Rother Valley Railway

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od nine elms fan, 4. Studeni 2012..

  1. jnc

    jnc Well-Known Member

    Pridružen(a):
    3. Travanj 2012.
    Poruka:
    1,586
    Lajkova:
    2,775
    Spol:
    Muškarac
    Grad:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A truly fantastic article; it has a fair amount of engineering detail, for we geeks. I highly recommend it to everyone. Thanks for posting it!

    Noel
     
    Miff se sviđa ovo.
  2. mikehartuk

    mikehartuk New Member

    Pridružen(a):
    29. Lipanj 2007.
    Poruka:
    129
    Lajkova:
    697
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Jon Not entirely correct Im afraid. The installation of the track slab and rails will need a relatively short term closure. All the rest of the associated roadworks, including barrier equipment installation, is done by single line working. Mike
     
  3. Miff

    Miff Part of the furniture Friend

    Pridružen(a):
    17. Lipanj 2008.
    Poruka:
    3,142
    Lajkova:
    3,283
    That makes sense - I understand why you wanted half-term if it’s something like 1-2 days road-closure plus a few days of 2-way temporary signals. Good luck with alternative dates.

    (Rolvenden & Northiam, of course, didn’t need signals or any time for barrier equipment installation since they’re both manually operated gated crossings.)
     
  4. Fireline

    Fireline Well-Known Member

    Pridružen(a):
    11. Veljača 2008.
    Poruka:
    1,386
    Lajkova:
    1,569
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hi Mike. I was only referring to the slabs going in. I didn't know when or how the rest of it would be done. :)
     
    Wenlock, jnc i Miff se sviđa ovo.
  5. John Petley

    John Petley Part of the furniture

    Pridružen(a):
    8. Listopad 2007.
    Poruka:
    2,997
    Lajkova:
    2,624
    Spol:
    Muškarac
    Interesi:
    Researcher/writer and composer of classical music
    Grad:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I doubt if these road closures/temporary traffic lights will cause much of a ripple, if any, here in East Sussex. This must be the No. 1 UK hotspot for traffic disruption - water mains, broadband, you name it - everything except pothole repairs, sadly. Installation of a level crossing will just be another inconvenience which local drivers will take in their stride as they are just so used to their journeys being affected by road works. If I manage more than 15 miles around here without encountering a single "Road closed " sign or tempoarary traffic lights, it's little short of a miracle these days.
     
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,762
    Lajkova:
    4,332
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ain't that the troof?!
     
  7. martin1656

    martin1656 Guest

    Here in Hastings, we're surrounded by the flipping things, Roadworks, not level crossings, of course, the road to nowhere, london road, all the main routes, it seems have these , then there's the potholes, ours are now so old, they could qualify for ancient monuments .
     
  8. Fireline

    Fireline Well-Known Member

    Pridružen(a):
    11. Veljača 2008.
    Poruka:
    1,386
    Lajkova:
    1,569
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As could most of the residents. :)
     
  9. martin1656

    martin1656 Guest

    Look outside, see that glow in the distance, Well that's people from Hastings enroute, with lit torches, on their Zimmer frames to have a word, :eek:
     
  10. Streetert

    Streetert New Member

    Pridružen(a):
    24. Listopad 2011.
    Poruka:
    25
    Lajkova:
    88
    Interesi:
    Retired Chartered Shipbroker
    Grad:
    Llantrisant, South Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Privici:

    DavidW, CH 19, clinker i 4 ostalih se sviđa ovo.
  11. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,762
    Lajkova:
    4,332
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    alastair and jnc like this.
  12. Wenlock

    Wenlock Well-Known Member Friend

    Pridružen(a):
    26. Listopad 2008.
    Poruka:
    2,158
    Lajkova:
    1,412
    Spol:
    Muškarac
    Interesi:
    Bus Driver
    Grad:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
  13. burnham-t

    burnham-t New Member

    Pridružen(a):
    26. Veljača 2008.
    Poruka:
    146
    Lajkova:
    129
    Spol:
    Muškarac
    Grad:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, track has been in place from Robertsbridge station to the Northbridge Street level crossing for some years. Incidentally, I believe that level crossing was the only one on the old K&ESR to have a separate crossing keeper employed.
     
    Wenlock, clinker i Miff se sviđa ovo.
  14. Wenlock

    Wenlock Well-Known Member Friend

    Pridružen(a):
    26. Listopad 2008.
    Poruka:
    2,158
    Lajkova:
    1,412
    Spol:
    Muškarac
    Interesi:
    Bus Driver
    Grad:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm just so used to seeing aerial photos displayed in conventional orientation, that my mind automatically reads right as East.

    I have had a similar momentary confusion when I first encountered one of the engraved map pillars in London. They are oriented to align with the direction one is facing, rather than traditional 'North is Up'.

    And yet I don't suffer any similar confusion with a car sat-nav being aligned with facing direction of travel.

    [post script. I have become aware in recent years that some children do not get any cartographical teaching in their geography lessons. And they therefore have slight difficulties with reading conventional maps.]
     
  15. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,762
    Lajkova:
    4,332
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The relaying of the down headshunt on the rebuilt embankment North of Robertsbridge is well underway, again using the RVR as its strategic access and storage point.
    https://rvrailway.blogspot.com/?m=1
     
    DavidW, burnham-t i weltrol se sviđa ovo.
  16. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,762
    Lajkova:
    4,332
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Some really interesting updates, showing how the platform roads being relaid at Etchingham are cascading their redundant materials south to Robertsbridge, for their repurposing as the Down siding.
    https://rvrailway.blogspot.com/?m=1
    Worth a look here is the embedded YT video of the previous full relaying at Etchingham, just a shade over 51 years ago, now...
    Trackside hi-viz then seemed to consist of taking ones shirt off!
     
    burnham-t and Wenlock like this.
  17. Wenlock

    Wenlock Well-Known Member Friend

    Pridružen(a):
    26. Listopad 2008.
    Poruka:
    2,158
    Lajkova:
    1,412
    Spol:
    Muškarac
    Interesi:
    Bus Driver
    Grad:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I remember that when I transferred to Hoo Jn in 1976, Hi-Vis was provided, but not compulsory. The shunters and train crews rarely wore Hi-Vis while within the yard, even when crossing the mainline to the Down Yard.
    At that time the "minivests" provided, were not designed to pull apart if snagged. Shunters felt unsafe because they could get caught while "in between".

    Velcro fastening safety gear came much later.
     
  18. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    9,048
    Lajkova:
    7,700
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hard hats not invented by then either.
    Mind you (in the absence of internet last week) I watched one of those Aussie Rail programmes. Included a heritage line where they were fitting a new tank to a tender frame. No overhead lifting gear, guys underneath with no hard hats and the tank "moved into place" by being nudged with the forklift tines.
    No ORR equivalent down there I guess.
     
  19. garth manor

    garth manor Well-Known Member

    Pridružen(a):
    10. Travanj 2009.
    Poruka:
    1,995
    Lajkova:
    563
    ONRSR
     
  20. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,762
    Lajkova:
    4,332
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    NTDWA.
     