If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discuție în 'Heritage Railways & Centres in the UK' creată de Gav106, 8 Mai 2010.

  1. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.977
    Aprecieri primite:
    2.200
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I said above
    "A lot of it is down to commercial positions, but I've yet to see the paying party do better..."
    In that circumstance, why would a cost-plus contract be any better for the Employer?
     
  2. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    30.275
    Aprecieri primite:
    31.482
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the choice is fixed price vs. cost plus, then I agree. But other models exist as well - in the IT world, time and materials is common.

    I'm far from convinced that, where information is incomplete, fixed price does get the best value as too much risk needs to be added in - and where it isn't, it comes through as the contractor's inability to deliver.
     
    jnc, Gladiator 5076 și Paul42 apreciază asta.
  3. mikechant

    mikechant Member

    Înscris:
    24 Oct 2012
    Mesaje:
    264
    Aprecieri primite:
    287

    Fortunately for the GCR the fire was on the side of the building furthest away from the railway. I hope no airborne burning debris landed on the rolling stock in the sidings.
     
  4. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.497
    Aprecieri primite:
    1.850
    Sad about the Shepshed Lace factory, a prominent backdrop to the railway from the Great Central Road bridge. There's online speculation someone wants the site for housing... probably best not to discuss beyond that one-liner here. I hope the facade survives at least.

    Going back to the 'gap' and drawing parallels, most of the big projects I've worked on have been on time and on budget. The only slight complication is that the programmes and budgets keep shifting as the projects go along...
     
    Sheff și Kempenfelt 82e apreciază asta.
  5. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.977
    Aprecieri primite:
    2.200
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm fully aware of different models, and in lots of years of doing this lark, I've come accross precisely one client who was prepared to invest properly in anything other than fixed price. Incomplete information is a sign you shouldn't be building it.
    Anyway, let's hope the GCR get it built.
     
  6. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.977
    Aprecieri primite:
    2.200
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's not automatically a bad thing, any well-organised project should have contingency, it's when it's uncontrolled that it's an issue.
     
  7. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    30.275
    Aprecieri primite:
    31.482
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. Civils seems a lot more mature in this regard than IT...
     
    Bikermike apreciază asta.
  8. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.977
    Aprecieri primite:
    2.200
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We have plenty of our own ways to foul it up, and we share a belief that cheaper is always better and wonder why it doesn't work...
     
    Sheff, Hirn și 35B apreciază asta.
  9. NBDR Lock

    NBDR Lock New Member

    Înscris:
    18 Iun 2012
    Mesaje:
    161
    Aprecieri primite:
    131
    Could this provide an opportunity to acquire sufficient land for a new shed?

    Too expensive I would imagine! Plus, providing rail access really problematic.

    Think I've just answered my own question. :(
     
  10. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.694
    Aprecieri primite:
    2.250
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  11. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.092
    Aprecieri primite:
    6.623
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for posting Johann.
    Great news to see that the ground investigation work has started. Very ironic given that the Midland Main Line electrification has again been "paused" /stopped at "nearly" Leicester! There will be steam locomotives going over the MML before electric trains go along at Loughborough...
     
    DavidW, misspentyouth62 și bristolian apreciază asta.
  12. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.977
    Aprecieri primite:
    2.200
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If you really want to turn the knife, get some 1500v dc overhead and run electric trains over the MML whilst running a steam train along it...[1]

    [1] this may not be entirely serious proposal...
     
    35B, MellishR, Bluenosejohn și alți 2 apreciază asta.
  13. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.694
    Aprecieri primite:
    2.250
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A view from the end of the canal bridge yesterday morning looking towards the MML bridge with one of the soil sample rigs visible.

    DSCF5850.JPG

    You can wander into that area from the canal towpath as there is a very well worn footpath leading into it, and, off the bottom of the shot, there are some people living in a tent on what will be the course of the new viaduct!
     
  14. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.092
    Aprecieri primite:
    6.623
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That rig is where the Severn Trent Combined Sewer outflow is situated (the grey railings fencing it off) This is to have a short bridge which is to allow maintenance vehicles to go under the railway I believe.
     
  15. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.694
    Aprecieri primite:
    2.250
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  16. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.092
    Aprecieri primite:
    6.623
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for posting Johann - these up to date videos are really informative and show how our money is being spent...and why it is such a complex project. Far more than I, and I suspect most other people, have realised.
     
  17. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.092
    Aprecieri primite:
    6.623
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    DSC04602.JPG DSC04603.JPG DSC04604.JPG

    Well the drilling rigs etc have left the site but there are various long term measuring devices (Those short blue capped tubes) along the route to monitor the water levels and any gas discharges I believe. This process and the analysis will have cost about £250,000. Next is the detailed design of the foundations and structures.
     
  18. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.694
    Aprecieri primite:
    2.250
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    weltrol, Musket The Dog, bristolian și alți 9 apreciază asta.

Distribuie pagina asta