If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Dieses Thema im Forum 'Steam Traction' wurde von class8mikado gestartet, 13 September 2013.

  1. Steve

    Steve Nat Pres stalwart Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    13.296
    Zustimmungen:
    13.387
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand it from reading on here the boiler on Tornado is its original, refurbished. The asymmetric boiler currently being discussed is new.
     
    Jamessquared gefällt dies.
  2. RAB3L

    RAB3L Member

    Registriert seit:
    4 Januar 2013
    Beiträge:
    582
    Zustimmungen:
    318
    It's only different by five stays though, not a huge difference. As for the reason.......
     
  3. Mark Thompson

    Mark Thompson Well-Known Member

    Registriert seit:
    10 September 2017
    Beiträge:
    1.806
    Zustimmungen:
    4.438
    Geschlecht:
    männlich
    Ort:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IMG_2716 copy-1.jpg IMG_9803.jpeg

    Are you quite sure it's "only 5 stays"?
     
    W.Williams und Bluenosejohn gefällt dies.
  4. RAB3L

    RAB3L Member

    Registriert seit:
    4 Januar 2013
    Beiträge:
    582
    Zustimmungen:
    318
    I was talking about the asymmetry!
     
  5. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.429
    Zustimmungen:
    8.990
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Only on NatPres could people get obsessed about an asymmetrically-placed firehole. It's as bad as Ian "Hubnut" Seabrook's obsession with windscreen wipers on motor cars.

    If it makes no difference to its performance in service, then what's the problem?
     
    staffordian gefällt dies.
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    28.831
    Zustimmungen:
    69.166
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Firstly, I don’t believe the firehole door is asymmetrically placed (that really would be a turn up for the books!). Rather, it is the staying pattern that is asymmetric.

    Given that (1) the stays are an integral part of the safe and reliable functioning of the boiler (2) different types have different physical properties and (3) this is a new boiler, not an old one that has had some stay holes drilled out, then that difference is notable. It may in the end not make a difference to the reliability of the boiler, but it is clearly a curious situation and the logic behind it (if there is logic, rather than a cock up) would be interesting to know.

    Tom
     
    RAB3L, Spinner, MellishR und 3 anderen gefällt dies.
  7. Hermod

    Hermod Well-Known Member

    Registriert seit:
    6 Mai 2017
    Beiträge:
    1.148
    Zustimmungen:
    321
    Geschlecht:
    männlich
    Ort:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The firehole ring is a very solid stay and flexible stays within two or three pitches serves no purpose.
    My guess is that there was not enough simple stay material at hand and to get the job done five flexibles were put in to the left of firehole.
     
  8. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    6.118
    Zustimmungen:
    2.883
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is the pattern of Stay installation a hangover from original design or from new design with more emphasis on siting of stays dictated by new stress analysis?

    Rather than a Rule of Thumb method as may have been used back then?
     
    Hirn gefällt dies.
  9. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.409
    Zustimmungen:
    3.704
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The fire hole door is central. Look at the flap catch and then upwards. Remember that the actual fire hole ring is rectangular on Meinigen boilers and the LNER style door is bolted over this.
     
    RAB3L und Spinner gefällt dies.
  10. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    5.186
    Zustimmungen:
    3.415
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    Being close by, thought yesterday would be an ideal opportunity for a few pics and see what the plans are next.
    Drove down to a deserted DLW, then realised that it was the 2nd week of the month, not the 1st or 3rd......
    Try again next week.
     
    CH 19 und Sheff gefällt dies.
  11. RAB3L

    RAB3L Member

    Registriert seit:
    4 Januar 2013
    Beiträge:
    582
    Zustimmungen:
    318
    More likely they miscalculated the number of flexibles required (manufactured outside?) and used normal stays instead, away from the corners where flexibles are less needed.
     
  12. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.409
    Zustimmungen:
    3.704
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably the most plausible explanation so far ….
     
  13. RAB3L

    RAB3L Member

    Registriert seit:
    4 Januar 2013
    Beiträge:
    582
    Zustimmungen:
    318
    Yes, they thought that we wouldn't notice:

    MEININGEN 0 NAT PRES RIVET COUNTERS 1
     
    Christopher125 und Sheff gefällt dies.
  14. Jimc

    Jimc Part of the furniture

    Registriert seit:
    8 September 2005
    Beiträge:
    4.168
    Zustimmungen:
    4.922
    Beruf:
    Once computers, now part time writer I suppose.
    Ort:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or, just maybe, it could be based on experience with the other boiler. Has anyone compared a photo of the boiler on Tornado as its currently configured? I note that the mix of stays on this boiler is significantly different from Tornado's boiler when it was first constructed.
     
    Last edited: 14 Dezember 2025
  15. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.409
    Zustimmungen:
    3.704
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Look up thread to my earlier post….. #4153
     
  16. W.Williams

    W.Williams Well-Known Member

    Registriert seit:
    20 Dezember 2015
    Beiträge:
    1.695
    Zustimmungen:
    1.605
    Beruf:
    Mechanical Engineer
    Ort:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The U shaped found rings have the U section on the inside... Struggling to understand why anyone would think they are on the outside...

    I would be very surprised if the addition of a large number of flexible stays has not been authorised and underwritten by a new stress analysis, either FEA or a classical mathematical analysis. The insuring body will want to know why there is a difference, and what that difference entails in terms of loadings.

    The longer you look at the pictures the more you realise someone somewhere has seen fit to make significant changes, not just to the back head but the side as well. Old design, lots of rigid stays, new design, a lot more flexible stays.

    The new design also has a lot fewer welded on lugs hanging around on the plates. Clearly, someone has made a decision to remove a lot of the welding in the firebox. That takes me neatly back around to a point iv made many times over the years, welding stress and plate support.

    Are the flexible rivet style stays welded in position? Hard to tell from the photos. If not, ask yourself, why has an engineering team seen fit to remove a massive amount of heat input in firebox fabrication...
     
  17. class8mikado

    class8mikado Part of the furniture

    Registriert seit:
    1 Juni 2009
    Beiträge:
    3.957
    Zustimmungen:
    1.718
    Beruf:
    Print Estimator/ Repository of Useless Informatio.
    Ort:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just to pose another question for which only a poke around will probably answer - the new boiler(s) are supposed to have increased water spaces ( and therefore a slightly smaller inner firebox, and also grate area) - is this evidenced on the photos ?
     
    Sheff gefällt dies.
  18. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.409
    Zustimmungen:
    3.704
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Other than seeing an inverted shot showing the bottom of the foundation ring I doubt you can tell?
     
    Hirn gefällt dies.
  19. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.409
    Zustimmungen:
    3.704
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    AFAIK the fkexibles are welded inside but the outside is a radiused head able to swing slightly with lateral movement of the plate. This is sealed by the welded domed cover you see.
     
  20. torgormaig

    torgormaig Part of the furniture Friend

    Registriert seit:
    17 Juli 2007
    Beiträge:
    5.298
    Zustimmungen:
    8.936
    I'm not quite sure what you are referring to here but on Bulleid boilers the U shape is visible externally even though the effect is internal. It looks very different to the more normal flat sectioned foundation ring bar. Here is the U shaped foundation ring for 34101 Hartland's boiler being made at Grosmont in 2011. IMG_2484 copy.jpg

    I should perhaps add that the new cylinder has nothing to do with Hartland. It proved to be a failed attenpt to fabricate a cylinder for 76079.

    Peter
     

Die Seite empfehlen