GWSR General Discussion and Operations

Discussion in 'Heritage Railways & Centres in the UK' started by michaelh, Aug 25, 2013.

  1. banburysaint

    banburysaint Member

    Joined:
    Jan 12, 2008
    Messages:
    342
    Likes Received:
    466
    The line is contemporary with the Bicester cut off (the Chiltern line). The latter has suffered with embankment issues. This hasn't been helped by soil moisture deficits over dry summers with bands of clay being most susceptible. There is a band which runs across the Chilterns from east to west and I wouldn't be surprised if it reaches to the Gloucestershire and Warwickshire line. When a railway is renewed it is unusual to replace the earthworks, (rails, ballast, signalling systems, bridges are normally what is replaced). Also the knowledge of what makes up an earthwork is not well known surveys can be taken but I am aware of instances where the material suddenly changes.

    Sent from my LGN-NX1 using Tapatalk
     
    jnc likes this.
  2. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    31,838
    Likes Received:
    34,176
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The question that has been in my mind since Chicken Curve has been why this line has been so prone to problems
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Joined:
    Sep 9, 2013
    Messages:
    10,859
    Likes Received:
    19,442
    Gender:
    Male
    Location:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hey, that's our railway you're talking about there!

    I think it's accepted wisdom that the line was built quickly, and on the cheap. Combined with the particular local geology and geography, and lack of understanding at the time of construction, we are where we are. The good news is the impact is much less severe than in the past, in part I think we can put that down to the heroic efforts of our drainage team over the last decade or so.
     
  4. Enterprise

    Enterprise Part of the furniture

    Joined:
    Sep 9, 2005
    Messages:
    5,779
    Likes Received:
    3,753
    Prompted by this thread, I spent some time trying to find out some details of the local geology. For anyone who has a little knowledge of soil mechanics or geology, these links might be of some interest.

    https://www.researchgate.net/public...and_outcrop_patterns_from_temporary_exposures

    https://webapps.bgs.ac.uk/Memoirs/docs/B01641.html Ch.2 in particular.

    http://www.glosgeotrust.org.uk/downloads/Cotswolds LGAP.pdf
     
    jnc and hyboy like this.
  5. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,656
    Likes Received:
    2,882
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As Alex said, it's a combination of factors: local geology and geography, and lack of geotechnical engineering knowledge (i.e. the behavior of structures constructed of piles of earth) at the time of construction. Of these, I would rate the last as the most significant - although the geography, which required lots of embankments, played a significant role. Not so much the geology; there have been a few minor issues with the sides of cuttings, but nowhere near as bad as the embankment issues.

    I've been thinking about the geotechnical engineering issues, wondering if I could have done a better job, with the knowledge available at the time; I'm not sure I could/would have. Take the example I gave, where, when they dug down in a slumped embankment, they found a buried grass layer, where the earth of the original embankment had just been dumped straight onto the pre-existing turf (thereby providing a shear plane for the embankment to slide on). If I were given the job of building an embankment today, even without studying geotechnical engineering, I'd cut a trench in the turf, to tie the embankment in - because I now know of that failure mode. But in 1904? There's a good chance I wouldn't have.

    Several other lines have also had geotechnical engineering issues on embankments: e.g. the Bluebell (section of embankment South of Kingscote station); the NR N-S line at the Robertsbridge end of the RVR (of which they said "As part of the process of stabilising the bank [the contractor], dug out much of (what they call) peat packing material, being that used in the original construction back in the late 1800's, before replacing this with a more proven rock based packing/fill. Such were the construction methods of the age"). I vaguely recall some others, but can't be bothered to look for them.

    I think the GWSR has seen worse than these others only because it has a lot of high embankments.

    Noel
     
    banburysaint, 35B and 5944 like this.
  6. Breva

    Breva Part of the furniture

    Joined:
    Oct 11, 2010
    Messages:
    2,548
    Likes Received:
    4,375
    Location:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The GWSR Honeybourne line was a late build, one of the last in the country. It is pretty straight and level, meaning long cuttings and long embankments.
    It wasn't built by men with wheelbarrows ( eg Tring cutting) but by mechanical steam excavators and a temporary railway line with tippler wagons. So, lots of soil was moved around.
    Slipping soil has been an issue for a long time. There is both anecdotal and physical evidence of previous slip repairs, certainly during BR times, and probably earlier.
     
    banburysaint and jnc like this.
  7. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    31,838
    Likes Received:
    34,176
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All fair, yet these embankments are 50-60 years younger than many on the national network seeing much greater use (I’m listening to them go by from my desk!). If what you write is correct (and I’ve no reason to doubt it), the question then is what the earlier builders got right and later builders didn’t.
     
  8. brennan

    brennan Member

    Joined:
    Sep 11, 2016
    Messages:
    547
    Likes Received:
    628
    Location:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder what the contractual defects liability period was? Is any warranty remaining?
     
    Paul42 and flying scotsman123 like this.
  9. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,656
    Likes Received:
    2,882
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe those heavily-used lines on the national network got better maintenance; maybe they had improvements during those long lives. You'd need to study the detailed records for each.

    Noel
     
  10. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Joined:
    Sep 9, 2013
    Messages:
    10,859
    Likes Received:
    19,442
    Gender:
    Male
    Location:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Many mainline embankments have had significant works done over the years to be fair, much larger scale than we can contemplate affording proactively.
     
    jnc and 35B like this.
  11. Breva

    Breva Part of the furniture

    Joined:
    Oct 11, 2010
    Messages:
    2,548
    Likes Received:
    4,375
    Location:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting is that the section north of Broadway to Honeybourne West Loop (say 4 miles) is perfectly flat, with no cuttings or embankments.
     
    jnc likes this.
  12. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,006
    Likes Received:
    70,003
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, that's the Vale of Evesham for you ;)

    Tom
     
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,006
    Likes Received:
    70,003
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think there is a "one size fits all" answer - you would have to look at each structure and dig into its history, the local geology, subsequent maintenance etc.

    One issue on some lines - certainly an issue on the Bluebell - is the extent to which ash was used in construction. Normally when surveying a line, you would try to balance the cuttings and embankments, so that earth removed from a cutting could be used on a nearby embankment without having to be transported too far. But where that wasn't possible, you would have to bring in material, and as the railways developed, one material they had in abundance and which was essentially free except for the transport was ash. So land would be built up using ash, but I doesn't necessarily form a very stable structure. In heritage railway terms that problem is exacerbated by the fact that frequently, the lines we now have as heritage railways were often - not universally, but often - lightly used and built on the cheap.

    Tom
     
    jnc likes this.
  14. Sheff

    Sheff Resident of Nat Pres

    Joined:
    Apr 21, 2006
    Messages:
    8,492
    Likes Received:
    3,814
    Gender:
    Male
    Occupation:
    Retired Engineer & Heritage Volunteer
    Location:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I suggest that a valid comparison in terms of contemporaneous main lines would be the GCR London Extension?
    This was also built post the pick and barrow era. I’m not aware of any history of structural failures there?
    Not sure what conclusions can be drawn - different geology, ground works design, contractor?
     
  15. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    31,838
    Likes Received:
    34,176
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fair comment - and part of my curiosity
     
  16. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,656
    Likes Received:
    2,882
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ash may have been a factor in the most recent GWSR slip - "the soil here .. appears to be mostly ash and spent ballast."

    Odd that there's spent ballast in there too - that all can't date to the original construction of the line, then! As @Breva mentioned, "There is both anecdotal and physical evidence of previous slip repairs, certainly during BR times, and probably earlier." So not just used in construction, but also in 'repairs'.

    Noel
     
  17. bluetrain

    bluetrain Well-Known Member

    Joined:
    Mar 3, 2019
    Messages:
    1,666
    Likes Received:
    1,676
    Gender:
    Male
    Location:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I recall that there was a reference some years back (might have been in this forum or possibly the GWSR's own web site) to an account by GWR engineers of remedial works carried out in the 1920s. Two pieces of work were highlighted. Firstly a rebuild of the "chicken curve" embankment, which alas did not prevent mulitple recurrences in later years of problems at this location. Secondly, the construction of a retaining wall on the east side of the cutting just north of Toddington station. That retaining wall is visible today and, as far as I am aware, has done its job successfully.
     