If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,589
    Likes Received:
    2,177
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's not to say that other stations can't be developed and marketed as destinations, though, even Levisham - but perhaps not Newtondale Halt! In the past there were horse-drawn cart rides from Newtondale, there's an artist in residence living on the station, and perhaps even the besom-making business could be revived as an attraction - and possibly others. Guided nature exploration tours could be based there too. Grosmont has a large engine shed that could and should be made more of as an attraction.
     
    MikeParkin65 and SECR 65 like this.
  2. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,005
    Likes Received:
    8,461
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We have stayed in both the pub and a rental in Levisham village, and hence used the train from there. I am not sure what you would have to do to make it somewhere worth spending a significant amount of time. It would be like Medstead on the MHR, and nice station with an good exhibition, but not somewhere to spend 60 or 90 minutes waiting for the next train. The loco shed is a stroll, I am not sure how many non enthusiasts would bother. I know having been there once I would never convince my wife it would be worth the effort again.
     
  3. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,589
    Likes Received:
    2,177
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You obviously didn't read the last line of my post. Lots of people do make the effort to walk to the loco shed but I don't thin anyone would deny it couldn't be improved to become a more attractive destination, and it is one that advertises itself by being alongside the train as it slows to arrive at Grosmont!
     
    MikeParkin65 likes this.
  4. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,636
    Likes Received:
    14,276
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The fundamental flaw in your argument is that the greatest traffic flow starts from Pickering and always has done. The traffic flow from Whitby is substantially less than that from Pickering so abandoning or even reducing trains from Pickering would be one big 'ouch'. Traffic originating in Whitby can largely be accommodated in one train at 10.00 but, perhaps that's because the next train, at 12.35, only allows you 20 minutes in Pickering so essentially just a train ride. That's largely as a result of reducing the service from eight trains/day to the current six (five on diner days).
     
    60044, Sulzerman and Sawdust like this.
  5. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,636
    Likes Received:
    14,276
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think that, relatively speaking, running on the six miles to Whitby is a cheap operation. There may be some additional costs but there are no infrastructure maintenance coasts to consider. I don't think even the additional costs are that huge. Yes,there's the necessary gubbins on the locos but these are one off capital costs. There are track access and station costs (at Whitby) and a requirement to man control whenever trains are running. Maintenance standards should be more or less the same although there isn't the ability to look at possible deviations on a risk assessment basis. i.e. wheel tyre profiles. The book of what you can and can't do is not penned by the railway.
     
    35B and jnc like this.
  6. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    32,839
    Likes Received:
    35,973
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed it is a re-run of that debate. But my point is not to reopen Whitby good/bad, but to highlight that for 17 miles of infrastructure with associated fixed costs, driving the maximum cash inflow is key. And with very limited capacity to expand the Whitby offering due to the constraints of the line between Grosmont and Whitby, combined with evidence that pricing has about reached the ceiling of what the market will bear, other income is required.
     
    Paul42 likes this.
  7. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    32,839
    Likes Received:
    35,973
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think all of these are worthwhile, but they're marginal.

    I see the same in a different context. We have visitors, who contribute by donating. Those who steward are rightly pleased with those donations, but the amounts are a drop in the ocean compared to the overall funding requirement. Balancing the enthusiasm with the distraction is a challenge that needs care.

    In a post-Heartbeat world, the challenge is to make days out to Grosmont and (especially) Goathland attractive. My own view is that, in summer, a key requirement is an hourly service so that places with limited interest (sorry, but it's true) don't require an excessive wait. When I stayed in the area with young children, the non-Whitby workings were invaluable for that - because you could get aboard them at Goathland or Levisham without fighting through the crowds. I know numbers are lower in recent years (another story), but the demand needs nurturing - and is I suspect profitable when assessed on the direct cost of operation - which also means cash generative.
     
    Sulzerman likes this.
  8. Sulzerman

    Sulzerman Member

    Joined:
    Jan 22, 2025
    Messages:
    254
    Likes Received:
    356
    Gender:
    Male
    Location:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've been consulting with my fag packet

    1 carriage per day (on a 5 day week) carrying 64 passengers at £38.50 would bring in £400,000 in a season.

    That equates to the amount brought in by Gift Aid in 2024.

    Ticket pricing is so sensitive and the price of £49.50 was felt by many to be too high.

    Today, passengers are paying less than they were paying in 2023!
     
    Sawdust likes this.
  9. Sawdust

    Sawdust Member

    Joined:
    Jul 18, 2015
    Messages:
    654
    Likes Received:
    1,118
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's interesting you mention heartbeat, I don't think it was the only driver of traffic because things were already on the up before the programme began production but obviously it did supercharge things once it became established.
    I think a bit of tweaking and careful pricing a lot of the demand will come back.

    Sawdust.
     
  10. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,005
    Likes Received:
    8,461
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To do what?
    Because the main thing on the NYMNP website seem to be about the railway and you already promote that.
    https://www.northyorkmoors.org.uk/places-to-go/goathland#things-to-do
     
  11. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,589
    Likes Received:
    2,177
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There's more to Goathland than Heartbeat! There's the walk down to the Mallyan Spout, there's the roman road, there's the (alleged!) history of witchcraft in the area, there's the winding house for the incline and the walk down the rail trail to Grosmont, cafes, shops etc. and then there's the Heartbeat exhibits scattered around. Perhaps even the Plough Stotts could be persuaded to perform on a regular (advertised!) basis in the peaki nseason! It is all crying out for better marketing!
     
  12. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,788
    Likes Received:
    3,118
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In other words, by significantly expanding paid staff, the NYMR may well have already run itself into a financial dead end from which there is no exit? (If so, I am very unhappy to point it out - but if this is the situation, sticking one's head in the sand about it won't help deal with it.)

    Whenever a 'turn around specialist' takes over a failing business, one of their usual first moves is to run an eagle eye over spending, and cut all the spending they can - including non-critical staff. Are you saying that UK employment law makes this an effectively impossible option (by increasing the cost of making someone redundant, to the point where such actions aren't helpful in reducing spending)? What does a turn-around specialist who is unable to find enough non-staff spending cuts do? Use administration, which must include provision for less expensive staff reductions (less liquidation be the only possible alternative option in such cases)?
    Most other heritage lines seem to manage without a large complement of paid staff?

    As I have pointed out before, the in the vintage rail world, 'Beeching' is a bad word, but one must assume that his staff were not incompetent, in judging which lines would/could not do enough business to support a complement of paid staff - and the NYMR did not make the grade. (Yes, I know, it was a long time ago, and much has changed since then - but it is suggestive.)
    A process which will be harder/impossible for the NYMR, which has apparently already irretrievably saddled itself with a large fixed cost structure.

    Noel
     
  13. The_Rail_WAy

    The_Rail_WAy New Member

    Joined:
    Apr 2, 2019
    Messages:
    39
    Likes Received:
    54
    Gender:
    Male
    Location:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have to agree that there isn’t much of an incentive for someone on a day rover ticket to get off at any station in between Whitby and Pickering other than Grosmont which has a very generous access to loco sheds etc.

    The line (in my short experience) is also very stop start. For me the waiting time at Gotland is always too long, the approach to Goathland in itself is very sluggish, and there are too many standing still stops and slow downs between Goathland and Pickering when you really feel the loco could be ‘going’ for it.

    I do like the railway but these factors, as well as the limited steam running and the delayed opening are
    not particularly endearing to someone who lives locally like myself who could be using it a lot more often.
     

Share This Page