North Yorkshire Moors Railway General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем The Black Hat, 13 фев 2011.

  1. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Дата регистрации:
    2 окт 2015
    Сообщения:
    8.935
    Симпатии:
    7.610
    Пол:
    Мужской
    Адрес:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is FS being under cover a new requirement now that it has "changed hands". It was never under cover on either recent visits to Swanage. Not least as at the time there was nowhere under cover big enough to take it.
     
  2. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    30.560
    Симпатии:
    31.928
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'd love to see twin tracks through Newtondale, and can easily see the advantages of improved flexibility. But I'm also looking at both long term trends for ridership, revenue and costs, and wondering where cost, flexibility, and income balance. It's 25 years since the GCR doubled to Rothley, and still the remaining 2 1/2 miles to Leicester are single track.

    Right now, NYMR needs jam today, not next decade.
     
    jnc нравится это.
  3. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.472
    Симпатии:
    67.496
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My hunch is that there is an element in the negotiations whereby the NRM might request / require it where they can, but in the knowledge that on certain railways, the answer is “if we ask for that, we know they can’t provide it at all so why even bother to ask”.

    In other words, if you get as far as negotiating a deal with Swanage, you already know before you even start that covered accommodation isn’t possible - so either accept that, or don’t enter into a negotiation in the first place. With other railways, it is a bit easier to at least start from a position of “this is a requirement”.

    Tom
     
    Steve нравится это.
  4. Sawdust

    Sawdust Member

    Дата регистрации:
    18 июл 2015
    Сообщения:
    619
    Симпатии:
    1.049
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Who has said anything about double tracking through Newtondale. What I've suggested is extending loops so they become more like dynamic passing loops.
    If you need more jam today stop spending so much of it on wages and associated costs.

    Sawdust.
     
    Steve, Diamond Gaz и Dave fisher нравится это.
  5. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    4.542
    Симпатии:
    10.388
    I agree it wasnt a requirement before. As to secure, when it came to Ropley we had 24hr security. I would have thought the carriage shed would have been ideal for a few nights.
     
    torgormaig нравится это.
  6. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    30.560
    Симпатии:
    31.928
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly - working as twin track sections through Newtondale! As for staffing, that may be the right answer - but without reopening that particular can of worms, adding additional critical infrastructure is likely to increase the labour requirement.

    These may be worthwhile ideas, but my "jam today" point remains - NYMR needs to get a deal stronger before it starts on projects like that.
     
  7. torgormaig

    torgormaig Part of the furniture Friend

    Дата регистрации:
    17 июл 2007
    Сообщения:
    5.187
    Симпатии:
    8.461
    Funnily enough it was not under cover for most of its recent visit to the NRM - nor was it on display despite it being there over the 50th Anniversary Weekend:(.

    Peter
     
    jnc, MikeParkin65, guycarr360 и 6 другим нравится это.
  8. 60044

    60044 Well-Known Member

    Дата регистрации:
    24 фев 2016
    Сообщения:
    1.125
    Симпатии:
    1.595
    Пол:
    Мужской
    Адрес:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Err..... isn't the new carriage barn supposed to super-secure and well-protected? That's what some of who raised concerns about it were told when it was being built? I wonder if that was all a pile of equine ordure to fob us off?
     
    Diamond Gaz, Sawdust и 35B нравится это.
  9. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Дата регистрации:
    2 окт 2015
    Сообщения:
    8.935
    Симпатии:
    7.610
    Пол:
    Мужской
    Адрес:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So was the Louvre :D
     
    jnc, 5944, Diamond Gaz и ещё 1-му нравится это.
  10. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    6.065
    Симпатии:
    2.850
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is a problem with any thought of Double Tracking.

    Over the years track renewals have made use of the full width of the formation to reduce the curve radius and in so doing enabled the installation of CWR and Steel Sleepers.

    In some locations such as Kingthorpe for one, any realignment there would push the radius below 200m which means the installation of Check rail is required. Probably requiring unnecessary early renewal of the track with Timber or other composite sleepers because the Concrete or Steel sleepers are not suited for tight curves. Tight curves may result in a reduction of speed and an increase in wheel wear.

    Each of the other reverse curve areas would also need to be treated in the same manner.

    Is the ground alongside suitable for extending the formation width or would it require huge expense in the installation of piling? This may also involve replacement of lineside Drainage systems.
    How many bridges have been renewed with the concrete beams set in the centre of the alignment? Or in the case of Overbridges again been centralised to increase clearances.
     
    jnc, Chris86, Sawdust и 2 другим нравится это.
  11. paul1609

    paul1609 New Member

    Дата регистрации:
    9 июн 2006
    Сообщения:
    101
    Симпатии:
    153
    Пол:
    Мужской
    Адрес:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How do you manage dynamic passing loops on a heritage railway with token block working?
     
  12. Sawdust

    Sawdust Member

    Дата регистрации:
    18 июл 2015
    Сообщения:
    619
    Симпатии:
    1.049
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How is increasing the length of two passing loops and having one additional loop within the fully signalled track circuited area controlled by New bridge going to require extra staffing? It would require the same number of signallers as now?
    I know double tracking whole sections is a non starter the reasons Ploughman states. It only requires a relatively short time and length reduction in the Levisham-Goathland section to enable three paths an hour rather two.

    Sawdust.
     
  13. Sawdust

    Sawdust Member

    Дата регистрации:
    18 июл 2015
    Сообщения:
    619
    Симпатии:
    1.049
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bin the heritage signalling and operate like the Borders Railway. I don't know Graham was signalman at Levisham for years, so must have had a plan, if it was another cabin near summit he didn't say so.

    Sawdust.
     
  14. Dumb buffer

    Dumb buffer New Member

    Дата регистрации:
    25 фев 2025
    Сообщения:
    33
    Симпатии:
    26
    Пол:
    Мужской
    Адрес:
    Newcastle upon Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you had train operated points that removes the point machine problem. Powering LED signals may be a problem in Newtondale. You could run a power cable but that would be expensive and you would probably need some sort of track circuits as well.
     
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.472
    Симпатии:
    67.496
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It sort of feels to me that if you had money for capital investment, there are probably higher priorities - like land for a car park ;)

    Tom
     
    MellishR, 5944, 35B и 2 другим нравится это.
  16. paul1609

    paul1609 New Member

    Дата регистрации:
    9 июн 2006
    Сообщения:
    101
    Симпатии:
    153
    Пол:
    Мужской
    Адрес:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Borders railway system is described in this article : https://www.railengineer.co.uk/borders-railway-signalling-and-telecoms-one-year-on/
    There is absolutely no way you could make a business case for this on a heritage railway. It would bankrupt the nymr before you ran a train.
     
  17. Diamond Gaz

    Diamond Gaz Well-Known Member

    Дата регистрации:
    15 апр 2005
    Сообщения:
    1.670
    Симпатии:
    100
    Or even simpler and cheaper things, like making sure your only non Flying Scotsman service, during a school holiday week when you're only running 5 out of 7 days, is 7 or 8 coaches, rather than 5 coaches... Doing it for one day as an emergency is understandable, but 2 days in a row....
     
    5944, Steve, Sawdust и 2 другим нравится это.
  18. Steve

    Steve Nat Pres stalwart Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    13.104
    Симпатии:
    12.756
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As @Ploughman has said, double track through Newtondale is a non-starter because of bridges and alignment changes, unless Jeremy Hosking gets involved, that is! What I believe is still possible is double track to summit but I could be out of date on that score.
     
    Sawdust нравится это.
  19. Steve

    Steve Nat Pres stalwart Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    13.104
    Симпатии:
    12.756
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The only reason to say that covered accommodation was a contract requirement was because @Lineisclear said so in post 8324. That and limited mileage. I do wonder how truthful some of his unsubstantiated statements are at times?
     
    Sawdust и 60044 нравится это.
  20. 60044

    60044 Well-Known Member

    Дата регистрации:
    24 фев 2016
    Сообщения:
    1.125
    Симпатии:
    1.595
    Пол:
    Мужской
    Адрес:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah! So I'm not the only member of this particular club, then!
     
    Sawdust нравится это.