

    Breva Part of the furniture

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,425
    عدد المعجبين:
    4,199
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tony's trattatoria in tenterden high street :D
     
  3. simon

    simon Resident of Nat Pres

    إنضم إلينا في:
    ‏26 جوان 2006
    المشاركات:
    11,974
    عدد المعجبين:
    5,683
    I believe that if you look hard enough, you can find the occasional spaghetti tree and with global warming some of them are now fruiting.
     
    Wenlock, Jamessquared, jnc و 4 آخرون معجبون بهذا.
  4. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,691
    عدد المعجبين:
    12,786
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At least they didn't leave a surprise for the next occupiers of their camp, like one German POW in one camp, did, he made a lovely flower bed, took great care over it, and the commandant was very impressed with him, until next summer when it bloomed, and reveled his handywork, a very neatly done Swastika.
     
    Mark Thompson, jnc و H Cloutt معجبون بهذا.
  5. clinker

    clinker Member

    إنضم إلينا في:
    ‏8 اكتوبر 2016
    المشاركات:
    645
    عدد المعجبين:
    393
    الجنس:
    ذكر
    مكان الإقامة:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer


    Similar tale down on the RHDR when Italian POW's tended the flower beds at New Romney and when the Crocuses (Crocii?) bloomed they spelt out 'Il Duce'
     
    Wenlock و H Cloutt معجبون بهذا.
  6. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,709
    عدد المعجبين:
    4,236
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Haha! Its perfectly understandable, the bloody-mindedness on both sides. Although it seems like the Italians were just glad to be out of it, and doing something constructive.
     
    barnsley2857, jnc و H Cloutt معجبون بهذا.
  7. Howard B

    Howard B New Member

    إنضم إلينا في:
    ‏6 جوان 2021
    المشاركات:
    18
    عدد المعجبين:
    18
    الجنس:
    ذكر
    مكان الإقامة:
    Potton, Bedforshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Elham valley line didn't start closing until late 1947 & was still partly intact in 1953 as the rails were still being recovered. While the track was sent to the KESR it would have been after the war.
     
    burnham-t و H Cloutt معجبون بهذا.
  8. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,075
    عدد المعجبين:
    3,181
    The bridge works were done after the end of the war, in ‘46. There were so many POWs it was not until ‘48 that all were repatriated.
     
    Last edited: ‏10 أوت 2025 في 7:38 مساءاً
    burnham-t و Mark Thompson معجبون بهذا.
  9. paul1609

    paul1609 New Member

    إنضم إلينا في:
    ‏9 جوان 2006
    المشاركات:
    88
    عدد المعجبين:
    142
    الجنس:
    ذكر
    مكان الإقامة:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tom,
    As I understand it the track that came from the Elham Valley was the ex SECR 91 1/4lb bullhead rail which was laid in the early 1950s. This had wooden sleepers and keys. All the fixtures were non standard, fishplates, bolts etc as it had been designed for the head to be rotated. Chair wear on the bottom of the rail meant that this was never carried out. This rail upon preservation extended from about 1/2 mile south of Rolvenden to just past Mill Ditch Bridge about a mile east of Bodiam. The last stretch of 91 1/4lb lasted until the 21st Century when Lamings slip near Rolvenden was relaid. When a large amount of it was removed during the Northiam to Bodiam rebuilding a lot of the fishplates and bolts were actually rescued by one of the mainline engineering companies for use in Ashford yard.
    The steel sleepers were on the standard 95lb BR bullhead they extended about a mile from Mill Ditch Bridge around Padghams curve. They used standard BR steel keys. On the approach to Bodiam it changed back to wooden sleepers. The section just beyond Bodiam to Robertsbridge was before my time. I think the steel sleepers were actually new and experimental. I think a few of them still survive in Wittersham Yard.
     
    Copper-capped, Jamessquared و H Cloutt معجبون بهذا.
  10. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    119
    عدد المعجبين:
    636
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks Paul

    The BR drawings show just over 1/2 mile of the pressed steel 95lb BH sleeper were installed from east of Salehurst Halt as far as Junction Road siding - see attached photo dated 1954 showing them at the J Road end. In fact when the line was lifted for scrap in the 1970's a good number were purchased by the K&ESR preservation society and are those you mention that were installed a few years later on the Mill Ditch Bridge around Padghams curve section (between Rolvenden - Wittersham station). Mike
     

    الملفات المرفقة:

    burnham-t, Copper-capped, Fireline و 1 شخص آخر معجبون بهذا.
  11. burnham-t

    burnham-t New Member

    إنضم إلينا في:
    ‏26 فبراير 2008
    المشاركات:
    126
    عدد المعجبين:
    98
    الجنس:
    ذكر
    مكان الإقامة:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for clarifying things, both.
     

مشاركة هذه الصفحة