If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od The Black Hat, 13. Veljača 2011..

  1. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,169
    Lajkova:
    12,988
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The plan is indeed to slew the headhunt over to the running line this coming week. I understand it’s not quite that easy as the two lines aren’t at the same height but nothing a bit of jacking and packing can’t sort out.
     
    jnc and banburysaint like this.
  2. Neil W J Smith

    Neil W J Smith New Member

    Pridružen(a):
    4. Lipanj 2025.
    Poruka:
    27
    Lajkova:
    52
    Spol:
    Muškarac
    Grad:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And all that controversy about FS starting from Grosmont. I hate to be conspiratorial, but was such an effort made to start from the northern end of the line because the bridge situation was known about, and if it was deemed unsafe before the start of FS’s trains the money already banked in ticket sales, essential for the future of the line, could be claimed against insurance?
     
  3. Sulzerman

    Sulzerman New Member

    Pridružen(a):
    22. Siječanj 2025.
    Poruka:
    157
    Lajkova:
    168
    Spol:
    Muškarac
    Grad:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was the upcoming bridge work mentioned much at the AGM?
    A few pages back there was an allusion, from an insider, about operating a shorter railway in the future. Was he referring to this?
     
  4. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    9,083
    Lajkova:
    7,738
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That scenario sounds like consequent loss to me. Good luck with getting an insurance to cough up for that.
     
    35B, jnc i Sheff se sviđa ovo.
  5. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    6,088
    Lajkova:
    2,864
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  6. garth manor

    garth manor Well-Known Member

    Pridružen(a):
    10. Travanj 2009.
    Poruka:
    2,002
    Lajkova:
    565
    Any evidence for this wild accusation ?
     
  7. 60044

    60044 Well-Known Member

    Pridružen(a):
    24. Veljača 2016.
    Poruka:
    1,178
    Lajkova:
    1,652
    Spol:
    Muškarac
    Grad:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That suggestion sounds both conspiratorial and devious. It don't credit the SMT with sufficient intelligence to consider i a possibility. More to the point, past experience with trains running only from Pickering-Grosmont makes me wonder if they'll even have enough common sense to open the Goathland cafe this time.......
     
  8. garth manor

    garth manor Well-Known Member

    Pridružen(a):
    10. Travanj 2009.
    Poruka:
    2,002
    Lajkova:
    565
    Slew completed, Q6 to move before it is removed and reinstated for a swop on January 5th.
     
    47406 and banburysaint like this.
  9. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    5,233
    Lajkova:
    8,688
    ???

    Peter
     
  10. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,169
    Lajkova:
    12,988
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interpretation ( I think)
    The slewing of the headhunt to connect with the running line has been completed. The Q6 will now be moved before the slew is disconnected ( for safety reasons). It will be reconnected on the 9th January to allow further movements.
     
    banburysaint, jnc, MattA i 1 drugoj osobi se sviđa ovo.
  11. 60044

    60044 Well-Known Member

    Pridružen(a):
    24. Veljača 2016.
    Poruka:
    1,178
    Lajkova:
    1,652
    Spol:
    Muškarac
    Grad:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think the question being asked was probably why the slew needs disconnecting then reconnecting after such a short period of time. My guess (and it's only that) is that it is to allow PWay trains to be run to remove track material and spoil excavated from above the bridge arches.
     
  12. 21B

    21B Part of the furniture

    Pridružen(a):
    2. Rujan 2009.
    Poruka:
    4,730
    Lajkova:
    10,856
    If the slew is at the bottom of a gradient and now leads the main into the yard area where people work, you would disconnect to protect them, because any rail movement beyond the slew that has a brake failure or a slide etc etc is going to arrive quite suddenly.
     
    jnc, ykin01, Steve i 5 ostalih se sviđa ovo.
  13. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    5,233
    Lajkova:
    8,688
    Thanks, Steve. That makes sense now. I really could make no sense of the original post.

    Peter
     
  14. Steve

    Steve Nat Pres stalwart Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    13,169
    Lajkova:
    12,988
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Spot on.
     
    21B se sviđa ovo.

Podijelite ovu stranicu