If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Southwold Railway

Discussion in 'Narrow Gauge Railways' started by Bar Side, May 7, 2012.

  1. Sheff

    Sheff Resident of Nat Pres

    Joined:
    Apr 21, 2006
    Messages:
    8,482
    Likes Received:
    3,788
    Gender:
    Male
    Occupation:
    Retired Engineer & Heritage Volunteer
    Location:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well done! (I trust your hospitalisation was planned, and not as a result of your labours ? Either way get well soon).
     
    The Green Howards likes this.
  2. lynbarn

    lynbarn Well-Known Member

    Joined:
    Aug 22, 2006
    Messages:
    1,882
    Likes Received:
    698
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking good, one length of track at a time and before you know it, you will have quite a run.
     
  3. Breva

    Breva Part of the furniture

    Joined:
    Oct 11, 2010
    Messages:
    2,538
    Likes Received:
    4,354
    Location:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A little update about my objection. I hope there were lots of others from members of this forum.

    I received an acknowledgement from Suffolk.gov.uk, with the following text:

    The County Council has a statutory duty to investigate formal applications made to amend the definitive map of Rights of Way. Legislation states that the determination criteria is entirely evidence based, either documentary (historical records), user evidence or both. No weight can be attached to merit based issues such as need, desirability, cost, effect on the environment, safety and security or the wishes of any parties etc. It is purely whether the evidence in support is sufficient or not. This application was supported by a large amount of user evidence and under the legislation the alignment can only be that to which the evidence relates.

    Unless withdrawn before the end of the objection period (14 April) your letter along with all others received will be passed to the Planning Inspectorate to be determined by an Independent Inspector by way of a local public inquiry. Based on current timescales of other cases currently with the Planning Inspectorate, this is likely to take up to 2 years to take place.


    I'm not quite sure what this all means, but I've done my bit, and explained to the council the likely benefit of re-opening the railway, based on my experience with another one. I think you would need some legal advice to point out exactly what ticks the right boxes for those who decide. A lot of aspects seem to have no bearing whatsoever!
     
    lynbarn likes this.
  4. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    221
    Likes Received:
    943
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    thanks - neither, sadly - but we have a really good event team, and they excelled themselves - very nice to see, at last, an item in the income list which states - 'ticket sales! james (tho' it was probably one of the shortest passenger runs on record - even doing it twice each time - i.e. out/back/out/back still meant only about 330 yards or so. still - little acorns....)
     
    The Dainton Banker likes this.
  5. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    221
    Likes Received:
    943
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    thanks lynbarn - only wish it was as simple as that! we have, in a small way, very similar local objection problems as does the L & B - but we will win.... james
     
    lynbarn likes this.
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,818
    Likes Received:
    4,468
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It never ceases to amaze me, the sheer number of words it takes to say absolutely nothing.
    "Legislation states that the determination criteria is entirely evidence based, either documentary (historical records), user evidence or both."
    I'm wishfully allowing that phrase to do some heavy lifting, here.
     
    The Dainton Banker likes this.
  7. lynbarn

    lynbarn Well-Known Member

    Joined:
    Aug 22, 2006
    Messages:
    1,882
    Likes Received:
    698
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi James, I have just had a thought regarding the Cleminson chassis. I have a feeling that the Chasewater Railway near Birmingham, Brownhills, have one that they have used so it might be worth having a word with them.

    Regards

    Colin
     
  8. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    221
    Likes Received:
    943
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    some pics of the event j event 2026 1.JPG easter 2026 event 1.JPG easter event 2026 train departs.JPG
     
    ragl, GOEdwards, ilvaporista and 3 others like this.
  9. 3ABescot

    3ABescot Member

    Joined:
    Jun 14, 2019
    Messages:
    494
    Likes Received:
    958
    Location:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Surely that clarified the matter very well, and may be helpful to you? It means that the Right of Way decision needs to be based on hard evidence, not public or media pressure. It's some years since I was involved with the Planning Inspectorate and, occasionally, PRoW matters, but it's for the proposers to show that people have been using the route as a right of way for however many years, without let or hindrance or something like that. You need to show they haven't.
    NIMBY opinion against the railway is not in itself a factor. As people who have been there for years, you should be in a better position to give hard evidence than newcomers.
     
  10. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    221
    Likes Received:
    943
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     
  11. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,818
    Likes Received:
    4,468
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That particular phrase certainly had a degree of cut-through. Having said what I said, from what I have observed of the Planning Inspectorate in practice, evidence-based pragmatism does seem to be their modus operandi.
     
  12. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    221
    Likes Received:
    943
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    yes 3a bescot - indeed. the proposers have indeed shown - sworn testimony from local residents - that there has indeed been such use. sadly, we have only been there since early 2020 - we began the project at the height of covid.
    after all, no-one has seriously proposed re-instatement of sr before, let alone tried to do it, so all the trackbed is heavily compromised. we certainly submitted evidence about gates, etc. (which people just walked round) - and the wishes of the owner that it not be a prow - but that was ignored.
    the nimbys - via the pc - have seen an ideal opportunity - after all, who is going to try to stop them using a path that has been such for 85 years - and they have used it. the fact that it is then impossible to re-instate the railway there because of this - well, we know the reasons - but can't prove them....
    in balance, the two-year plus delay in granting (complicated by the upcoming unitary authority change) is probably good (though bizarrely scc assert that even before the order is granted, it is already a prow from their pov - which of course affects planning) - but it will delay our application for a diversion, as that can't be made until the prow is granted - and may well take 5 to 7 years to process, we are told. all a big can of worms.......but the success of Easter Monday nevertheless gives us all hope
    james
     
    Mark Thompson likes this.

Share This Page