If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

V2 4771 Green Arrow to return?

Discussion in 'Steam Traction' started by Davo, Mar 22, 2019.

  1. Kylchap

    Kylchap Member

    Joined:
    Dec 15, 2015
    Messages:
    521
    Likes Received:
    1,002
    Gender:
    Male
    Location:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A fabricated block could be a way forward, like the P2. It would depend on whether the highest priority for Green Arrow was retaining its originality or becoming operational. It seems that both are not possible.
     
  2. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    32,233
    Likes Received:
    34,841
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. My point, given the persistence of the view (myth?) that the monobloc is irreparable, is that the means of repair or replacement can't assume that a fabricated replacement would be acceptable.
     
    silversteellady and Miff like this.
  3. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,173
    Likes Received:
    70,747
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn’t there a question of reversibility? That is, hypothetically you could remove the existing cylinder block and preserve it; and replace with a new set of cylinders (of any construction method, it wouldn’t matter visually); but doing so wouldn’t preclude a later reconstruction of the loco with its original cylinders, albeit for static display only. So a restoration with new cylinders doesn’t seem to me to preclude a future return to “original” condition if that was deemed important. (*)

    (*) As an aside on that, if the monobloc cylinders are considered a significant engineering artefact in their own right, then they are probably better appreciated in any case as a standalone item, and possibly - speak it quietly! - sensitively sectioned.

    Tom
     
    green five, CH 19, Fred Kerr and 8 others like this.
  4. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    32,233
    Likes Received:
    34,841
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's a fair question, but that then also leads into questions of preservation ethics - questions that cannot be answered definitively, and are in reality matters of judgment rather than right/wrong
     
  5. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    3,233
    Likes Received:
    3,466
    I agree however, at least until the 2019 policy is revised, it may be assumed NRM’d be open to considering the idea if there was a source of funding. Otherwise, logically, the policy would either not have mentioned GA as a candidate or could easily have said it’d be considered only if the existing cylinders were repairable.
     
  6. osprey

    osprey Resident of Nat Pres

    Joined:
    Oct 3, 2007
    Messages:
    11,718
    Likes Received:
    3,332
    Occupation:
    semi-retired, currently doing R&D for my patents
    Location:
    Halifax
    I think casting techniques have moved on since the 1930's...
     
    Last edited: May 22, 2026
    class8mikado and Spamcan81 like this.
  7. MuzTrem

    MuzTrem Well-Known Member

    Joined:
    Mar 13, 2011
    Messages:
    1,044
    Likes Received:
    1,447
    My understanding was that initially, the plan was that 4771 would go to Doncaster temporarily whilst 990 was undergoing conservation work, and the two engines would be swapped in due course. Whether that is still the plan, I don't know. All I can say is that 990 remains on display in the Great Hall at present.
     
  8. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,980
    Likes Received:
    1,740
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Capabilities especially around moulds certainly have, but so have other production methods, especially for complex one offs.
     
  9. W.Williams

    W.Williams Well-Known Member

    Joined:
    Dec 20, 2015
    Messages:
    1,703
    Likes Received:
    1,619
    Occupation:
    Mechanical Engineer
    Location:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesing.

    With modern tecniques and tech, its all repairable, weld can be added, machined back, heat treated, etc etc, but there is a legitimate question on preserving the original block as part of the original rationale for preservation.

    If we want to preserve that, and run the machine, its reasonable to have a go at casting a new monoblock and put the old one on display.

    I suspect the bigger question here is that this cannot in any way be done in isolation.
    Tear out the monoblock and more will be found.
    And there is the boiler.

    So its almost certainly £1m before we even get out the gate... and... is it appropriate use of funds that the NRM have 2 mainline locos in ticket with all the associated costs at the same time... ???
     
  10. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,980
    Likes Received:
    1,740
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One hoped the Streamlined Duchess would be top of the list or is damaging the casing too much of a risk...
     
  11. Petra Wilde

    Petra Wilde New Member

    Joined:
    Mar 29, 2022
    Messages:
    60
    Likes Received:
    118
    Location:
    Freshwater, IOW
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes - if money was no object that would be a good way to do it. On the last point - after its removal to a museum, best would not be to section the original monobloc for display, but to make a (full sized … and working?) model of it and then section that, to be displayed alongside the unaltered original. Of course it’s vanishingly unlikely money would be found for such an elaborate solution. Possibly something could be done with a computer simulation instead, to show how everything worked.
     
  12. 242A1

    242A1 Well-Known Member

    Joined:
    Dec 3, 2006
    Messages:
    1,567
    Likes Received:
    1,315
    Some capabilities might have improved but capacity is another matter. Who would you approach to make such a monoblock casting? You would want it defect free and the original design would be in need of examination and adjustment to eliminate any weaknesses in that design. Gorton produced these monoblocks under the oversight of R.A. Thom since they presented a challenge. Were the cracking issues a problem brought about by the design or were they the result of limitations in foundry techniques which existed at the time?

    When the time came to discuss the cylinder block of the new P2 even the William Cook Group decided that they could not guarantee the outcome. The use of fabricated cylinders in preservation is not new, Talyllyn Number 1 had them fitted when first restored.

    What we are needing to address in the first instance is the notion of restoring the engine to working order. Who wants to do it? The Science Museum? Are they serious or just wanting some enthusiast engagement? If they are serious it moves on to funding. It won't be inexpensive and there is seldom a good time to appeal for funds. The engine needs a full examination, this is widely agreed upon. But people are concerned about what might be discovered after the engine is reduced to its component parts but this project needs to be sold as a full package. Full assessment followed by full renewals and repairs. The only thing which is going to be a challenge is the monoblock, preservation has already dealt with everything else many times over. Actually the monoblock isn't a real challenge, the solution already exists if we need a repacement the big question is will the original block repair. Won't know until we have really thorough look and you cannot really look if the cylinders are still fastened to the frames.
     
    ragl likes this.
  13. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,980
    Likes Received:
    1,740
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Perhaps the Science Museum are thinking that a Working Flagship Loco is worth having after all . At some point Scotsman is going to be out for a major overhaul so what do you replace it with. Perhaps a Brit isnt seen as right in that role. Mallard ?( told it will never happen) Duchess (too faffy ?) Green arrow... maybe - it even looks like Scotsman...
     
    Sheff likes this.
  14. W.Williams

    W.Williams Well-Known Member

    Joined:
    Dec 20, 2015
    Messages:
    1,703
    Likes Received:
    1,619
    Occupation:
    Mechanical Engineer
    Location:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Il bet good money that the thinking inside the SM group is that Scotsman ended up costing far more than anticipated, and this V2 thing has a cooked cylinder before anything else is even examined...
     
  15. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,141
    Likes Received:
    2,453
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Has the popularity of "Scotsman" translated into cold hard cash for the National Railway Museum?

    It cost them an absolute arm and a leg, and huge amount of proof they didn't know how to do it. Why would any organisation go through that again unless it absolutely knew it would be worth it?

    "Mallard" is the only one with the same cachet as FS, and there are several A4s in the wild (is SNG the only one operational at the moment?). The Duchess would be an even bigger job than than FS.

    If Green Arrow's middle cylinder is out of true, what effect does that have on the motion/frames/driven axle etc?
    Also, IIRC Green Arrow was active on railtours towards the end of steam - how many patch repairs were done as it was only going to need to work for just a little bit longer?

    The problem with museum-kept engines is that they risk becoming whited sepulchres, look lovely on the outside, but what creeping ooh-nasties are in the middle?
     
  16. osprey

    osprey Resident of Nat Pres

    Joined:
    Oct 3, 2007
    Messages:
    11,718
    Likes Received:
    3,332
    Occupation:
    semi-retired, currently doing R&D for my patents
    Location:
    Halifax
    "It cost them" ?...us, the tax payer, I imagine footed the bill..
     
  17. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,141
    Likes Received:
    2,453
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In real terms, I suspect the full cost of the rebuild, nevermind the overrun will cost you around a penny (depending on your definitions of "cost" and "us").
    If you've watched FS go through at full welly anywhere, I would submit you have had a very positive return on that penny.
     
  18. mdewell

    mdewell Well-Known Member Friend

    Joined:
    Mar 23, 2005
    Messages:
    2,189
    Likes Received:
    3,490
    Occupation:
    UK & Ireland Heritage Railways Webmaster
    Location:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When FS goes out of ticket, they can always lend it to MOSI for display. :D
     
  19. osprey

    osprey Resident of Nat Pres

    Joined:
    Oct 3, 2007
    Messages:
    11,718
    Likes Received:
    3,332
    Occupation:
    semi-retired, currently doing R&D for my patents
    Location:
    Halifax
    I'm not disputing the cost, as I made a substantial donation in 2004 to save it for the nation. I have only seen it once or so, since.
     
  20. The Green Howards

    The Green Howards Nat Pres stalwart

    Joined:
    Feb 20, 2016
    Messages:
    15,463
    Likes Received:
    9,029
    Occupation:
    Layabout
    Location:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes. 60009 is now retired: 4468 will likely never steam again, 60019 is on static display. You can forget the engines in the Colonies.
     

Share This Page