If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Black 5 No.45379

Rasprava u 'Steam Traction' pokrenuta od Swan Age, 17. Lipanj 2009..

  1. Swan Age

    Swan Age Member

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    953
    Lajkova:
    275
    Spol:
    Muškarac
    Grad:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looks as though, according to the MHR website. that the boiler is likely to be fitted to the frames on Friday.

    AT LAST!!!!!
     
  2. 73096

    73096 Member

    Pridružen(a):
    19. Rujan 2007.
    Poruka:
    504
    Lajkova:
    0
    Grad:
    Salisbury
    It is making good progress but still a lot to do, the old saying goes "perfection takes time"
     
  3. Swan Age

    Swan Age Member

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    953
    Lajkova:
    275
    Spol:
    Muškarac
    Grad:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Anyone got any pics of the lift today? If not, hopefully there maybe an update to the official website soon.

    I fully understand that perfection takes time.
     
  4. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,626
    Lajkova:
    3,618
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Certainly much faster progress than when it was at the Avon Valley Railway. I remember a chap there telling me that they had removed rust from an area around the tender and replaced it with filler #-o . <BJ>
     
  5. brit70000

    brit70000 Member

    Pridružen(a):
    7. Srpanj 2007.
    Poruka:
    276
    Lajkova:
    33

    I had no idea it had been at the Avon Valley, it that's right it's certainly been around a bit. I'm told it came to the MHR from the GCR northern base at Ruddington.
     
  6. 61624

    61624 Part of the furniture

    Pridružen(a):
    27. Rujan 2006.
    Poruka:
    5,294
    Lajkova:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think at one time the West bSomerset had an option to buy it - I vaguely remember an appeal for £45379 to buy and restore it.......
     
  7. sturdon

    sturdon New Member

    Pridružen(a):
    18. Ožujak 2007.
    Poruka:
    135
    Lajkova:
    9
    Spol:
    Muškarac
    Grad:
    Devon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    45379 arrived at Bitton in 1974 and left in 1996 for Rudington
     
  8. brit70000

    brit70000 Member

    Pridružen(a):
    7. Srpanj 2007.
    Poruka:
    276
    Lajkova:
    33

    Thank you Sturdon, I knew someone on Net Pres would have the info.
     
  9. sturdon

    sturdon New Member

    Pridružen(a):
    18. Ožujak 2007.
    Poruka:
    135
    Lajkova:
    9
    Spol:
    Muškarac
    Grad:
    Devon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The '5' was owned by a small group of about 6, when at Bitton. for various reasons the group broke up ( one died and two moved away) that was in the early 90's.
     
  10. Fireline

    Fireline Well-Known Member

    Pridružen(a):
    11. Veljača 2008.
    Poruka:
    1,304
    Lajkova:
    1,356
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I do feel sorry for the groups, not only at Bitton, but elsewhere too, who bought engines with nothing but good intentions, but were never able to fulfill them. I suspect that seeing the engine you have worked on for years finally make it's first moves must be a fantastic moment. I know some have criticized groups in the past, but I think praise where it's due. But for the people who tried, some of these engines may not have survived this long.
     
  11. simon

    simon Resident of Nat Pres

    Pridružen(a):
    26. Lipanj 2006.
    Poruka:
    11,873
    Lajkova:
    5,565

    Arriving at Bitton in 1974:

    http://simon71.fotopic.net/p21680909.html


    The guys who originally bought it never really had the finance to rebuild it - but at least it left Barry sooner than a lot of other engines.
     
  12. Swan Age

    Swan Age Member

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    953
    Lajkova:
    275
    Spol:
    Muškarac
    Grad:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Further information of interest about 45379 can be found here: http://semaphore.avonvalleyrailway.org/ ... kings.html
    and here: http://semaphore.avonvalleyrailway.org/ ... alrun.html

    A photo also showing 45379 can be found on this page here: http://semaphore.avonvalleyrailway.org/ ... nties.html

    I remember visiting Bitton in about 1989 and saw the frames and wheelsets which were undergoing overhaul, i believe that was the extent of work that was done apart from stripping the loco apart in the first place. Incidentally i also seem to remember that the loco came from Barry with most of its fittings and motion.
     
  13. simon

    simon Resident of Nat Pres

    Pridružen(a):
    26. Lipanj 2006.
    Poruka:
    11,873
    Lajkova:
    5,565
  14. sturdon

    sturdon New Member

    Pridružen(a):
    18. Ožujak 2007.
    Poruka:
    135
    Lajkova:
    9
    Spol:
    Muškarac
    Grad:
    Devon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One crosshead, both eccentric rods and both coupling rods were missing on its arrival at Bitton.
    No injectors, second-hand injectors were obtained from South Africa.
    New un-machined rods were obtained and stored on site.
    The bogies and the driving wheels were all sent to Swindon for turning. A new ash-bin was made on site.
    The tender tank was removed from its chassis and new panels welded in where required, NO filler was ever used on any part of the loco.
     
  15. 34007

    34007 Part of the furniture

    Pridružen(a):
    16. Ožujak 2007.
    Poruka:
    3,166
    Lajkova:
    2
    Spol:
    Muškarac
    Grad:
    Hampshire
    Proves there is still hope for others!!! But 45379 still shows the MHR can get a loco to running condition as they can do with the Std too....
     
  16. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,626
    Lajkova:
    3,618
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Unfortunately I cannot agree as I know the guy who actually did it.

    <BJ> .....who walks past the Bitton site each day.
     
  17. Swan Age

    Swan Age Member

    Pridružen(a):
    8. Rujan 2005.
    Poruka:
    953
    Lajkova:
    275
    Spol:
    Muškarac
    Grad:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whether filler was or was not used on the tender, it does not matter anymore as the MHR had a new tank built for the chassis to give the longest service life.
     
  18. 34007

    34007 Part of the furniture

    Pridružen(a):
    16. Ožujak 2007.
    Poruka:
    3,166
    Lajkova:
    2
    Spol:
    Muškarac
    Grad:
    Hampshire
    I think this has somewhat passed to the MHR now...
     
  19. Small Prairie

    Small Prairie Part of the furniture

    Pridružen(a):
    8. Prosinac 2006.
    Poruka:
    2,558
    Lajkova:
    229
    Spol:
    Muškarac
    Interesi:
    Coach Driver
    Grad:
    North Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What? I know i dont make sence half the time , but andy ,,,,think about how it sounds to others before posting !
     
  20. martin butler

    martin butler Part of the furniture

    Pridružen(a):
    16. Lipanj 2008.
    Poruka:
    3,440
    Lajkova:
    388
    any idea on when she is likily to be ready for her first steam trials, will the boiler be re tested to re set the clock to give it 10 years on the boiler ? any chance on it being in steam in september in the yard? [-o<
     

Podijelite ovu stranicu