If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة nine elms fan, بتاريخ ‏4 نوفمبر 2012.

  1. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    129
    عدد المعجبين:
    697
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Harold. Yes. Mike
     
    Keith Cake و H Cloutt معجبون بهذا.
  2. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,732
    عدد المعجبين:
    4,282
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Several updates to the blog, covering the abovementioned installation of the walkways on bridge 25, plus a recap of the ongoing Gully works:
    https://rvrailway.blogspot.com/?m=1
     
    أعجب بهذه المشاركة brmp201
  3. DavidH

    DavidH New Member

    إنضم إلينا في:
    ‏23 مارس 2016
    المشاركات:
    90
    عدد المعجبين:
    117
    مكان الإقامة:
    The Marches
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As a volunteer at a small railway museum, I have learned to never underestimate the ability of a small group of volunteers to start with ostensibly the same information sources and arrive at wildly different conclusions when talking to the public! (And the others may well say the same about me.)
     
    DavidW, mgp, jnc و 4 آخرون معجبون بهذا.
  4. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    129
    عدد المعجبين:
    697
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Miff, DavidW و Mark Thompson معجبون بهذا.
  5. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,732
    عدد المعجبين:
    4,282
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi Mike,
    Many thanks again for today's journey by Citroën railbus;) along the glorious Rother Valley. You and Alistair were both excellent and informative hosts, and I hope that we may meet again very soon.
    My best wishes to you both,
    Mark
     
    أعجب بهذه المشاركة Miff
  6. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    129
    عدد المعجبين:
    697
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thank you Mark. Was a pleasure to meet you and show you around the RVR project works. Looking forward to your next visit. Mike.
     
    Miff و Mark Thompson معجبون بهذا.
  7. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,369
    عدد المعجبين:
    5,503
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
  8. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    129
    عدد المعجبين:
    697
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    RVR Update.

    The extensive overhaul of RVR owned locomotive 'Charwelton' chassis is now complete thanks to JM Steam Ltd based at the Buckinghamshire Railway Centre. That work included fitting new cylinders. Last Thursday the finished rolling chassis was transferred over to the long established Flour Mill locomotive workshops in Gloucestershire who will look after competition of the loco and its recommissioning ready for putting the engine back into service on the Kent & East Sussex Railway. With the locos new boiler due to arrive at the Flour Mill next week everything will then be on site ready for work to get underway

    https://rvrailway.blogspot.com/
     
    alts1985, Wenlock, Johnme101 و 9 آخرون معجبون بهذا.
  9. lynbarn

    lynbarn Well-Known Member

    إنضم إلينا في:
    ‏22 أوت 2006
    المشاركات:
    1,736
    عدد المعجبين:
    636
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi Mike, I am not sure what it is about 'Charwelton' that I like as a steam loco; maybe it has something to do with the fact that it is a Manning Wardle. Whatever it is, you guys are doing a fantastic job on her, and I look forward to coming down for a ride behind her at some stage
     
    أعجب بهذه المشاركة clinker
  10. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,102
    عدد المعجبين:
    3,241
    One of the recent blog updates says the concrete level-crossing base panels’ve been delivered to all 3 sites and the barrier equipment to (off-site) storage.

    Previous reports said the 3 crossings’d be installed on different planned dates for each site, starting with Junction Rd., then Northbridge St. As far as I know these dates’ve not yet been announced but things’re clearly moving towards the first one.
     
    Last edited: ‏20 سبتمبر 2025 في 10:32 صباحاً
    Biermeister, clinker, H Cloutt و 3 آخرون معجبون بهذا.
  11. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,072
    عدد المعجبين:
    1,553
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The East Sussex Highways road works website currently has no dates showing for the works.
     
  12. mikehartuk

    mikehartuk New Member

    إنضم إلينا في:
    ‏29 جوان 2007
    المشاركات:
    129
    عدد المعجبين:
    697
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We are working with East Sussex County Council, the highway authority for Junction Road, looking at road closure dates. We had hoped for the October half term week but that's already been grabbed by others. So, it looks like the first slot they have available is going to be January unless some other booking can be shuffled around. Mike.
     
    black5, mikechant, DavidW و 7 آخرون معجبون بهذا.
  13. mikechant

    mikechant Member

    إنضم إلينا في:
    ‏24 اكتوبر 2012
    المشاركات:
    258
    عدد المعجبين:
    283
    It's good to have some hard info "from the horse's mouth". The progress on this project is so impressive and professional-looking!
     
    Mark Thompson و H Cloutt معجبون بهذا.
  14. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,072
    عدد المعجبين:
    1,553
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It doesn't help that the A21 around Robertsbridge seems to be closed overnight most nights and Junction Road seems to be a Diversion used by many. In addition North Bridge Street is used by many villagers for access into and out of the village. So whatever date is chosen is going to be an issue for some.
     
    Mark Thompson و jnc معجبون بهذا.
  15. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,732
    عدد المعجبين:
    4,282
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But at least it will only be a short, sharp occupation, which wont go on endlessly like the current closures. I got caught by one at Hurst Green the other week, and having to go home via the Ticehurst lanes in the peeing rain was no joke.
     
    H Cloutt و Biermeister معجبون بهذا.
  16. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,905
    عدد المعجبين:
    13,022
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does Junction Road, need to be a full closure? Is there enough land to put in a temporary single track road round the site, with traffic lights, if the A21 Is closed at any time whilst the level crossing is being installed and Junction Road still needs to be available, as a diversionary route?
     
    أعجب بهذه المشاركة H Cloutt
  17. Fireline

    Fireline Well-Known Member

    إنضم إلينا في:
    ‏11 فبراير 2008
    المشاركات:
    1,372
    عدد المعجبين:
    1,532
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Junction Road will need to be a full closure. No room to go anywhere.
     
    H Cloutt و Miff معجبون بهذا.
  18. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,102
    عدد المعجبين:
    3,241
    On any single carriageway road it’s highly unlikely a job like this could be done 'half & half' with traffic-signals. It's not a simple road-surfacing operation. In addition to the dimensions and joint-locations of the concrete base units you’d also need road space for plant, operatives and safety-zones.

    RVR’ve always said they’d need road-closures and I’ve no reason to doubt that. They’re using precast concrete units both to reduce road-closure time (probably only a day or two) and to minimise any road maintenance requirements in the future.
    Here’s how KESR did it at Rolvenden in 2017 and they’ve since done another at Northiam using the same methods.
    https://www.railengineer.co.uk/revolutionary-level-crossing-on-kent-heritage-railway/?amp

    From the highway authority’s point of view they need to agree a date not only when there’s no conflicting works in Junction Road itself but also when there’s no conflicting works or events in other roads needing this route as a diversion or relief.
     
    Last edited: ‏22 سبتمبر 2025 في 10:35 صباحاً
    Biermeister, 5944, ilvaporista و 5 آخرون معجبون بهذا.
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,905
    عدد المعجبين:
    13,022
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, I just wondered if there was a way to divert traffic around the level crossing site, but as you say, it will need a full closure, I suppose the best time will be overnight, and a weekend, when hopefully there is less traffic,
     
    jnc و Miff معجبون بهذا.
  20. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,072
    عدد المعجبين:
    1,553
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think Northiam and Rolvenden were done overnight but there was an existing crossing there. Dean Forest railway [advised by someone from KESR] replaced one in about 4 days and have another replacement in the planning stage.
     
    أعجب بهذه المشاركة jnc

مشاركة هذه الصفحة