If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

34028 and going Main Line

الموضوع في 'Steam Traction' بواسطة gricerdon, بتاريخ ‏26 جويلية 2025.

  1. alastair

    alastair Well-Known Member

    إنضم إلينا في:
    ‏7 نوفمبر 2005
    المشاركات:
    1,299
    عدد المعجبين:
    828
    Indeed, now shown as 2 x Cromptons on R Herald Railtours
     
  2. Rander

    Rander Member

    إنضم إلينا في:
    ‏24 فبراير 2007
    المشاركات:
    315
    عدد المعجبين:
    105
    RTC have confirmed that 34028 will haul both The Varsity Explorer, Slough - Chester, on 25th October, and The Chiltern Explorer, Manchester - Reading, on 1st November.

    Presumably 34028 will spend the week at Carnforth in between the two trips.
     
    Sunnieboy, silversteellady, Johnme101 و 3 آخرون معجبون بهذا.
  3. buzby2

    buzby2 Well-Known Member

    إنضم إلينا في:
    ‏26 مارس 2009
    المشاركات:
    1,813
    عدد المعجبين:
    686
    مكان الإقامة:
    Swanage
    Before the trip to Chester on the 25th, I wonder if WCRC will want to undertake a running-in turn (once the middle connecting rod is in place) for 34028 as well as, perhaps, another loaded test train?
    Can't see anything on RTT yet - but perhaps repairs at Herston Works (?) are not yet complete or the rod not yet re-fitted at Southall.
     
  4. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    8,829
    عدد المعجبين:
    7,508
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Did it come back to Herston Peter? I thought there was no access for a low loader at Southall with Three Bridges being weight and width restricted and a very difficult turn (too long for a loco) on to the Uxbridge Road at Iron Bridge. I have seen no mention of a rail movement anywhere. I know the latest Steam Railway says it was, but these days if they told me the time I think I want to see a clock first to see if they were correct.
     
  5. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,963
    عدد المعجبين:
    19,237
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is access for a low loader but the only loading point I know about is on the LSL side. I don’t know if they would allow anything associated with WC to use it though
     
  6. Rander

    Rander Member

    إنضم إلينا في:
    ‏24 فبراير 2007
    المشاركات:
    315
    عدد المعجبين:
    105
    I thought the component(s) went back to Herston but the loco remained at Southall?
     
  7. buzby2

    buzby2 Well-Known Member

    إنضم إلينا في:
    ‏26 مارس 2009
    المشاركات:
    1,813
    عدد المعجبين:
    686
    مكان الإقامة:
    Swanage
    So did I.
    It seems my ".. but perhaps repairs at Herston Works (?) are not yet complete or the rod not yet re-fitted at Southall." could have been phrased better.
     
    أعجب بهذه المشاركة Rander
  8. buzby2

    buzby2 Well-Known Member

    إنضم إلينا في:
    ‏26 مارس 2009
    المشاركات:
    1,813
    عدد المعجبين:
    686
    مكان الإقامة:
    Swanage
    Still not heard any more about 34028's situation but RTT has the following:
    WCRC Southall to Slough - https://www.realtimetrains.co.uk/service/gb-nr:U67948/2025-10-25/detailed
    Slough to Chester - https://www.realtimetrains.co.uk/service/gb-nr:U67949/2025-10-25/detailed
    Probably turning on the triangle of lines at Chester (with water and coaling?): https://www.realtimetrains.co.uk/service/gb-nr:U67950/2025-10-25/detailed
    Probably this is the ECS to get 34028 to Carnforth: https://www.realtimetrains.co.uk/service/gb-nr:U67951/2025-10-25/detailed
    Diesel return of excursion to Slough: https://www.realtimetrains.co.uk/service/gb-nr:U67952/2025-10-25/detailed
     
    Last edited: ‏15 اكتوبر 2025 في 8:31 مساءاً
  9. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,187
    عدد المعجبين:
    6,064
    Loco plus support coach would be shown as ECS, but "Pathed as Diesel locomotive, trailing load 715 tonnes" is odd as that would normally apply for a steam loco with a full length train.
     
  10. AMP

    AMP Member

    إنضم إلينا في:
    ‏29 جويلية 2007
    المشاركات:
    474
    عدد المعجبين:
    345
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Trackside magazine said the loco was reassembled by 25th September.

    There is a turning move from Southall on Friday 24 so could double as a run in turn but is cutting it a little fine!

    https://www.realtimetrains.co.uk/service/gb-nr:U67995/2025-10-24/detailed

    Also the turning move at Chester is before the train arrives in a platform on arrival from Slough.

    Andrew
     
  11. Rander

    Rander Member

    إنضم إلينا في:
    ‏24 فبراير 2007
    المشاركات:
    315
    عدد المعجبين:
    105

مشاركة هذه الصفحة