If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Rasprava u 'Steam Traction' pokrenuta od class8mikado, 13. Rujan 2013..

  1. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,940
    Lajkova:
    19,139
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is what the brick arch looks like in a Bulleid Pacific

    IMG_0656.jpeg
     
    Sheff and decauville1126 like this.
  2. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,044
    Lajkova:
    12,605
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mechanical engineers work to the nearest thou; civil engineers work to the nearest brick and boiler smiths work to the nearest boiler. ;)
     
    Hirn, ross, mikehartuk i 10 ostalih se sviđa ovo.
  3. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,044
    Lajkova:
    12,605
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does anyone build arches out of brick these days? I thought refractory concrete was the norm.
     
    Sheff se sviđa ovo.
  4. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,230
    Lajkova:
    3,364
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’m going back a while …. a long while. The bricks were probably ‘acquired’ after the end of steam in the NW. There were drawings showing which pattern brick went where for various LMS and BR locos.
    The arch was supported on a pair of bearer rods, one each side, which located on top of a row of studs screwed into the side of the firebox. There was a corresponding groove in the outer row of bricks.

    Am I showing my age here?
     
    garth manor and northernsteam like this.
  5. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    11,042
    Lajkova:
    3,097
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    No... knowledge and experience... irreplaceable....
     
    Hirn, weltrol i Sheff se sviđa ovo.
  6. northernsteam

    northernsteam Member

    Pridružen(a):
    25. Svibanj 2010.
    Poruka:
    623
    Lajkova:
    310
    Spol:
    Muškarac
    Interesi:
    Used to be in civil engineering, highway bridges.
    Grad:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Absolutely spot on! You can machine steel to any shape you want but if it need it to act structurally it needs to be done in a proper sequence of machining and stress relieving or it will just fall apart in use. A typical example being connecting and driving rods which always used to be forged IIRC. Blue Peter's would have been smashed to smithereens if they had just been lumps of machined steel.
     
  7. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    3,971
    Lajkova:
    1,111
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You make no mention that components have to be made out of the correct grade of steel.
     
  8. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,044
    Lajkova:
    12,605
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Flame cut and machined coupling rods became quite common on later build industrial diesel locomotives built by the likes of Hunslet, Sentinel, Hudswell, etc. and quite often the increased section at the bearings was done by welding plates onto the base rods. I’m unaware of such fabrications causing problems.
     
  9. northernsteam

    northernsteam Member

    Pridružen(a):
    25. Svibanj 2010.
    Poruka:
    623
    Lajkova:
    310
    Spol:
    Muškarac
    Interesi:
    Used to be in civil engineering, highway bridges.
    Grad:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well said Std Tank, but then hopefully you would use the specified grade for the component you were making anyway.
     
  10. northernsteam

    northernsteam Member

    Pridružen(a):
    25. Svibanj 2010.
    Poruka:
    623
    Lajkova:
    310
    Spol:
    Muškarac
    Interesi:
    Used to be in civil engineering, highway bridges.
    Grad:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But if they were stress relieved after all the welding and machining there probably would not be a problem. I do not know if that was done or not. My experience is heavy mechanical engineering, not specific locomotive engineering. Engineering has moved on in leaps and bounds since those days, wonderfully!
     
    The Green Howards se sviđa ovo.
  11. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    3,971
    Lajkova:
    1,111
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One would hope so, but.
     
  12. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    11,042
    Lajkova:
    3,097
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    Latest Mikado Messenger....very interesting..
     
  13. toplink

    toplink Member Friend

    Pridružen(a):
    28. Ožujak 2006.
    Poruka:
    211
    Lajkova:
    95
    Interesi:
    Signalman (retired)
    Grad:
    South Dorset & sometimes Somerset, now Spain
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Anything you can share?
     
  14. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,940
    Lajkova:
    19,139
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was nothing of substance in it. The boiler is being completed, it’s not far off now whatever that means. Nothing firm at all.
     
    silversteellady se sviđa ovo.
  15. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,230
    Lajkova:
    3,364
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    First off there’s no way the boiler will arrive on these shores this month as claimed previously as there’s more work to do before it can be tubed and tested.
    Somewhat surprisingly the inspection party comprised S Davies, G Bunker-James and their fitter Ian Greenan. There was no mention of a Boiler Insurance Inspector.
    Apparently once this boiler is finally shipped then the ‘3rd’ boiler will then enter the shop, to become a spare, with first use on Tornado.
     
    Sir Ralph Wedgwood and Johnb like this.
  16. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    11,042
    Lajkova:
    3,097
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    OK....Sorry I spoke.. I'll keep my mouth shut in future....
     
    guycarr360 se sviđa ovo.
  17. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Pridružen(a):
    9. Rujan 2013.
    Poruka:
    10,762
    Lajkova:
    19,019
    Spol:
    Muškarac
    Grad:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You didn't say anything to start with!
     
    Hirn, std tank, Jamessquared i 3 ostalih se sviđa ovo.
  18. brmp201

    brmp201 Member

    Pridružen(a):
    18. Svibanj 2010.
    Poruka:
    632
    Lajkova:
    1,002
    Spol:
    Muškarac
    Interesi:
    IT Director
    Grad:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
  19. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    11,042
    Lajkova:
    3,097
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    Deleted... sorry forgot to keep my mouth shut...
     
  20. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,230
    Lajkova:
    3,364
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is a reprint of the article mentioned above.
    Worth noting that the boiler can’t sensibly be lowered into the frames until the cylinder block is fitted.
    I guess you could fabricate a dummy saddle and drop it in for piping purposes but the time a d money would be better spent developing the valve gear.
     
    guycarr360, Hirn i Sir Ralph Wedgwood se sviđa ovo.

Podijelite ovu stranicu